id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
ap-724	Holický, M.	Fuzzy Optimisation of Structural Performance	2005	6	.pdf	application/pdf	4775	192	49	It is assumed that the objective function is given by the total cost C(� ) expressed approximately as a sum C C CD( ) ( ) ( )� � � �� �0 , (3) where C0(� ) is given as the sum of the construction and maintenance cost, �(�)CD is the expected malfunction cost; here CD denotes the cost of full damage (full malfunction or serviceability failure) and � denotes the decision parameter (for example the mass per unit length or the cross section area). Note that for the standard deviation �S � 0.2 r1 the op- timum mean �S is in both cases considerably lower (from 0.8 r1 to 0.95 r1).	cache/ap-724.pdf	txt/ap-724.txt
