id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
ajceb-2330	Ramanathan, Chidambaram; Narayanan, S P; Idrus, Arazi B	Construction delays causing risks on time and cost - a critical review	2012	21	.pdf	application/pdf	8635	286	42	Table 7 Comparison of previous studies on delay and cost overrun in construction projects in different Countries (a): Delay and cost overruns; (b): Delays only; (c): Cost overruns only Australasian Journal of Construction Economics and Building Ramanathan, C et al. (2012) ‘Construction delays causing risks on time and cost – a critical review’, Australasian Journal of Construction Economics and Building, 12 (1) 37-57 55 This study has identified 113 distinct factors classified into 18 groups responsible for delays through critical review of 41 previous research studies performed in the relevant field. Abstract There is an increase in the number of construction projects experiencing extensive delays leading to exceeding the initial time and cost budget.	cache/ajceb-2330.pdf	txt/ajceb-2330.txt