id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
ap-5070	Sellitto, Miguel Afonso	LEAD-TIME, INVENTORY, AND SAFETY STOCK CALCULATION IN JOB-SHOP MANUFACTURING	2018	7	.pdf	application/pdf	4718	235	65	LT i – lead-time of order i; LTm – mean order LT ; LTσm – standard deviation of the order LT ; LTmw – mean part LT ; Qi – amount of value added by order i; ∑n i=1 Qi – total amount dispatched by all orders; LTσw – standard deviation of the part LT ; RI m – mean arrival rate of orders or parts; WIPm – mean WIP; Pm – mean throughput; ∆Tmax – maximum time elapsed between the arrival of two successive orders. The Throughput Diagram. in which: LT i – lead-time (LT ) of order i in the current work centre; TPE i – completion time of order i in the previous work centre (time of liberation); TPEU i – completion time of order i in the current work centre. n – number of orders.	cache/ap-5070.pdf	txt/ap-5070.txt
