id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
azojete-894	Maren, I. B. ; Adisa, A. B. ; Dandakouta, H. ; Ejilah, R. I. 	Performance Evaluation of a Hybrid Solar-Wind Power System for Heipang Community Load Demand	2024	20	.pdf	application/pdf	7676	354	50	=50%, 𝐶𝑏𝑎𝑡𝑚𝑎𝑥. is maximum capacity of battery = 1,512𝑘𝑊ℎ 2.3.4 Energy management strategy of hybrid solar wind power system The role of control strategy management in hybrid solar-wind power system is very important in system operation. The designed system is based on 2 days autonomy, meaning the battery can supply power for two consecutive days when there is no power generation by either solar, wind or both power systems which is the minimum requirement for solar wind power system design (Adeoye et al., 2022), (Broomfield Designers, 2017).	cache/azojete-894.pdf	txt/azojete-894.txt
