id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
ap-824	Popovac, M.	Reconstruction of the Old Bridge of Mostar	2006	10	.pdf	application/pdf	5160	229	64	Dismantling the remenants bridge One of the first tasks of the contractor for the actual re- construction of the bridge was to prepare the Site around the Old Bridge. About 200 pieces of pottery were found on the site – dat- ing form the 15th to 20th century, about twenty stone and one metal cannon balls, about 250 metal wedges from the structure of wooden bridge, one copper coin and several mediaeval tools.	cache/ap-824.pdf	txt/ap-824.txt
