id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
app01-7847	Barták, Jiří	INFLUENCE OF NEW CONSTRUCTION PROJECTS ON VINOHRADY TUNNELS	2022	6	.pdf	application/pdf	3225	154	57	The following text only presents the assessment of construction phases 500 and 600 (demolition, construc- tion pit, new buildings) in section III’, which were the most important for the assessment of Tunnels II and III, with respect to the effect of asymmetric loading acting on the Tunnel III and the fact that the foun- dation base of the new buildings is in close proximity to the external surface of the lining of Tunnel III. PHASE 500: The diagram for the assessment in Phase 500 Demolition and Construction pit in section III’ is presented in Figure 8. The abutment wall has a 2m wide corridor in the middle, which is connected with Tunnel II and Tunnel III by transverse galleries, also 2m wide (see Figure 1).	cache/app01-7847.pdf	txt/app01-7847.txt