A Systematic Approach to the Optimal Planning of Energy Mix 

for Electric Vehicle Policy 

Aritotle T. Ubandoa,*, Ivan Henderson V. Gueb,c, Monorom Rithb, Jeremias 

Gonzagaa,b, Neil Stephen A. Lopeza, Jose Bienvenido Manuel M. Bionaa 

aMechanical Engineering Department, De La Salle University, 2401 Taft Avenue, Manila, 0922, Philippines 
bGraduate School, Mechanical Engineering Department, De La Salle University, 2401 Taft Avenue, Manila, 0922, 

 Philippines 
cMechanical Engineering Department, FEU-Institute of Technology, 839 P. Paredes St, Sampaloc, Manila, 1015, Philippines 

 aristotle.ubando@dlsu.edu.ph 

Electric vehicle offers a cleaner and sustainable alternative to transportation as it eliminates direct carbon 

dioxide emission through the conventional internal combustion engine. With the increase in the global population 

and economic development, the demand for transportation and the adoption of electric vehicles is 

unprecedented. However, the adoption of electric vehicle on a national-scale requires long-term planning of 

infrastructure development, and energy generation and distribution. The study focuses on the development of 

a systematic mathematical programming approach in the optimal planning of the energy mix of the additional 

power generation capacity arising from the adoption of the electric vehicle in a developing country. The study 

considers the 2030 horizon which includes, the cost of power generation and distribution per energy mix, and 

the forecasted commissioning and decommissioning of energy plants. The study proposes a fuzzy mixed-integer 

non-linear programming model in the optimal planning of the energy mix for the adoption of EV while minimizing 

carbon footprint, minimizing the total capital cost, and minimizing the electricity cost. A case study in the adoption 

of electric vehicle in the Philippines will be utilized to demonstrate the capability of the model. In addition, a 

comparison of the electricity cost of the business as usual (BAU) scenario and this study has been evaluated. 

The results show that the various renewable energy technologies for power generation are selected initially from 

2019 to 2022 and 2029 to 2030, while the fossil-fuel based power plants were utilized from 2023 to 2028. The 

results revealed the electricity cost from the study is relatively lower than the BAU scenario. The results of the 

model are intended to aid and guide policymakers in the potential adoption of electric vehicles, especially in the 

energy planning sector. 

1. Introduction 

Electric vehicles (EV) present an alternative solution for transportation without the direct dependence to fossil-

based fuels. In urban areas, the reduction of exhaust transportation emissions such as carbon dioxide (CO2) 

have direct relation to improving the air quality resulting to the decreasing health concerns of urban dwellers 

(Vienneau et al., 2015).  However, Jochem et al. (2015) argued that the reduction of CO2 emissions from shifting 

to EV may only be realized if the electricity is generated from either renewable energy sources or nuclear energy. 

To further aid the energy planning for the potential adoption of EVs in a nation, a systematic approach in the 

optimal planning of energy generation is needed specially in accounting the additional electricity requirements 

of EVs. Previous studies have been conducted in the optimal planning of energy mix. Haikarainen et al. (2019) 

utilized a multi-period mixed-integer linear programming (MILP) model for the optimal planning of intermittent 

renewable energy sources such solar and wind energy coupled with storage technologies in a region by 

minimizing the investment, operations, and maintenance (O&M) costs. A multi-objective evolutionary algorithm 

and EnergyPLAN software was used by Prina et al. (2019) for determining the additional technologies required 

in a district-wide scale while minimizing the investment and O&M costs. Both studies are significant in the 

advancement of a systematic approach in the optimal planning of the energy mix of a region and district, but 

 
 
 
 
 
 
 
 
 
 
                                                                                                                                                                 DOI: 10.3303/CET1976192 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Paper Received: 15/03/2019; Revised: 17/04/2019; Accepted: 24/04/2019 
Please cite this article as: Ubando A.T., Gue I.H.V., Rith M., Gonzaga J., Lopez N.S.A., Biona J.B.M.M., 2019, A Systematic Approach to the 
Optimal Planning of Energy Mix for Electric Vehicle Policy, Chemical Engineering Transactions, 76, 1147-1152  DOI:10.3303/CET1976192 
  

1147



lacks the application for the use of additional requirement for electric vehicles especially on a national scale. 

Most of the optimization models developed for the application of EVs are focused on vehicle energy consumption 

on drivetrains (Luin et al. 2019), routing and relocation with charging schedule (Iacobucci et al., 2019), projected 

car ownership (Du et al., 2019), and car sharing systems (Lemme et al., 2019 ), to name a few. A literature 

review was reported by Lemme et al. (2019) on the recently developed sustainability optimization models for 

EV planning. Other country-specific models consider the impact of electric vehicle to the energy mix. Rupp et 

al. (2019) assessed the carbon impact on the use of diesel and electric buses in Germany and its effect to the 

electricity mix. Groppi et al. (2019) evaluated the additional electricity requirements from the adoption of electric 

vehicles in an Island in Italy using EnergyPLAN and HOMER software. However, there have been no studies 

focused in the optimal planning of electricity generation on a national-scale satisfying the additional power 

requirements from EV adoption while minimizing the carbon footprint, capital cost, and the electricity price. In 

order to include these multiple objectives in the optimization model, the application of fuzzy set-theory in a linear 

programming model is proposed such that the partial satisfaction of the multi-objectives are achieved through a 

linear membership function (Zimmermann, 1978). Recent studies have shown the use of a fuzzy linear mixed-

integer linear programming (FMILP) model on the optimal design of bioenergy systems for negative carbon 

emission (Ubando et al., 2014) and the optimal operational adjustment of an off-grid renewable energy plant 

(Ubando et al., 2019). A fuzzy mixed-integer non-linear programming (FMINLP) model has been utilized to 

evaluate the synergetic involvement of a support tenant in a biomass-based eco-industrial park (Ubando et al., 

2016). Thus, this study proposes the use of an FMINLP for the optimal planning of the energy mix of a nation 

from 2019 to 2039 to satisfy the additional electricity requirement from the adoption of EV while simultaneously 

minimizing the carbon footprint of electricity generation, the total capital costs, and the electricity price. A case 

study on the Philippines is presented to demonstrate the developed model on the potential adoption of EV in 

the country. The study aims to aid the government and the EV industry on the potential adoption of EVs and 

hybrids in the country. 

2. Fuzzy Mixed Integer Non-Linear Programming Model (FMINLP) 

The fuzzy mixed-integer non-linear programming model consists of the objective function and the constraint 

shown in the following equations. 

Max λ 

s.t. 

(1) 

Aij = xjk yik (2) 

ytk = ∑i yik bik                                          i = 1, 2, … 7 (3) 

bik = {0,1} (4) 

xmaxj,k ≥ ∑j xjk                                                          j (5) 

ztk = ∑i Fi yik                                          i (6) 

ztk ≤ ztuk + λ(ztlk – ztuk) (7) 

CCtk = ∑j CCaj xjk                                  j  (8) 

CCtk ≤ CCtuk + λ(CCtlk – CCtuk)             k  (9) 

bj,k ≤ bj,k+1                                              k = 1, 2, … 11  (10) 

ECk = ∑i Pik (yik + ycik) / (TCk + ytk)        i = 1,2, … 7  (11) 

ECk ≤ ECuk + λ(EClk – ECuk)                  k  (12) 

where the subscripts i represents the processes, j represents the product streams, and k is time in years; 

whereas the superscripts l indicates the lower limit of a factor and u indicates the upper limit of a factor; λ is the 

degree of satisfaction, A is the technology matrix, x is the technology scaling vector, y is the product demand 

vector, b is the binary technology vector, yt is the total electricity demand in MW, xmax is the maximum allowable 

1148



capacity of a technology, zt is the carbon footprint vector, F is the carbon dioxide emission per technology, ztl is 

the lower threshold limit of the carbon footprint, ztu is the upper threshold limit of the carbon footprint, CCt is the 

total capital cost of the technologies, CCa is the unit capital cost per electricity produced, CCtl is the lower 

threshold limit of the total capital cost, CCtu is the upper threshold limit of the total capital cost, EC is the 

electricity cost, P is the price of electricity per technology, ycik is the current installed capacity, yc is the current 

installed capacity, TC is the total projected capacity of the business as usual (BAU) scenario, ECl is the lower 

threshold limit of the electricity cost, ECu is the upper threshold limit of the electricity cost.  

The objective function shown in Eq(1) ensures the degree of satisfaction is maximized. The model employs the 

max-min aggregation rule where λ is the lowest degree of satisfaction and it seeks for a synchronized solution 

which approaches the desired target of the considered multi-objectives . Different objectives indicate conflicting 

goals, thus, implying a compromise solution among the multi-objectives where a partial satisfaction is achieved 

if the λ-value is between 0 to 1. The λ-value represent an aggregated numerical representation of the 

compromise solution where a value of 1 indicates that all objectives are fully satisfied while a value of 0 implies 

that the solution has reached an undesirable state. The objective function is subject to the constraints shown in 

Eqs(2)-(12). 

The technology matrix Aij is solved through the product of the process scaling vector xjk and the product demand 

vector yik illustrated in Eq(2). The total electricity demand ytk is calculated with sum product of the product 

demand vector yik for all electricity streams from various technology ( i = 1, 2, … 7) and the binary vector bik 

as depicted in Eq(3). The binary vector bik is used to indicate if a technology will be used in the generation of 

electricity if its value is equal to 1 or if it is not considered if the value is equal to 0 as shown in Eq(4). The total 

power generation capacity should not exceed the maximum allowable capacity of a technology xmax as shown 

in Eq(5). The total carbon footprint is defined as the sum product of the carbon dioxide emission per technology 

Fi and the product stream vector yik as illustrated in Eq(6). A piecewise linear membership function describes 

the solution for the carbon footprint objective bounded by the lower (ztlk) and upper (ztuk) limits of the total carbon 

footprint as defined in Eq(7). The total capital cost CCtk is represented by the sum product of the unit capital 

cost per electricity produced CCaj and the process scaling vector xjk as shown in Eq(8). The total capital cost 

CCtk seeks to be minimized in a piecewise linear membership function bounded by the lower (CCtlk) and upper 

(CCtuk) limits of the total capital cost described in Eq(9). In considering a power generating technology across 

multiple timeframes k, it is important to ensure that an installed plant capacity on a certain timeframe will remain 

installed thereafter. This significant design consideration is made possible through Eq(10) where the binary 

value of the recent timeframe (bj,k+1) is greater than or equal to the binary value of the previous timeframe (bj,k). 

The economic potential of the electricity ECk is equal to the sum product of the price of electricity per technology 

Pik and the ratio of all the product streams (yik and the ycik) with the total projected electricity produced which 

comprise of the projected capacity of the BAU scenario and the additional power capacity for the adoption of 

electric vehicle (TCk + ytk) described in Eq(11). The price of electricity per technology Pik is inclusive of the 

various charges such as generation, transmission, distribution, metering, and system charges as well as 

subsidies (life line, and cross), power rate reduction, and franchise tax. A piecewise linear membership function 

is used to minimize the total electricity cost ECk with a lower (EClk) and upper (ECuk) electricity cost target limits 

shown in Eq(12). The developed model seeks to satisfy the required additional power demand (y) from 2019 to 

2030 with the adoption of EV while minimizing the carbon footprint (zt), the total capital costs (CCt), and the 

electricity cost (EC). The model was solved using Lingo 18.0 linked to MS Excel with the object linking and 

embedding function on a desktop with Intel Core i7 with 16 GB random access memory (RAM). 

3. The Philippines: a case study 

The Philippine case study considers an extended technology matrix Aij shown in Table 1 where various 

technologies are considered to produce power such as biomass, coal, diesel, gas, hydro, solar, and wind. Table 

1 consists of the material flow required to produce the electricity given the chosen technologies. An identity 

matrix is considered as an extension of Table 1 to represent the electricity stream produced from different 

technologies such as biomass, coal, diesel, gas, hydro, solar, and wind. The heating values of biomass and 

coal are 19.8 MJ/kg and 32.2 MJ/kg, respectively. The typical energy density of diesel and natural gas is 38,600 

MJ/m3 and 36.4 MJ/m3, respectively. The energy density of the hydropower is expressed in terms of volume of 

water required at 14.71 MJ/m3. The energy density for solar and wind are expressed in terms of land requirement 

with 44.93 MW/km2 and 83.31 MW/km2, respectively.  The amount of water required for the hydropower plant 

is The projected target for the electricity generation of the Philippines for each power generating technology 

from 2019 to 2030 is adapted from DOE (2019). The study includes a detailed projection of the installation and 

decommissioning of power plants across the 2019-2030 timeline adapted from Kuryente (2019). The additional 

electricity requirement for EV is assumed to be one-third of the forecasted electricity power demand from DOE 

(2017). The maximum capacity allocation per technology across the 2019 to 2030 timeline adapted from DOE 

1149



(2019). The projected price of electricity per technology together with the price of the material stream to produce 

electricity from 2019 to 2030 is shown in Figure 1. The capital cost for the considered technologies per MW of 

electricity generated and the CO2 emission of electricity generation from different technologies is shown in Table 

2 (adapted from Turconi et al., 2013). The lower limit for the capital costs (CCtl) per year is USD 0 while the 

upper limit for the capital costs (CCtu) per year is USD 2,885 (x 106), which are both exogenously defined. The 

total allowable CO2 emissions range from ztl = 0 to ztu = 6.2 MtCO2 per year based on the historical CO2 

emissions of the Philippines (adapted from IEA, 2017). 

A business as usual (BAU) scenario has been used to compare the electricity cost resulting from this study. The 

BAU scenario excludes the additional power generation requirement form the adoption of electric vehicle. While 

the electricity cost for this study is quantified by Eqs.(11)-(12).   

Table 1: The technology matrix A. 

Extended A Matrix Biomass Coal Diesel Gas Hydro Solar Wind 

Biomass (t/d) -18.98 0 0 0 0 0 0 
Coal (t/d) 0 -7.24 0 0 0 0 0 
Diesel (t/d) 0 0 -4.85 0 0 0 0 
Gas (x103 m3/d) 0 0 0 -6.79 0 0 0 
Water (x103 m3/d) 0 0 0 0 -7.05 0 0 
Solar (km2) 0 0 0 0 0 -0.11 0 
Wind (km2) 0 0 0 0 0 0 -0.03 

Table 2: The capital cost and CO2 emissions of each technology. 

Power Generation 
Technologies 

Capital cost per 
technology, CCa  
(USD/MW x106) 

CO2 emissions for the power 
generation adapted from Turconi 

et al. (2013), F (tCO2/MJ) 

Biomass 2.90 6.58 x 10-5 

Coal 5.81 2.99 x 10-4 

Diesel 0.66 1.81 x 10-4 
Gas 0.89 1.22 x 10-4 
Hydro 2.14 2.78 x 10-6 
Solar 1.26 1.61 x 10-5 
Wind 1.45 1.39 x 10-6 

 

 

Figure 1: The price of electricity (P) per technology (adapted from Lazard 2018). 

4. Results and discussion 

The results yielded an objective function of λ = 0.1238 solving a total variable of 895 with 589 total constraints 

under a total number of 114 iterations.  Since the resulting λ-value is within 0 to 1, a partial satisfaction of the 

multi-objectives has been achieved representing a compromise solution between the carbon footprint, the 

capital cost, and the electricity cost. The additional electricity capacity needed for the rise in the electricity 

demand arising from the adoption of EVs in the Philippines is shown in Figure 2a. For 2019, the installation of 

a hydro and a natural gas power plants mainly provides for the 1,568 MW of electricity requirement until 2022. 

From 2023 to 2028, the majority of the additional power demand from the EV adoption is generated from the 

coal-fired power plant with supporting power plants such as diesel-fired power plant in 2024 and from 2027 to 

 4.0

 4.5

 5.0

 5.5

 6.0

 6.5

 7.0

 7.5

 -

 0.5

 1.0

 1.5

 2.0

 2.5

 3.0

2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

P
rice

 o
f e

le
ctricity

 fro
m

 D
ie

se
l

(U
S

D
/M

W
)

P
ri

c
e
 o

f 
e
le

c
tr

ic
it
y
 p

e
r 

te
c
h
n
o
lo

g
y
 

(U
S

D
/M

W
)

Biomass Coal Gas Water Solar Wind Diesel

1150



2028, and from biomass and hydro in 2024 and 2026 to 2027. For 2029, the hydropower plant delivers 1,147 

MW of electricity supported by the gas-fired plant at 82 MW. The additional requirements in 2030 is mainly 

satisfied by mostly renewable energy technologies such as natural gas at 1,033 MW, hydro at 656 MW, solar at 

69 MW, and wind at 33 MW with the support from the diesel-fired power plant at 102 MW.   

 

 

Figure 2: The a) additional electricity capacity needed for the EV adoption, and b) the comparison of maximum 

allowable capacity and the additional capacity. 

 

Figure 3: The resulting a) carbon footprint, and b) the electricity cost comparison from 2019 to 2030. 

The additional capacity per technology (shown in Figure 2a) versus the maximum allowable capacity based on 

available resources in the Philippines is shown in Figure 2b. All of the renewable energy technologies have 

been fully maximized except for the hydro with an ending capacity utilization of 75% by 2030. As shown in Table 

2, the capital cost for the coal-fired power plant is relatively higher compared to the gas-fired power plant by a 

factor of ~2.5. Moreover, the carbon emission for a coal-fired power plant is relatively higher compared to that 

of the gas-fired power plant by a factor of ~6.5. However, the maximum allowable capacity of the gas-fired plant 

is significantly lower by almost a factor of 4 compared to the coal-fired power plant as shown in Figure 2b. In 

addition, the trend for the electricity price from coal is an uptrend from 2019 to 2030 while the electricity price 

for gas is a downtrend. With the simultaneous solution of the multi-objective, the results suggest installing the 

coal-fired power plants from 2024 to 2028 together with other renewable energy technologies such as hydro 

and biomass as well as the diesel power plant. Moreover, the results suggest maximizing the capacity of the 

natural gas by installing the remaining 1,033 MW by 2030. The installation of fossil-fuel based power plants 

mainly the coal-fired has driven the increase of the carbon footprint from 2023 to 2028 as shown in Figure 3a. 

The carbon footprint accounted in Figure 3a only accounts for the CO2 emissions generated from the additional 

capacity shown in Figure 2a. The total capital cost of the additional electricity capacity is shown in Figure 3a. 

The electricity cost comparison between the BAU scenario and the results of this study together with the percent 

difference with respect to the BAU scenario are shown in Figure 3b. The electricity cost shown in Figure 3b is a 

composite electricity cost among all the technologies used to generate electricity for each year. With the variation 

of the electricity price P for each of the technologies shown in Figure 1, the resulting electricity costs shown in 

Figure 3b has an increasing trend from 2023 to 2028 attributed to the use of fossil-based technologies such as 

coal and diesel. Further, a down-trend of the electricity cost is observed from 2029 to 2030 due to the use of 

1,586 

45 

653 

235 

652 652 652 

1,229 

1,893 

0

200

400

600

800

1,000

1,200

1,400

1,600

1,800

2,000

0

200

400

600

800

1,000

1,200

1,400

1,600

1,800

2,000

2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

E
le

c
tric

ity
 D

e
m

a
n

d
 a

ris
in

g
 fro

m
 

E
V

 A
d
o
p

tio
n
 (M

W
)

A
d

d
it

io
n

a
l 

E
le

ct
ri

ci
ty

 C
a

p
a

ci
ty

  
(M

W
)

Biomass Coal Diesel Gas Water Solar Wind Electricity Demand

235

1716

641

1911

2992

69 33
235

7883

641

1911

3972

69 33
0

1000

2000

3000

4000

5000

6000

7000

8000

9000

Biomass Coal Diesel Gas Water Solar Wind

E
le

c
tr

ic
it
y
 C

a
p
a
c
it
y
  

(M
W

)

Additional Capacity Maximum Allowable Capacity

69

33

69

33

0

25

50

75

100

Solar Wind

a) b)

0

400

800

1200

1600

2000

2400

2800

0.00

1.00

2.00

3.00

4.00

5.00

6.00

2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

T
o

ta
l C

a
p

ita
l C

o
s
t (U

S
D

 x
1

0
6)

A
d
d
it
io

n
a
l 
C

a
rb

o
n
 F

o
o
tp

ri
n
t 

(M
tC

O
2
/y

)

Biomass Coal Diesel Gas Water Solar Wind Total Capital Cost

0.59

5.80

10.85

16.22
17.08 16.94

19.29 19.85
19.61

17.78
16.79

14.15

0

4

8

12

16

20

24

28

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

1.80

2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

%
 D

iffe
re

n
c
e
 w

rt B
A

U
 S

c
e
n
a
rio

E
le

c
tr

ic
it
y
 C

o
s
t 

(U
S

D
/M

J
-y

 x
1
0

6
)

BAU scenario This Study %Difference

a) b)

1151



renewable energy technologies where its production price is relatively low compared with coal and diesel on 

these years.  

5. Conclusions 

A fuzzy mixed-integer non-linear programming has been systematically developed for the optimal planning of 

the additional power requirement emanating for the adoption of electric vehicles in the Philippines. The model 

consists of multi-objectives such as satisfying the electricity requirement with the additional power demand for 

the electric vehicle from 2019 to 2030 while minimizing the carbon footprint, the total capital cost of the 

installation of the power plants, and the electricity price. The study considered the actual maximum capacity 

installed for a certain power generating technology based on the available natural resources in the Philippines. 

The results indicate the optimal energy mix for the additional electricity requirement for the adoption of electric 

vehicles in the Philippines. Partial satisfaction of the multi-objectives has been achieved representing a 

compromise solution among the capital costs, the carbon footprint, the electricity price, and the generation of 

electricity. Future studies include the analysis of various electric vehicle scenarios in the Philippines which 

considers the preferred transportation mode of the various classes of society.  

Acknowledgment 

The financial support of Mitsubishi Philippines Inc. to conduct this study is deeply appreciated by the authors. 

References 

DOE, 2017, PEP 2017-2040: Sectoral Plans and Roadmaps, The Department of Energy of the Philippines 

website, <doe.gov.ph> accessed 01.14.2019. 

DOE, 2019, Private Sector Initiated Power Projects, The Department of Energy of the Philippines website, 

<doe.gov.ph> accessed 01.14.2019. 

Du, Z, Lin, B., Guan, C, 2019, Development path of electric vehicles in China under environmental and energy 

security constraints, Resources, Conservation & Recycling, 143, 17–26. 

Haikarainen, C, Pettersson, F, Saxén, H, 2019, Optimising the regional mix of intermittent and flexible energy 

technologies, Journal of Cleaner Production, 219, 508–517. 

Iacobucci, R., McLellan, B., Tezuka, T, 2019, Optimization of shared autonomous electric vehicles operations 

with charge scheduling and vehicle-to-grid, Transportation Research Part C, 100, 34–52. 

Jochem, P, Babrowski, S, Fichtner, W, 2015, Assessing CO2 emissions of electric vehicles in Germany in 2030, 

Transp. Res. Part A: Policy Pract., 78, 68–83. 

Kuryente, 2019, Power Plants Installation and Decommissioning, <kuryente.org.ph> accessed 01.14.2019. 

Lazard, 2018, Lazard's Levelized Cost of Energy Analysis - Version 12.0, pp. 0-19, < 

https://www.lazard.com/media/450784/lazards-levelized-cost-of-energy-version-120-vfinal.pdf> accessed 

01.14.2019. 

Lemme, RFF, Arruda, EF, Bahiense, L, 2019, Optimization model to assess electric vehicles as an alternative 

for fleet composition in station-based car sharing systems, Transportation Research Part D, 67, 173-196. 

Luin, B, Petelin, S, Al-Mansour, F, 2019, Microsimulation of electric vehicle energy consumption. Energy, 174, 

24-32. 

Prina, MG, Lionetti, M, Manzolini, G, Sparber, W, Moser, D, 2019. Transition pathways optimization 

methodology through EnergyPLAN software for long-term energy planning. Applied Energy, 235, 356–368. 

Turconi, R, Boldrin, A, Astrup, TF, 2013, Life cycle assessment (LCA) of electricity generation technologies: 

Overview, comparability and limitations, Renewable and Sustainable Energy Reviews, 28, 555-565. 

Ubando, AT, Culaba, AB, Aviso, KB, Ng, DKS, Tan, RR, 2014, Fuzzy mixed-integer linear programming model 

for optimizing a multi-functional bioenergy system with biochar production for negative carbon emissions, 

Clean Technologies and Environmental Policy, 16, 8, 1537-1549. 

Ubando, AT, Culaba, AB, Aviso, KB, Tan, RR, Cuello, JL, Ng, DKS, El-Halwagi, MM, 2016, Fuzzy mixed integer 

non-linear programming model for the design of an algae-based eco-industrial park with prospective 

selection of support tenants under product price variability. Journal of Cleaner Production, 136, 183-196. 

Ubando, AT, Marfori, IAV, Aviso, KB, Tan, RR, 2019, Optimal Operational Adjustment of a Community-Based 

Off-Grid Polygeneration Plant using a Fuzzy Mixed Integer Linear Programming Model, Energies, 12, 636. 

Vienneau, D, Perez, L, Schindler, C, Lieb, C, Sommer, H, Probst-Hensch, N, Künzli, N, Röösli, M, 2015, Years 

of life lost and morbidity cases attributable to transportation noise and air pollution: a comparative health risk 

assessment for Switzerland in 2010, Int. J. Hyg. Environ. Health, 218, 514–521. 

Zimmermann, HJ, 1978, Fuzzy programming and linear programming with several objective functions, Fuzzy 

Sets Syst., 1, 45–55. 

1152