id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
ajceb-2271	Idoro, Godwin Iroroakpo	Influence in-sourcing and outsourcing of consultants on construction project performance in Nigeria	2011	14	.pdf	application/pdf	8083	239	34	The results of the hypothesis are expected to assist clients to know the effect of engaging the two types of consultants and which consultants to source in-house or outside Conceptual Framework of the Study Three categories of variables namely: project consultant, consultant source and project performance were used in the study. For the test of the hypothesis, data collected on the use of the two variables of project consultants and the respondents’ assessment of the twelve variables of project performance as stated in the research methods were used.	cache/ajceb-2271.pdf	txt/ajceb-2271.txt
