id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
cet-14346		cet-14346		6	.pdf	application/pdf	4119	189	49	For this, the emission calculated in tons has to be multiplied by 0.338 gha/t (Lin et al., 2018), giving a value of 0.114 gha/m3 for concrete mixed with CEM T cement and 0.100 gha/m3 for concrete mixed with CEM II cement. Converting the emissions obtained, it can be found that 1,140 gm2 of hypothetical land area is needed to produce one m3 of concrete for a formulation of concrete mixed with CEM I cement type 1,140 gm2, and 1,000 gm2 for a formulation mixed with CEM II cement type.	cache/cet-14346.pdf	txt/cet-14346.txt
