id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
ajceb-7638	Mossman, Alan; Sarhan, Saad	Synchronising Off-Site Fabrication with On-Site Production in Construction	2021	20	.pdf	application/pdf	10619	555	52	Wan Amstel and Postulart (2017) reported that more than 15% of construction costs are transport related and “30% of the commercial traffic in Dutch cities is for construction sites - more than 200,000 delivery vans and 20,000 trucks on a daily basis”. As in the London research a decade earlier (e.g., Department for Trade and Industry, 2004; Peter Brett Associates, 2007), the results are significant: • nearly 70% fewer transport movements to construction sites (reducing vehicle movements improves road safety as well as reducing pollution (Davies and White 2015), • nearly 70% fewer CO2, NOX and particulate emissions, and • up to 40% higher productivity at the site • fewer complaints from people in the surrounding area (van Amstel and Postulart, 2017) • at least 7% less material losses and damage (Transport for London 2016, p.12) • 3- 5% lower construction costs.	cache/ajceb-7638.pdf	txt/ajceb-7638.txt
