ARID ZONE JOURNAL OF ENGINEERING, TECHNOLOGY & ENVIRONMENT AZOJETE June 2020. Vol. 16(2):309-320 Published by the Faculty of Engineering, University of Maiduguri, Maiduguri, Nigeria. Print ISSN: 1596-2490, Electronic ISSN: 2545-5818 www.azojete.com.ng Corresponding author’s e-mail address: adeke.pt@outlook.com 309 ORIGINAL RESEARCH ARTICLE CAPACITY AND PERFORMANCE ASSESSMENT OF WURUKUM ROUNDABOUT IN MAKURDI METROPOLIS: A COMPARATIVE STUDY USING ARCADY AND SIDRA INTERSECTION SOFTWARE P. T. Adeke1*, A. Etika2, A. A. Atoo1 (1Department of Civil Engineering, College of Engineering, Federal University of Agriculture Makurdi, Nigeria 2Institute for Transport Studies (ITS), University of Leeds, United Kingdom) *Corresponding author’s email address: adeke.pt@outlook.com 1.0 Introduction An efficient roundabout is essential in the distribution of traffic to various routes of a traffic network for smooth flow at its optimum services. The performance of roundabout is a function of its capacity, driver behaviour, delay, queue lengths, Origin-Destination (O-D) flow, fuel consumption and pollution emission (noise and small particles), vehicles and pedestrians characteristics, Level-of-Service (LOS), and gap acceptance among others. (Akcelik, 2008; Dixit, 2012; Grossi, et al., 2012; Akcelik, 2017a; Yusuf et al., 2018). Furthermore, the capacity and ARTICLE INFORMATION ABSTRACT Following the recent public outcry over delays and long queues at the Wurukum Roundabout Makurdi due to increase in travel demand at the road intersection, it is not certain if the performance of the roundabout is satisfactory based on engineering specifications and judgment. Therefore, simulation of the 5-arm at-grade intersection was carried out using Assessment of Roundabout Capacity and Delay (ARCADY) and the Signalised (and unsignalised) Intersection Design and Research Aid (SIDRA INTERSECTION) Software. The geometric dimensions of the roundabout were measured and manual traffic counts were used to obtain average travel demand matric from the morning (8:30 – 9:30 am) and evening (4:30 – 5:30 pm) peak periods, and heavy vehicle proportion of Origin-Destination (O-D) flows on the roundabout. Simulation models of the Wurukum roundabout were built using ARCADY and SIDRA INTERSECTION software to measure its capacity and performance based on key parameters such as Level of Service (LOS), average geometric delay and queue length among others. Though significant variations were observed among estimated performance indices, results obtained from the simulated models and statistical analysis (test of hypothesis using Chi-square test) indicated that the roundabout operates at failed state classified as LOS F at its present condition. Recommended strategies to improve the capacity and performance of the roundabout included any of the following; construction of a fly-over bridge connecting the Northern and Southern approaches as permitted by site physical features, signalisation of the roundabout with traffic signs, proper pavement markings and adjustment of its geometric features, or redesign and construction of road network within Makurdi metropolis to divert and reduce traffic demand on the roundabout © 2020 Faculty of Engineering, University of Maiduguri, Nigeria. All rights reserved. Submitted 16 June, 2019 Revised 02 March, 2020 Accepted 08 March, 2020 Keywords: Wurukum roundabout ARCADY SIDRA INTERSECTION Lane utilisation Degree of saturation Level of Service (LOS) http://www.azojete.com.ng Adeke et al: Capacity and Performance Assessment of Wurukum Roundabout in Makurdi Metropolis: A Comparative Study using ARCADY and SIDRA INTERSECTION Software. AZOJETE,16(2):309-320. ISSN 1596-2490; e-ISSN 2545- 5818, www.azojete.com.ng Corresponding author’s e-mail address: adeke.pt@outlook.com 310 performance of roundabout is also affected by its geometric features, driver behaviour, visibility, traffic characteristics, frequency of priority reversal act, etc. (Design Manual for Road and Bridges - DMRB, 2007; Akcelik, 2008; Findley et al., 2016: ARCADY, 2017). Previous researches have examined roundabout capacity and performance level using several methodologies (Highway Capacity Manual - HCM, 2010; Macioszek and Akcelik, 2017; Akcelik, 2017b). Inefficient roundabout constitute congested traffic condition characterised by long queue lengths, high level of pollution, prolonged waiting time and consequently long travel times among others (Akcelik et al., 1996; Sheehan, 2010). These characteristics create unhealthy environment when it is saturated with pollutants, and also affects the social-economic wellbeing of commuters that are using the roundabout in terms of delays and abuse of value of travel time. Essential geometric parameters used for roundabout analysis include; average effective flare length, conflict angle, inscribed circle diameter, entry width, approach half width and entry kerb radius (Akçelik, 1997; DMRB, 2007; SIDRA INTERSECTION 8 User Guide, 2018). The remedies of failed roundabout caused by high travel demand, O-D flow pattern or geometric dimensions include signalisation of the roundabout, conversion to grade separated intersection and adjustment of traffic network layout. Advantages of signalised roundabout include improved capacity and a balanced or evenly shared delay on approaches (Bernetti et al., 2003). The choice of converting an existing roundabout to a grade separated intersection or alteration of traffic network with the aim of decongesting a roundabout is usually capital intensive as it is relatively expensive and affects land use policies within the right-of-way. The Wurukum roundabout is a 5-arm (including exit street) at-grade central intersection connecting cardinal parts of Makurdi metropolis by roads. Due to its central location in the metropolis, all traffic within the metropolis converge on the roundabout to link with other parts of the metropolis. It is not certain if the present performance status of Wurukum roundabout is satisfactory or gives hope for acceptable performance in the near future. Though unpublished, previous studies by the Department of Civil Engineering, Federal University of Agriculture Makurdi on the roundabout revealed that, traffic growth within Makurdi has increased drastically in recent times (DCE-UAM, 2017), thereby affecting the performance of the roundabout. Increased traffic volume is associated with congested traffic situation which generates negative transport externalities such as increased travel costs (fuel and delay), pollution, etc. (Sheehan, 2010; Gudmundsson et al., 2015). There are several simulation software used for examining the present performance of road intersections or for future performance predictions. These models include; Assessment of Roundabout Capacity and Delay (ARCADY), Verkehr In Städten – Simulationsmodell (VISSIM) meaning Traffic in cities - simulation model in German, Highway Capacity Manual (HCM), Signalised (and unsignalised) Intersection Design and Research Aid (SIDRA) INTERSECTION software etc. (Vaiana et al., 2012; Akcelik, 2017a). 1.1 ARCADY Model Like other roundabout capacity simulation models, the ARCADY software is used for simulation of roundabouts to predict capacity and performance as well as accident risk. ARCADY is a software built in the United Kingdom by Transport and Road Research Laboratory (TRRL) currently referred to as Transport Research Laboratory (TRL) based on regression models built from empirical studies of roundabouts in the UK for roundabout simulation (Brown, 1995; http://www.azojete.com.ng Arid Zone Journal of Engineering, Technology and Environment, June, 2020; Vol. 16(2) 309-320. ISSN 1596-2490; e-ISSN 2545-5818; www.azojete.com.ng Corresponding author’s e-mail address: adeke.pt@outlook.com 311 Akcelik, 1997; Akcelik, 2017b). The software examines the relationship between roundabout arm capacities as a function of its geometric dimensions and circulating flow which hinder vehicle entry on the circulatory roadway. The ARCADY model estimates roundabout arm capacity as a function of circulating flow using the relationship given as Equation 1; Qe = Fi − fiQc (1) where, Qe is the entry capacity (pcu/h), Qc is the circulating flow (pcu/h), Fiandfi are constants representing intercept and slop respectively, which are estimated from geometric characteristics of the roundabout. Capacity and performance analysis of roundabout using ARCADY software is based on approach or arm capacity (ARCADY, 2017). Though ARCADY model was built after empirical examination of about 84 roundabouts in the UK within the period of 10 - 12 years based on UK’s unique roundabout characteristics and driver behaviours, it is not out of place for other countries to examine its suitability in capacity and performance assessment as well as accidents risk with or without further calibrations as the case may be, since the software has undergone modifications over the years to suit other countries traffic system like Canada, USA, etc. (ARCADY, 2017). Some researchers such as Akcelik (2011, 2017b) and Weber (2014), have criticised the suitability of ARCADY software for roundabout analysis in terms of capacity and performance prediction. Some of the critiques include; lane-by-lane modelling concept, that ARCADY considers entering traffic to be evenly distributed on the circulatory carriageway irrespective of the demand flow with respect to lane configuration on both entry and circulatory carriageways; this affects capacity estimation of roundabouts with irregular lane configuration (Akçelik, 2011; Akçelik, 1997). Its entry lane analysis model is based on simulation techniques rather than empirical studies hence generates unrealistic results (Weber, 2014). ARCADY’s empirical capacity prediction is based on the geometry and circulating flow passing in front of an approach; it ignores other capacity mechanisms (Weber, 2014; Akçelik, 2011). The Gap-acceptance theory and driver behaviour or traffic flow theorem are not considered by ARCADY; hence predictions are incorrect since in reality, there are several anomalies such as priority reversal which might halt circulating traffic to standstill (Akçelik, 2011). Finally, the calibration of ARCADY model is based on geometries considered in the LR942 study, hence results are prone to errors when used on other roundabouts (ARCADY, 2017). In spite of the above criticism, the adoption of ARCADY by this study is justified by the fact that, the geometry of roundabout and driving rules in the UK are akin those in Nigeria (Federal Ministry of Works, 2013). Following the previous empirical studies, ARCADY software was found to use the average vehicle length of 5.75 m and specified average threshold values of 0.85 for volume/capacity ratio or degree of saturation beyond which the performance of an arm is classified as having LOS F, meaning it has failed. An average of 36 seconds delay and 20 veh. for queue lengths are used as acceptable thresholds for good performance. Required geometric parameters for roundabout simulation using ARCADY software included; approach half and entry widths, average effective flare length, entry angle, entry kerb radius and inscribed cycle diameter. These parameters were measured on site using guidelines stated in the Design Manual for Roads and Bridges (DMRB) (2007) as shown in Figure 1. file:///C:/Users/user/Downloads/azojete143/www.azojete.com.ng Adeke et al: Capacity and Performance Assessment of Wurukum Roundabout in Makurdi Metropolis: A Comparative Study using ARCADY and SIDRA INTERSECTION Software. AZOJETE,16(2):309-320. ISSN 1596-2490; e-ISSN 2545- 5818, www.azojete.com.ng Corresponding author’s e-mail address: adeke.pt@outlook.com 312 Figure 1: Definition of Roundabout Features (DMRB, 2007) 1.2 SIDRA INTERSECTION Model On the other hand, SIDRA is an acronym for Signalised (and unsignalised) Intersection Design and Research Aid. SIDRA INTERSECTION is a simulation software first released in 1984 used for road intersection analysis and design. It is an advanced lane based and driver-path micro- analytical tool used for capacity and performance analysis of stand-alone intersections and network of intersections, including modelling of separate movement classes of vehicles ranging from light vehicles, heavy vehicles, buses, bicycles, large trucks, light and rails/trams etc. The SIDRA INTERSECTION software analyses intersections using lane-based micro-analytical approach on stand-alone intersections or in a given road network considering different types of vehicles and dynamic human behaviour. Its roundabout capacity model considers the effects of O-D pattern of flow, lane usage (utilisation) on multiple-lane approaches with heavy and unbalanced flows. The capacity and performance models of SIDRA INTERSECTION were calibrated using real-life and simulation data. The use of SIDRA software for intersection analysis http://www.azojete.com.ng Arid Zone Journal of Engineering, Technology and Environment, June, 2020; Vol. 16(2) 309-320. ISSN 1596-2490; e-ISSN 2545-5818; www.azojete.com.ng Corresponding author’s e-mail address: adeke.pt@outlook.com 313 has been commendable over time. The software is capable of estimating intersection performance measures such as capacity, LOS, delay (geometric or operational), queue length and stops for vehicles and pedestrians, fuel consumption of all vehicles using the roundabout in terms of cost ($/km) and rate (L/100km), amount of emitted air pollutants from vehicles tail pipe such as carbon dioxide, hydrocarbon, carbon monoxide, nitrogen oxides in kg/hour, performance index estimated from the combined statistics of server variables, etc. The SIDRA INTERSECTION software within its framework provides operational alternatives of using the HCM models for estimating essential performance variables. According to the SIDRA INTERSECTION 8 User Guide (2018), using its micro-analytical technique, the gap acceptance lane capacity in SIDRA INTERSECTION is estimated using Equation 2; Q = s.u 2 where, Q is the capacity of a given lane (veh./h), s is its saturation flow rate expressed as 3600/tf (veh./h), where tf is defined as the follow-up headway (sec.), and u is the unblocked time ratio. The unblocked time ratio is the proportion of time when vehicles can depart from the queue of a specified lane. Though researches on the suitability and improvement of the SIDRA software for intersection analysis and design stated long ago, works on its improvements are still ongoing (Akcelik et al., 1998; Akcelik, 2008). The software has gain wide acceptance around the world from transport infrastructural planners and development experts over the years in USA, Europe, Australia, South Africa, New Zealand, Malaysia, Singapore, Latin America and Arabian Peninsula (SIDRA INTERSECTION 8 User Guide, 2018). The aim of this study is to carry out a comparative study on capacity and performance assessment of the Wurukum roundabout using ARCADY 9 and SIDRA INTERSECTION 8 software. Specific objectives of the study included the assessment of the geometric features and travel demand pattern on the roundabout using guidelines specified in the ACARDY 9 and SIDRA INTERSECTION 8 user manuals, and simulating the capacity and performance of the roundabout using ARCADY and SIDRA INTERSECTION based on its present status. Solutions to improve the roundabout’s performance if found inefficient were proposed. 2.0 Materials and Methods 2.1 The Study Area Makurdi is the capital city of Benue state in Nigeria. It falls within the North-central geopolitical zone of Nigeria. Makurdi metropolis lies on the Benue trough linking the North and Southern parts of Nigeria within Latitudes 7°50’20’’N and N7°37’60’’N and Longitudes 8°19’30’’E and E8°40’20’’E. The Wurukum roundabout site is situated at 7° 43’ 56” N and 8° 32’ 21”E coordinates (Google Earth, 2017). According to the 2006 national population census (NPC, 2006), Makurdi metropolis has an estimated human population of 367,588 persons with a landmass of approximately 800 km2. The metropolis is separated by the River Benue into Makurdi-North and Makurdi-South. The population of the metropolis is dominated by civil servants, business men and women, and students. The location of Wurukum roundabout in the Makurdi metropolis is as shown in Figure 2. file:///C:/Users/user/Downloads/azojete143/www.azojete.com.ng Adeke et al: Capacity and Performance Assessment of Wurukum Roundabout in Makurdi Metropolis: A Comparative Study using ARCADY and SIDRA INTERSECTION Software. AZOJETE,16(2):309-320. ISSN 1596-2490; e-ISSN 2545- 5818, www.azojete.com.ng Corresponding author’s e-mail address: adeke.pt@outlook.com 314 (a) Extract Map of Makurdi metropolis (Google Earth, 2017) (b) Layout of Wurukum Roundabout Figure 2: Layout of the Wurukum Roundabout Road network in Makurdi metropolis is aligned such that all major routes link to the central roundabout which receives and distributes influx and exit traffic respectively within the metropolis. The symmetrical nature of road network in Makurdi metropolis made the study of traffic flow pattern simple since all major routes within the city are linked to a common central intersection called the Wurukum roundabout. The roundabout connects traffic from the North (N), West (W), South (S) and East (E) approaches namely Lafia road, Iorchia Ayu road, Otukpo road and Gboko road respectively. There is also an exit street named Onitsha Street between the North and East (NE) approaches. Traffic streams within Makurdi metropolis basically consist of private cars, motorcycles (Okada), tricycles (Keke Napep), minibuses, taxicabs and trucks, meant to convey people, goods and services from one place to another. 2.2 Data Collection The geometric dimensions of Wurukum roundabout were measured using steel measuring tape and protractors. Essential parameters measured included; Entry width (e), Approach half width (v), Average effective flare length (l’), Entry angle (ϕ), Entry kerb radius (r) and the Inscribed circle diameter (D). A classified daily manual traffic count was carried out from 06:00 am to 06:00 pm to obtain Average Daily Traffic (ADT), and percentages of heavy vehicles based on O-D flows on the roundabout using writing materials for a period of two weeks with emphasis on morning (8:30 – 9:30 am) and evening (4:30 – 5:30 pm) peak periods. The average hourly traffic demand for morning and evening peak periods were obtained for all arms to generate average travel demand and percentage of heavy vehicles matrices based on Passenger Car Unit per hour (pcu/h) of travel demand. 2.3 Development of ARCADY Model A simulation model of Wurukum roundabout was built at the University of Leeds, United Kingdom using ARCADY software based on its geometric parameters and travel demand matrix, as well as the percentage proportion of heavy vehicles. The built ARCADY model was simulated to examine its performance. Essential performance parameters targeted included; maximum average queue length, maximum delay, volume/capacity ratio and LOS which collectively defined performance of the roundabout in the context of ARCADY software. N http://www.azojete.com.ng Arid Zone Journal of Engineering, Technology and Environment, June, 2020; Vol. 16(2) 309-320. ISSN 1596-2490; e-ISSN 2545-5818; www.azojete.com.ng Corresponding author’s e-mail address: adeke.pt@outlook.com 315 2.4 Development of SIDRA INTERSECTION Model Development of the SIDRA INTERSECTION models involved the use of some input parameters characterising the site layout (same as for ARCADY model) and traffic behaviour and flow at the Wurukum roundabout were specified under the movement definition, lane geometry, lane movement, travel demand and the vehicle movement data tabs. Default settings for all exits lanes under the lane movements tab were ignored since the site was analysed as a standalone site and not a whole network. Also, pedestrians’ behaviour at the roundabout were not considered. A simulation run of the configured system yielded detailed output results which described the performance of the roundabout. The diagnostic section of detailed output reports were used to check errors and troubleshoot during simulation iterations. 2.5 Statistical Analysis for Fitness Test The Chi-squared test at 5% level of significance was used to test the performance similarity of both models with a null hypothesis of being equal to aid decision of the analysis. 3. Results and Discussion 3.1 Site Geometry and Traffic Flow Rate The geometric dimensions and O-D flow rate matrix based on adjusted travel demand using Peak Hour Factor (PHF) on Wurukum roundabout for year 2016 were as shown in Tables 1 and 2 respectively. Table 1: Geometric Dimensions of Wurukum Roundabout Approaches No. of Lanes v (m) e (m) l' (m) r (m) D (m) ϕ (0) S 1 5.50 8.80 29.20 38.10 50.00 17.00 E 2 7.80 13.90 21.00 17.65 50.00 13.00 N 2 6.20 12.90 20.10 10.85 50.00 15.00 W 2 8.80 12.10 24.50 33.64 50.00 24.00 NW 2 6.15 12.00 - - 50.00 - Table 2: Average O-D Flow Matrix (PCU/h) Approaches S E N W NW Total Origin S - 1223 337 425 24 2009 E 221 - 455 1110 103 1889 N 166 537 - 853 397 1953 W 722 1385 684 - - 2791 Total Destination 1109 3145 1476 2388 524 8642 The N and S traffic volume travelled on undivided road corridors with relatively narrow lanes as shown in Table 1. The average flare length which served as storage spot for waiting vehicles on all approaches ranged between 20 – 30 meters. Table 2 shows that, average total travel demand on the roundabout within the study period was 8642 pcu/h, with the W corridor carrying relatively high volume of traffic followed by the N. Approach E has the least volume of traffic lower than N approach. The percentage of heavy vehicle demand matrix on the Wurukum roundabout was as shown in Table 3, with S and N approaches having relatively high percentages of heavy vehicles. file:///C:/Users/user/Downloads/azojete143/www.azojete.com.ng Adeke et al: Capacity and Performance Assessment of Wurukum Roundabout in Makurdi Metropolis: A Comparative Study using ARCADY and SIDRA INTERSECTION Software. AZOJETE,16(2):309-320. ISSN 1596-2490; e-ISSN 2545- 5818, www.azojete.com.ng Corresponding author’s e-mail address: adeke.pt@outlook.com 316 Table 3: Demand Percentage of Heavy Vehicles Approaches S E N W S - 2.4 3.2 0.01 E 1.1 - 2.2 0.01 N 2.9 1.8 - 0.02 W 0 0.1 0.01 - This proportion distribution is attributed to the haulage of oil and gas products as well as agricultural products from the southern to northern part and vice versa in Nigeria. 3.2 Simulation Results The summary of simulation results for ARCADY 8 (ADY) and SIDRA INTERSECTION 8 (SDI) software were as shown in Table 4. Table 4: Summary of Simulation Results Legs Average Delay (s) Average Queue (veh.) Degree of Saturation LOS Junction Delay (s) Junction LOS ADY SDI ADY SDI ADY SDI ADY SDI ADY SDI ADY SDI S1 4861 1140.0 6.37 F 2511 1498 F F SA 9657 4861 1691 3267 3.53 6.37 F F E1* 123.1 75.8 1.08 F E2* 117.3 87.9 1.08 F EA* 5 120 3 87.9 0.74 1.08 A F N1 816.7 212.6 1.87 F N2 808.0 294.6 1.87 F NA 164 812 89 294.6 1.10 1.87 F F W1 369.9 303.5 1.39 F W2 372.8 254.0 1.39 F WA 340 371 250 303.5 1.18 1.39 F F * Subscripts 1, 2 and A define the inner lane, outer lane and maximum weighted average results respectively for the S, E, N and W approaches of the SIDRA INTERSECTION iterations. Table 4 presents parameters used for performance examination based on outputs of ARCADY and SIDRA INTERSECTION software. ARCADY model presents average results for entire approach, while the SIDRA INTERSECTION software presents results for lane-by-lane analysis of each approach. Both software yielded approximately similar results for lane degree of saturation, lane LOS, junction delay and junction LOS variables which described performance of the roundabout. Using the average threshold values specified by the models, Table 4 revealed that the performance parameters of the roundabout for approaches N, W and S showed poor performance using both models, which indicated a failed performance at LOS F. From the ARCADY model, the maximum average delay and queue length on approaches showed that performance of the S approach was relatively worse compared to the N and W approach lanes. The E approach performed relatively better compared to the N, W and S approach lanes. This was due to the degree of saturation of all lanes constituting the N, W and S approaches being greater than the weighted average threshold of 0.85 units defined by ARCADY model. Though http://www.azojete.com.ng Arid Zone Journal of Engineering, Technology and Environment, June, 2020; Vol. 16(2) 309-320. ISSN 1596-2490; e-ISSN 2545-5818; www.azojete.com.ng Corresponding author’s e-mail address: adeke.pt@outlook.com 317 the combined effects of lanes for the E approach had degree of saturation of 0.74 units which was less than the threshold, hence was the only approach performing within permissible LOS at present. Based on analysis using the ARCADY model, though approach E performed at LOS A, the failure of approaches N, S, and W to attain fair LOS affected the performance of the entire roundabout leading to its failed status. Therefore, based on these performance parameters, ARCADY software described the holistic performance of the roundabout at LOS F. On the other hand, results obtained from simulations using the SIDRA INTERSECTION software also showed some similarities to those obtained using ARCADY software, as shown in Table 4. Though the analysis carried out by the SIDRA INTERSECTION model were on a lane-by-lane bases, results presented in Table 4 showed both the lane and approach performance estimated as the weighted averages of the lanes performance. This average is defined as the weighted averages of iteration runs for individual lane performance per approach (Akcelik, 1996, 1997; SIDRA INTERSECTION 8 User Guide, 2018). Results obtained from the E approach indicated a relatively good performance which conformed to findings of the ARCADY models, though still classified as failed at LOS F by the SIDRA INTERSECTION models. These results indicate slight similarity with those of the ARCADY models which classified the E approach at LOS A since other performance parameters such as maximum average delay and queue length of the E approach showed relatively low magnitude as compared to the N, W and S approaches. Based on these performance statuses, the SIDRA INTERSECTION software classified the Wurukum intersection at LOS F which conforms to results of the ARCADY Software. The test of hypothesis using chi square statistical test for similarity of results between the ARCADY and SIDRA INTERSECTION models at 5% level of significance and 3 degree of freedom with a null hypothesis of both being equal is as shown in Table 5; Table 5: Statistical Analysis – Chi Square Test Models Chi Square (χ2) Values Decision Computed Critical Average Delay (s) 5361.79 7.81 Rejected Average Queue (Veh.) 320.85 7.81 Rejected Degree of Saturation (%) 1.72 7.81 Accepted Table 5 also shows significant variations in the magnitude of performance outputs estimated using the ARCADY and SIDRA INTERSECTION models. Differences between the estimated average delay and average queue length per approach leading to rejection of the null hypotheses was attributed to the fact that, while SIDRA INTERSECTION model carried out lane- by-lane analysis of the intersection which required detailed lane specifications such as flow distribution proportion, lane utilisation, etc. (SIDRA INTERSECTION 8 User Guide, 2018), the ARCADY model carried out holistic analysis of the entire roundabout based on approach characteristics regardless of lane-by-lane properties to arrive at overall performance of the intersection (ARCADY, 2017). There was no significant difference in the estimated degree of saturation of both models leading to acceptance of the null hypothesis, hence the parameter confirm similarity in travel demand situation considered by both models (Akçelik, 1996; 1997). file:///C:/Users/user/Downloads/azojete143/www.azojete.com.ng Adeke et al: Capacity and Performance Assessment of Wurukum Roundabout in Makurdi Metropolis: A Comparative Study using ARCADY and SIDRA INTERSECTION Software. AZOJETE,16(2):309-320. ISSN 1596-2490; e-ISSN 2545- 5818, www.azojete.com.ng Corresponding author’s e-mail address: adeke.pt@outlook.com 318 4. Conclusion A simulation and comparative analysis of the 5-arm at-grade Wurukum roundabout situated in Makurdi metropolis using ARCADY and SIDRA INTERSECTION software was carried out. The simulation results revealed that, there were statistically significant differences between estimated average delay and average queue lengths on approaching lanes by both models, leading to rejection of the null hypotheses. On the other hand, there was no significant difference between estimated degrees of saturation from both models, hence the null hypothesis was accepted. Also, both models described the holistic performance of the roundabout at its present state as LOS F characterized by prolonged waiting times and long queue lengths on its approaches, especially the N, W and S approaches. In spite of variations in estimated outputs of the models which depended on different mathematical models used, results of the simulation analysis using the two software proved the failed status of the roundabout at LOS F. It was therefore concluded that, the Wurukum roundabout has failed based on its performance tests using ARCADY and SIDRA INTERSECTION software, hence calls for reengineering for improved performance. The following recommendations were made; Following the successes of using fly-over bridges to improve roundabout performance as stated in previous studies, this study therefore recommends the construction of a Fly-over bridge connecting the N and S approaches of the roundabout to separate traffic streams and ease traffic flow as permitted by land use policy on the site. Signalisation of the roundabout with road signs and proper pavement markings as well as alteration of geometrical features – expansion of weaving length on all legs and additional lane on the S approach will help increase its capacity and performance thereby eliminating high cost of compensation and major re-construction works on the site. Alteration of the entire road network in Makurdi metropolis to redirect and reduce traffic demand on the roundabout will reduce high traffic demand significantly, hence improve its performance. Acknowledgement The authors acknowledge the supports rendered by Balogun O. Abdulmateen of the Department of Civil Engineering, Federal University of Agriculture Makurdi, while conducting the study; and the academic license of the SIDRA INTERSECTIONS software granted by Rahmi Akcelik of SIDRA INTERSECTIONS Australia. References Akçelik, R. 1996. Intersection Perforamcne Measures for Variable Demand, Working Document WD TO 96/036, ARRB Transport Research Ltd, Vermont South, Australia. Akçelik, R. 1997. Lane-by-lane Modelling of Unequal Lane Use and Flares at Roundabouts and Signalised Intersections: the SIDRA Solution, ARRB Transport Research Ltd, Australia Traffic Engineering + Control, 38 (7/8): 388 - 399. Akcelik, R. 2008. Roundabouts in Australia. Akcelik and Associates Pty, Ltd. Greython Victoria, Australia. http://www.azojete.com.ng Arid Zone Journal of Engineering, Technology and Environment, June, 2020; Vol. 16(2) 309-320. ISSN 1596-2490; e-ISSN 2545-5818; www.azojete.com.ng Corresponding author’s e-mail address: adeke.pt@outlook.com 319 Akçelik, R. 2011. Roundabout Model Comparison Table, Akcelik and Associates Pty Ltd P.O Box 1075G, Greythorn, Vic 3104 AUSTRALIA. Akcelik, R. 2017a. An Assessment of the Highway Capacity Manual Edition 6 Roundabout Capacity Model. Paper Presented at the 5th International Roundabout Conference, Transport Research Board, Green Bay, Wisconsin, USA. Akcelik, R. 2017b. Roundabout Comparison Table. Akcelik and Associates Pty Ltd, Greythorn, Australia. Akcelik, R., Christensen, B. and Chung, E. 1998. A Comparison of Three Delay Models for Sign- Controlled Intersections. 3rd International Symposium on Highway Capacity, Copenhagen, Denmark, 22 – 27 June 1998, (1), Edited by Rysgaars, Road Directorate, Ministry of Transport, Denmark, 35 – 56. Akcelik, R., Chung, E. and Besley, M. 1996. Performance of Roundabout under Heavy Demand Conditions. Road and Transport Research, 5 (2): 36 – 50. ARCADY 9. 2017. Assessment of Roundabout Capacity and Delay, Transport Research Laboratory (TRL), United Kingdom. Bernetti, G., Dall’Acqua, M. and Longo, G. 2003. Unsignalised vs Signalised Roundabouts under Critical Traffic Conditions: A Quantitative Comparison. Association for European Transport, London, United Kingdom. Brown, M. 1995. The Design of Roundabouts. Transport Research Laboratory State –of-the-Art- Review, HMSO, London, United Kingdom. DCE-UAM, 2017. Archives of the Department of Civil Engineering, University of Agriculture Makurdi, Nigeria. Design Manual for Roads and Bridges (DMRB) 2007. Road Geometry-Junctions, Geometric Design of Roundabouts, Part 3, 6(2), TD 16/07, London, United Kingdom. Dixit, VV. 2012. Modelling Origin-Destination Effects on Roundabout Operations and Inflow Control. Journal of Transportation Engineering, 138 (8): 1016 – 1022. Federal Ministry of Works 2013. Highway Manual Part 1: Design, Volume 1: Geometric Design, Federal Republic of Nigeria, Abuja, Nigeria. Findley, DJ., Schroeder, BJ., Cunningham, CM. and Brown, TH. 2016. Highway Engineering; Planning, Design, and Operations. The Boulevard, Langford Lane, Oxford, United Kingdom. Google Earth, 2017. Google Earth, United States of America. Accessed on 21th February, 2015, Grossi, R., de Riso di Carpinone, V. and Tocchetti, A. 2012. Functional Characteristics and Safety of Two-lane Rural Roads, SIIV – 5th International Congress – Sustainability of Road Infrastructures, Procedia – Social and Behavioural Sciences 53, Napoli, Italy, October 2012, 921 – 932. Gudmundsson, H., Hall, RP., Marsden, G. and Zietsman, J. 2015. Sustainable Transportation. Indicators, Frameworks, and Performance, Management. Springer Texts in Business and Economics, London, United Kingdom. HCM. 2010. Highway Capacity Manual. Transportation Research Board, National Research Council, Washington DC. file:///C:/Users/user/Downloads/azojete143/www.azojete.com.ng Adeke et al: Capacity and Performance Assessment of Wurukum Roundabout in Makurdi Metropolis: A Comparative Study using ARCADY and SIDRA INTERSECTION Software. AZOJETE,16(2):309-320. ISSN 1596-2490; e-ISSN 2545- 5818, www.azojete.com.ng Corresponding author’s e-mail address: adeke.pt@outlook.com 320 Macioszek, E. and Akcelik, R. 2017. A Comparison of Two Roundabout Capacity Models. Paper Presented at the 5th International Roundabout Conference, Transport Research Board, Green Bay, Wisconsin, USA, 8 – 10 May 2017, 1 – 15. NPC 2006. National Population Commission, Federal Republic of Nigeria Official Gazette, 94, No. 24, Abuja, Nigeria. Sheehan, MD. 2010. Congestion Pricing in Traffic Control, Transportation Issues, Policies and R&D Series. New York: Nova Science Publishers Inc. SIDRA INTERSECTION 8, 2018. Signalised (and unsignalised) Intersection Design and Research Aid (SIDRA INTERSECTION) Software, User Guide, Akcelik and Associates Pty Ltd P.O Box 1075G, Greythorn, Vic 3104 AUSTRALIA. Vaiana, R., Gallelli, V. and Luele, T. 2012. Simulation of Observed Traffic Condition on Roundabouts by Dedicated Software, SIIV – 5th International Congress – Sustainability of Road Infrastructures, Procedia – Social and Behavioural Sciences 53, Napoli, Italy, October 2012, 742 – 754. Weber, P. 2014. Introduction to Roundabout Analysis Using ARCADY, Toronto SimCap User Group Technical Event and ITE Toronto Section Social Event, Toronto. Yusuf, IT., Abur, AA., Ako, T. and Bilewu, SO. 2018. A Quantitative Analysis of Rotary Intersections in an Urban Metropolis, Nigeria. Malaysian Journal of Civil Engineering, 30(2): 282 – 295. http://www.azojete.com.ng