id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
crl-13390	Leighton, Philip D.	The Stanford Flood	1979	11	.pdf	application/pdf	5569	321	69	Equipment needs in- cluded a fleet of book trucks, tape machines, a roll paper cutter, worktables, pallets, pallet movers, forklifts, and freezer trucks. Separate crews were established for folding and taping boxes, cutting freezer paper into sheets (typically about twelve to eighteen inches long), moving supplies to the packing crews, packing, loading packed boxes onto book trucks and moving them to the two passenger elevators, moving the loaded trucks from the elevator on the ground floor and placing the packed boxes on pallets, returning empty book trucks to the loading crews in the basement, and moving the palletized boxes (with the boxes stacked three to four feet high) into freezer trucks.	cache/crl-13390.pdf	txt/crl-13390.txt
