id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
ajst-30544	Hang, Chaochao	Research on Plugging Technology of Underwater Shield Tunnel During Operation Period	2025	6	.pdf	application/pdf	3338	181	55	However, water leakage treatment measures only apply to the treatment scheme after water leakage occurs in the shield tunnel. Therefore, it is necessary to deeply discuss the plugging process at the water seepage site, and propose treatment measures for water leakage at segment joints, segment bolt holes and segment secondary grouting holes.	cache/ajst-30544.pdf	txt/ajst-30544.txt
