id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
app01-5694	Hilar, Matouš; Srb, Martin; Nosek, Jakub	A HEADRACE TUNNEL RECONSTRUCTION IN TURKEY	2019	6	.pdf	application/pdf	3355	183	63	Tunnel lining strengthening in front of the collapse 1 area was realised prior to start of re-excavation. Pumping of the self-levelling concrete C35 into the cavern started after tunnel lining under the collapse 2 (including permanent rockbolting, second meshes covered by shotcrete, and also the left side propping).	cache/app01-5694.pdf	txt/app01-5694.txt