id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
cet-15753		cet-15753		6	.pdf	application/pdf	3209	151	42	For example, as a result of sawing performed in time slot 2, a cut-to-size laminated chipboard becomes available in the second time slot, which can then serve as input for edge banding starting in time slots 2 or 3. Conclusions This study demonstrated the applicability of two P-graph-based optimization methods for reducing per-unit energy demand in furniture manufacturing by increasing the utilization of production time.	cache/cet-15753.pdf	txt/cet-15753.txt
