id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
app01-5695	Hohberg, Jörg-Martin	3D FEM ANALYSIS OF THE CONSTRUCTION PIT FOR A TBM-DRIVEN FLOOD DISCHARGE GALLERY	2019	7	.pdf	application/pdf	2786	155	59	The Sihl at Zurich main railway station in 1910 (left) and alternative flood relief projects (right) But even with the very low stiffnesses and low strengths of parameter set B2 (Table 2) the absolute displacements do not exceed 1.3mm (Figure 7).	cache/app01-5695.pdf	txt/app01-5695.txt
