id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
ajst-946	Wang, Le; Geng, Dajiang; Jin, Xuesheng; Miao, Enxin; Qian, Jinsheng	Integrated Construction Technology of Large-Scale Floor Structure and Decorative Surface	2022	5	.pdf	application/pdf	4265	198	53	(3) Control the flatness of floor construction The flatness of the floor construction is mainly controlled by the flatness of the cement concrete base, and the wear- resistant material is only a dense layer with a thin surface, so controlling the flatness of the surface before the initial setting of the concrete is a key process. Academic Journal of Science and Technology ISSN: 2771-3032 | Vol. 2, No. 1, 2022 169 Integrated Construction Technology of Large‐Scale Floor Structure and Decorative Surface Le Wang1, Dajiang Geng1, Xuesheng Jin1, Enxin Miao2, Jinsheng Qian1 1 China Construction Fourth Bureau Sixth Construction Co., Ltd., Shanghai 201100, China 2 China Construction Fourth Engineering Bureau Co., Ltd. Shanghai 201100, China Abstract: In order to solve the many deficiencies in the construction method of secondary pouring of large-scale floor decoration surface layer, this paper proposes the integrated construction method of large-area floor plate structure and decorative surface layer, and clarifies the principle, main technological process and quality of construction process of this construction method.	cache/ajst-946.pdf	txt/ajst-946.txt
