id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
azojete-943	Tsapi, T. K.; Tongwa, M. K.; Soh, B. D.	Integrating Bowtie Analysis into Band Saw Maintenance	2024	12	.docx	application/vnd.openxmlformats-officedocument.wordprocessingml.document	4854	233	50	The Bowtie diagram in Figure 5 provided controls that should be used to prevent this particular threat from occurring; training personnel on proper pump maintenance, performing regular inspections and others from the left side of the Bowtie. The results of the Bowtie risk assessment for hazards associated with the impeller, pump housing, saw blade, clamp, and seal pump were developed to structure the decision-making process with better information visualization.	cache/azojete-943.docx	txt/azojete-943.txt
