app01-7036	Zaťko, Maroš	FOUNDATION OF THE NEW RAILWAY BRIDGE OVER THE NOSICKÁ DAM ON THE RIVER VÁH	2021	5	.pdf	application/pdf	3948	160	62	Bored piles, as well as vibrated sheet piles, welding and assemblage work have all been carried out from a floating pontoon platform and also there was jet grouting applied to stabilize embankments. Preparatory work As part of the preparatory work for operating on water, also embarkation of equipment and materials, there was realized a dock edge between pillars P11 and P12 made of vibrated sheet piles reinforced by a circumferential stiffening beam.	cache/app01-7036.pdf	txt/app01-7036.txt