id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
azojete-1170	Kindole, A.; Lingwanda, M. I.; Tekka, R. S.	A Systematic Review of Value Engineering Practices in Construction Projects in Tanzania	2025	14	.pdf	application/pdf	7332	333	29	In Tanzania, research shows that VE has not been formally integrated into any phase of construction projects, despite its recognized potential to maximize project value (Mziray et al., 2015). 1 Clear objective of VE Study 2 VE knowledge and experience of the VE team 3 Conducting Site visits 4 Professional experience and knowledge of VE team in their own disciplines 5 VE clause or policies in the construction contract 6 Conducting VE study before the construction phase (timing of VE study) 7 Knowing about characteristics and type of project which has successful possibility of VE implementation 8 Allocating time for VE study 9 Academic qualifications of the VE team 10 Applying VE to high-cost projects 11 VE Study Stage Comparing the initial design with alternative designs from cost perspective 1 Generating creative and innovative ideas which can give maximum cost efficiency 2 Choosing the most feasible alternative which can help in cost saving and possible implementation 3 Making several alternatives of construction method that can save budget of project 4 Comparing the initial design with alternative designs from engineering perspective 5 Comparing the initial design with alternative designs from time perspective 6 Use of functional analysis 7 VE study based on the availability of construction drawing 8 Making several alternatives that can fulfil the main function 9 VE study with identifying the high-cost areas or works of the project 10 VE Post-Study Stage Develop and plan for implementation the result of VE 1 Client’s support and active participation in the VE implementation 2 Incentives to VE team as a result of project cost efficiency 3 Supporting Factor Cooperation, follow-up trailing, and support from all related parties (stakeholders) of project to implement VE 1 Active cooperation, interaction, and brainstorming among VE team, during pre-study until implementation of VE result 2 Logistics and financial support to implement the result of VE 3 1.3 Global Perspectives on VE in Construction Projects Recent studies highlight VE as one of the most effective management tools for improving the efficiency of construction projects in both developed and developing countries (Elsonoki et al., 2020).	cache/azojete-1170.pdf	txt/azojete-1170.txt