id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
ajst-5538	Zhang, Jiaqi; Zhang, Lin	Evaluation of X-shaped Intersection Reconstruction Scheme in Small and Medium-sized Cities	2023	4	.pdf	application/pdf	3223	122	54	Conclusion By analyzing the primary and secondary contradictions of traffic demand, combined with peak traffic flow data and actual intersection road conditions, this paper improves the traffic capacity of intersections in the traditional intersection reconstruction design and the organizational form of left-turn traffic on the borrowed road. Traffic spikes during peak hours, but the timing of intersection signals is fixed, reducing the efficiency of intersections. (3) The Lin Yin road is set up as 2 lanes of the entrance road and 1 lane of the exit road at the intersection.	cache/ajst-5538.pdf	txt/ajst-5538.txt
