id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
app01-9363	Kruntorád, Jan; Týfa, Lukáš	Vision Zero application on Czech railways	2023	5	.pdf	application/pdf	3372	152	48	Stakeholders’ categories To completely cover the entire railway system, the classification of railway entities was carried out as follows: • state administration and self-government (including subordinate organizations), • owners and operators of the railway infrastructure, • railway carriers, • customers of carriers and providers of specific ser- vices to carriers and railway operators, • the human factor in rail transport, • investors, manufacturers, suppliers and contractors of infrastructure and vehicles, • manufacturers, suppliers and operators of IT and ITS systems, • entities providing power electricity supplies (trac- tion and non-traction), • scientific research and testing institutions, • international institutions, • affected entities from other modes of transport. Content of the risk catalogue sheet (fiche): • risk factor code and risk name, • partial specification of the risk situation (description of the causes of the risk situation), • RPN value (see above) and ranking in the evaluation of the risk significance, • risk assessment – opportunities for change and risk mitigation (comprehensive view), • proposal of high-level measures for change and risk mitigation from the ITS area, which is at least par- tially within the competence of the Správa železnic (the study orderer), • specification of the link of high-level measures to the Správa železnic (the degree of implementation of measures by the Správa železnic; proposal of the organizational units of the Správa železnic that should address the measures), • specification of the link of high-level measures to other stakeholders in the railway sector, • positives (advantages, benefits) of the proposed measure (strengths and opportunities in the sense of SWOT analysis), • negatives (limitations, difficulties) of the proposed measure (weaknesses and threats in the sense of SWOT analysis), • the general time requirement of the implementation of the proposed measure (length of preparation and implementation of the measure, division into stages, continuity with other measures), • recommended technical, technological and organi- zational means for implementing the proposed mea- sure, • any additional notes.	cache/app01-9363.pdf	txt/app01-9363.txt
