id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
crl-11759	Metcalf, Keyes D.	Library Building Costs	1965	5	.pdf	application/pdf	2466	189	73	The complications in connection with building costs are more numerous and are equally difficult. A provision in the original budg- et for escalation of costs due to a possible increase in wage rates or to other costs stemming from inflation in case construction was delayed beyond the time it had been hoped the con- tract could be let?	cache/crl-11759.pdf	txt/crl-11759.txt
