id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
ajst-30547	Yu, Xingguo	Analysis of Ground Settlement of Double-Track Tunnel Undercrossing Shallow Overburden Silt Layer	2025	6	.pdf	application/pdf	3329	188	52	Yang Fengfeng[10] demonstrated that the Peck prediction curve needs to be modified in order to accurately predict the settlement of the soil above shield tunnels. During the shield tunneling process, due to the confined nature of underground space and the complexity of geological conditions, it is common for the tunnel to pass beneath existing surface structures and underground facilities[2].Therefore, in order to ensure the safety and stability of construction personnel as well as surface and underground structures, extensive attention has been paid by researchers and engineering professionals to the control and mitigation of ground settlement induced by shield tunneling[3][4][5].Xu Xu	cache/ajst-30547.pdf	txt/ajst-30547.txt
