id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
ajceb-3120	Arashpour, Mehrdad; Wakefield, Ron; Blismas, Nick; lee, EWM	A new approach for modelling variability in residential construction projects	2013	10	.pdf	application/pdf	5015	187	35	‘Little's Law as Viewed on Its 50th Anniversary’, Operations Research, 59 (3), 536-549 Martinez, J. C. (2010) ‘Methodology for Conducting Discrete-Event Simulation Studies in Construction Engineering and Management’, Journal of Construction Engineering and Management-Asce, 136 (1), 3-16 Moyal, P. (2010) ‘The queue with impatience: construction of the stationary workload under FIFO’, Journal of Applied Probability, 47 (2), 498-512 Peña-Mora, F. and G. H. Dwivedi (2002) ‘Multiple device collaborative and real time analysis system for project management in civil engineering’, Journal of Computing in Civil Engineering, 16 (1), 23-38 Sawhney, A., K. D. Walsh, H. H. Bashford and S. Palaniappan (2009) ‘Impact of inspected buffers on production parameters of construction processes’, Journal of Construction Engineering and Management, 135 (4), 319-329 Veryzer, R. W. (2005) ‘The Roles of Marketing and Industrial Design in Discontinuous New Product Development’, Journal of Product Innovation Management, 22 (1), 22-41 Walker, D. H. T. and Y. J. Shen (2002) ‘Project understanding, planning, flexibility of management action and construction time performance: two Australian case studies’, Construction Management & Economics, 20 (1) 31-44 Walsh, K. D., H. H. Bashford, A. Sawhney and A. Witjakso (2004) ‘Cost of risk transfer: Pricing agreements in residential supply chains’, Journal of Architectural Engineering, 10 (3), 112-118 Walsh, K. D., A. Sawhney and H. H. Bashford (2007) That is, the mean and standard deviation of construction process times can be represented by exponential distribution (VI =1).	cache/ajceb-3120.pdf	txt/ajceb-3120.txt
