id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
brj-22420	Khademibami, Laya; Shmulsky, Rubin; Senalik, Christopher Adam; Seale, Roy Daniel; Ross, Robert J.; Mohammadabadi, Mostafa; Ward, Keith; Williamson , Thomas	Flexural Testing of Structural Insulated Panels Before and After Creep Testing	2023	9	.pdf	application/pdf	3439	174	62	Depth Before After Before After Target 30 30 30 30 Actual 31 29 32 30 Phase 2: 90-day full-scale duration of load tests with matched specimens, followed by 30 days with no load for creep recovery (creep test) 3323 Phase 3: Final full-scale short-term bending tests on the specimens subjected to the 90- day duration of load test followed by a 30-day recovery cycle Phase 3 testing followed the same protocol as Phase 1, wherein destructive static testing of two SIP’s depths, 16.5 and 31.1 cm (6.5 and 12.25 in.), was conducted in short duration 1/3-point bending per ASTM-D6815 (2015).	cache/brj-22420.pdf	txt/brj-22420.txt
