Construction
Economics and
Building
Vol. 21, No. 4
December 2021
© 2021 by the author(s). This
is an Open Access article
distributed under the terms
of the Creative Commons
Attribution 4.0 International
(CC BY 4.0) License (https://
creativecommons.org/licenses/
by/4.0/), allowing third parties
to copy and redistribute the
material in any medium
or format and to remix,
transform, and build upon the
material for any purpose, even
commercially, provided the
original work is properly cited
and states its license.
Citation: AlMunifi, A. A.,
and Almutairi, S. 2021.
Lessons Learned Framework
for Efficient Delivery of
Construction Projects in
Saudi Arabia. Construction
Economics and Building,
21:4, 115–141. http://dx.doi.
org/10.5130/AJCEB.v21i4.7858
ISSN 2204-9029 | Published by
UTS ePRESS | https://epress.
lib.uts.edu.au/journals/index.
php/AJCEB
RESEARCH ARTICLE
Lessons Learned Framework for Efficient
Delivery of Construction Projects in
Saudi Arabia
Abdullatif A. AlMunifi1,2,* and Saud Almutairi1
1 Dept. of Civil Engineering, College of Engineering-Unaizah, Qassim University, KSA
2 Dept. of Civil Engineering, Faculty of Engineering, Sana’a University, Yemen
Corresponding author: Abdullatif A. AlMunifi, Dept. of Civil Engineering,
College of Engineering-Unaizah, Qassim University, KSA, a.almunifi@qu.edu.sa
DOI: http://dx.doi.org/10.5130/AJCEB.v21i4.7858
Article History: Received: 13/08/2021; Revised: 29/10/2021 & 03/12/2021; Accepted: 04/12/2021;
Published: 20/12/2021
Abstract
The Kingdom of Saudi Arabia (KSA) has the largest construction market in the gulf region.
Nevertheless, the sector faces issues related to inefficiency and ineffectiveness in project
delivery. This research aims to explore the impact of current practices across projects
lifecycles, and to utilize findings to develop an integrated strategic construction project
management framework (ISCPMF) that may pave the way to efficient and effective project
implementation. To achieve this objective, the authors have traced the implementation
processes of nine projects for data collection. This was based on a deductive approach
with preconceived themes. Within-case and cross-case analysis was conducted. The
data was complemented by holding three separate focus-group discussions with a total
of nineteen participants, and the initial findings were cross-checked with six experts.
The deficiencies that surround the pre-construction phase and disconnected activities
that are carried out in different timespans represent the first barrier to implement
projects successfully. This is coupled with low capacities contractors and non-proactive
construction teams that lack a management toolbox to alleviate accumulated issues and
control project progress. The unavailability of infrastructure and utilities did not ease
construction nor made inspection possible, which led to late occupancy of facilities, waste
of resources and failure to deliver the desired benefits effectively. The adoption of ISCPMF
will institutionalize and bridge project phases. This may play a vital role in implementing
projects efficiently and effectively and building data to benefit future projects. Though the
DECLARATION OF CONFLICTING INTEREST The author(s) declared no potential conflicts of interest with
respect to the research, authorship, and/or publication of this article. FUNDING The author(s) received no
financial support for the research, authorship, and/or publication of this article.
115
https://creativecommons.org/licenses/by/4.0/
https://creativecommons.org/licenses/by/4.0/
https://creativecommons.org/licenses/by/4.0/
http://dx.doi.org/10.5130/AJCEB.v21i4.7858
http://dx.doi.org/10.5130/AJCEB.v21i4.7858
https://epress.lib.uts.edu.au/journals/index.php/AJCEB
https://epress.lib.uts.edu.au/journals/index.php/AJCEB
https://epress.lib.uts.edu.au/journals/index.php/AJCEB
mailto:a.almunifi@qu.edu.sa
http://dx.doi.org/10.5130/AJCEB.v21i4.7858
research is limited to higher education facilities, the findings may be generalized to public construction
projects.
Keywords
Saudi Construction Sector; Inefficient and Ineffective Processes; Strategic Management Framework
Introduction
The KSA has the largest construction market in the region with more than 33% of the total market share.
According to Fay, et al. (2019), Saudi Arabia is one of the ten countries in which 73% of the world’s
construction and infrastructure investment exists. In line with the Kingdom’s Vision 2030, there is an
ongoing trend towards modernization of construction through renovation and new construction to meet the
development needs and population growth.
While reports show that the KSA remains the most active construction market in the region, a
significant number of projects are running years behind their original schedules and billions of dollars over
budget. Many projects were either suspended or halted by ministries. As this research will focus mainly on
the status of education projects, recent reports from the Ministry of Education (MOE) on pre-university
education projects show that in mid-2020, the MOE withdrew 355 projects (delayed or stalled). Similarly,
in 2019, the MOE withdrew 305 projects, cancelled 266 contracts, and in 2021 dealt with 452 stalled
projects (MOE, 2021). A strong case to show the inefficiency and ineffectiveness in project implementation
is the SAR 2.0 billion contract. Signed in July 2009 with a foreign construction company, the contact was
to construct 200 schools within 14 months, to accommodate 150 thousand students (Tatweer Building
Company, 2020). After ten years had elapsed, i.e., in 2019, the MOE decided to cancel the contract and
to withdraw the uncompleted projects. The situation in post-secondary education projects is much more
complicated due to the size and systems involved in constructing universities and technical institutes.
For years, the KSA government authorities have been complaining about delayed, incomplete, and halted
projects. Nonetheless these projects exist and operate in environments that may have been influenced by
them. The organizational culture, structure, governance, employee capability, along with the organizational
process assets, influence the management of the projects (PMI, 2017). Successful projects begin with the
owner as highlighted by ASCE (2013). The Saudi construction sector faces chronic challenges, some of
which are the regulatory framework, delays in payments, low capacities of contractors, unskilled labor
force, traditional construction methods, reliance on old equipment, and limited access to new construction
technology (US-SABC, 2018).
The proliferation of construction projects post-2000 according to Mitra and Wee Kwan Tan (2012)
has seen an explosion in non-standard, ad hoc methods and tools being used in construction. They found
that there is an acute shortage of experienced and quality project manpower and contractors in the KSA
construction industry. The outbreak of the coronavirus in 2020 has shown how fragile the construction
contractor companies are. A recent survey of 600 Saudi contractors by the Saudi Contractors Authority
(2020) revealed that the largest percentage of companies declaring bankruptcy are construction companies.
It is predicted that after the pandemic, contractors will face unstable demand with a different mix of
buildings and new building techniques that require technology adoption. Digital transformation is a reality,
even while many of the contractors still use traditional paper-based processes.
The fact of the matter is that the constrained capacity the sector suffered from has resulted in difficulties
in implementing projects efficiently and effectively. While a number of researchers have identified and
have listed major sources of project overruns and defined the burden of each key player (Alzara, et al.,
2018, Mahmid, 2013, Gopang, et al., 2020, Simushi, 2017) the root causes of the problem have not been
diagnosed. These causes are the organizational setup, the old-fashioned regulations, and pre-construction
AlMunifi and Almutairi
Construction Economics and Building, Vol. 21, No. 4 December 2021116
procedures that yield issues for project implementation throughout the project’s lifecycle. These problems,
along with the absence of a strategic project management framework, create barriers to alleviating issues in a
timely manner.
EFFICIENCY AND EFFECTIVENESS IN CONSTRUCTION PROJECTS
Both efficiency and effectiveness are an integral part of successful management. Project management
literature agreed on the definition of efficiency and effectiveness. Zwikael, et al. (2014), Yamin and Sim,
(2016) and Zidane and Olsson (2017) define construction project efficiency as the extent to which the
project is meeting both time and budget expectations. In comparison, effectiveness is the degree to which
project specifications and beneficiary requirements are satisfied. The well-known and most cited criteria in
literature to judge a project success (on time, to budget, to specification) were the highest ranked success
criteria identified through the survey carried out by White and Fortune (2002). However, the fit between
the project and organization as well the influence of the project on the business performance were also
reported as important criteria, i.e., the need to meet organizational objectives and to minimize business
disruption. Many organizations enter into projects without fully understanding how they should be
managed, and the techniques required to ensure a project delivers according to expectations, (Pinto, 2010).
Love, et al. (2009) suggested that there could be some inefficiency in project organization that promotes the
occurrence of overruns rather than inhibits them, such as the actions of the project team members in the
project organization (Love, Ahiaga-Dagbui and Irani, 2016).
Reviewing previous studies on delays in completing projects in the KSA and their ensuing consequences,
Almutairi and AlMunifi (2020) concluded that most of these studies somehow linked delays to
management inefficiency which results in an unsatisfactory final product that fails to deliver its intended
purpose. This is confirmed by Turner and Zolin (2012) who stated that projects have been completed on
time and at cost (efficient) but have left their investors dissatisfied because they have failed to deliver the
desired benefits (ineffective).
The Saudi construction sector faces issues related to inefficient and ineffective implementation of
projects that undoubtedly results in waste of resources and damage to the image of the country’s investment
environment. As will be discussed hereafter, while sources of project overruns and key players have been
identified by researchers, the root causes of the problem have not been diagnosed. The big picture has
not yet been introduced to researchers and practitioners. This research is an attempt to formulate a good
understanding of the culture dominating the construction sector in the KSA. This will be elaborated
on through exploring current practices across projects lifecycle, from initiation to facility operation and
evaluation. Real data from case studies that are in different states of implementation (bidding, ongoing,
completed and in operation, completed but not operational) will be utilized. Projects may have been
completed on time and within budget (efficient) but failed to deliver the desired benefits (ineffective). This is
another dimension of this study that has not been tackled by previous researchers. The findings are utilized
to develop an integrated strategic construction project management framework (ISCPMF) that may pave
the way to efficient and effective project implementation. The findings and recommendations might fill the
research gap and be of added value.
RESEARCH QUESTIONS
To address and tackle the chronic issues that adversely impact the performance of construction projects
in the KSA, we pose the following questions. Why and how do construction projects perform poorly
throughout project phases from initiation to handover and operation? How does poor performance lead to
inefficient and ineffective project implementation? How would the existence of an ISCPMF ensure that a
project meets its time schedule, is completed within the allocated funds, and according to specifications and
AlMunifi and Almutairi
Construction Economics and Building, Vol. 21, No. 4 December 2021117
professional standards, and most crucially, how the framework would ensure that the project output achieves
the functionality objectives over different timescales, as appreciated by stakeholders, especially end users.
RESEARCH OBJECTIVE
The large investment in the KSA construction sector has not been accompanied by reforming project
governance to create an enabling environment including regulations as well as capacity building. Based on
the previously stated questions, the current research aims to study issues in-depth to determine the sources
of poor performance, and then use the findings to propose an ISCPMF that may lead to efficient and
effective implementation of construction projects.
The sections of the research are structured as follows. A brief introduction on the current state of the
Saudi construction industry, and the definition of efficiency and effectiveness in construction project
management literature. The literature review covers the main principals and definitions of projects
governance and its pertinence in the KSA, as the organizational culture has a major impact on the
construction industry’s efficiency. The relationship between project management methodologies and project
success is addressed, as well. The main elements of the research methodology are outlined. An in-depth look
at raw data from nine case studies, and systematic analysis through the different project phases is carried out.
This is followed by an explanation of the acquired research results that is cross-referenced with focus-group
discussions and structured interviews. The findings from the mixed method approach are triangulated to
enhance and discuss results, and to build conclusions and recommendations.
In light of new driving forces and rapid changes in the country, particularly in the management of the
construction industry, this study will be of high value and importance to decision makers in the country, as
well as to practitioners and academics.
Literature Review
PROJECTS GOVERNANCE
The KSA government has introduced several initiatives to improve project governance. Recently, the
government passed a law to set up a network of program management offices (PMOs) with the aim to
oversee public sector projects. It is an attempt to find an efficient and standardized approach to project
management. However, from the authors’ observations and communication with earlier established PMOs,
there are limited opportunities of success unless there is a parallel reform to the organizational culture.
Organizational culture is acknowledged to have a major impact on the construction industry’s efficiency.
Teräväinen, Junnonen and Ali-Löytty (2018) investigated the presumptive correlation between construction
project culture and efficiency in the Finnish construction industry. They found that projects with the highest
performance and customer satisfaction levels seemed to identify their project culture as stronger than
low level performing projects. Based on a face-to-face questionnaire survey on project governance among
Chinese project management professionals, Li, Akintoye and Holt (2017) concluded that without effective
organizational governance and management systems support, project governance and management cannot
operate effectively. Systemic project failure is a failure of organizational governance (Too and Weaver, 2014).
Ward (2018) emphasized that project management is a multidisciplinary process that creates complex
relationships and a matrix organizational structure to achieve a satisfactory end result. Projects lacking
effective senior management support cannot deliver the expected business benefits to an organization. The
support from senior management, according to White and Fortune (2002), is one of the most frequently
mentioned critical factors for successful project management.
AlMunifi and Almutairi
Construction Economics and Building, Vol. 21, No. 4 December 2021118
CONTRIBUTORS TO POOR PROJECT DELIVERY
The PMI (2017) informs that poorly managed projects may result in missed deadlines, cost overruns, poor
quality, and rework. In spite of continuous growth of literature in the knowledge management processes,
tools and techniques, researchers and professionals indicate that projects completion in a timely manner
within the allocated budget and according to the contracted terms and specifications have not significantly
improved.
The vast majority of research on time and cost overruns in the KSA construction sector have adopted
a systematic approach of categorizing and dispersing responsibilities of the overrun occurrences among
the main players. Reviewing existing literature in Africa, Asia and the Middle East, Simushi (2017) found
that time and cost overruns in the Middle East were viewed to be mostly caused by the client through
design changes, late payments to the contractor, and delays in decision making. The top five main delay
factors as identified by Gopang, Imran and Nagapan (2020) in their attempt to assess delay factors in
Saudi Arabia Metro construction projects, are “client's decision-making process, design errors, labour skills
level, design changes by Client or Consultant and issues related to permissions/ approvals from other
stakeholders”. Mahamid (2013), in his aim to investigate the contributors to delays from owners’ viewpoint,
identified other top contributors to schedule delays, namely: poor site management, poor communication
and coordination between construction parties, payments delay, poor labour productivity and rework.
Contracting with the lowest bidder was also found to be one of the top contributors to schedule delays in
public construction projects in Saudi Arabia. Alzara, et al. (2018) analysed cost overruns in the construction
of a higher education institute in Saudi Arabia and found that bids submitted by construction companies
who eventually succeeded in getting the contract, were much lower than the market project costs. This was
remediated through variation and change orders that led to cost overruns.
Despite the fact that several studies have examined the factors influencing delays in public construction
projects in Saudi Arabia, Alotaibi, Sutrisna and Chong (2016) found in their review paper that little
attention has been paid to how project management tools and methods have made an impact to the
incidence of project delays. Although authors identified major sources of project delays and assigned delay
factors to key players, nonetheless, they have not approached the role of professional management teams
in alleviating them as stated by Almutairi and AlMunifi (2020). Professional management-related factors
such as poor planning and scheduling, poor site management and poor resource management were found
by Mahamid (2016) to be a severe source that contributes to poor performance of construction projects in
Saudi Arabia. This is supported by Assaf, Hassanain and Mughal (2014) who have undertaken an empirical
assessment of the linkages between team effectiveness and project success in the Saudi construction industry,
where results showed a positive and high correlation between team effectiveness and project success.
Beyond the overruns issue, there were a number of projects completed nearly on time and within the
budget, but the organizational development objectives had not been achieved. Clients were also not satisfied,
especially in higher education facilities, where operational requirements are high. It is a research gap that
begs the question; is meeting time, budget and scope an ideal measure of project success? Williams (2016)
illustrated the increasingly recognized nature of project success as being multi-dimensional, with different
criteria, only some clearly measurable. Though the three criteria used for judging project success were also
the highest ranked success criteria identified through the survey carried out by White and Fortune (2002),
the fit between the project and the organization and the consequences of the project for the performance of
the business were also reported as important criteria, i.e., the need to meet organizational objectives and to
minimize business disruption. Drawing from empirical data on project management professionals working
in UAE project-based organizations, Mir and Pinnington (2013) demonstrated that project management
performance is correlated to project success within organizations, and by paying greater attention to this
AlMunifi and Almutairi
Construction Economics and Building, Vol. 21, No. 4 December 2021119
relationship, organizations can increase their rate of project success. Pirotti, et al. (2020) found a significant
positive relationship between top management, project mission, personnel, communication, and project
success.
Thinking about how well the final product (the facility) will be operated is not a concern in some
organizations, where senior management considers the issues of delay in completing projects and the
incurred cost overruns as the most recurring problems, until the end-user, starts suffering from the low
standards of project execution. This is another dimension of the current study that has not been discussed
in-depth in previous researches. Turner and Zolin (2012) state that project efficiency is an important
contributor to stakeholder satisfaction and overall project success and concluded that the iron triangle is an
indicator of project performance but not the best measure of project success. Serrador and Turner (2015)
investigated to what extent project efficiency is correlated with stakeholder satisfaction and overall project
success. They found that project efficiency is 60% correlated with stakeholder satisfaction and 56% with
overall project success. To contribute to improving clients’ satisfaction in construction projects in Saudi
Arabia, Alshihre, et al. (2020) identified prominent factors that impact clients’ satisfaction: effective financial
management, use of skilled workers, use of advanced technology, customer relation, and time management.
Effective team leadership, project monitoring, communication and adequate knowledge and skills
contribute to clients’ satisfaction. Bubshait, Siddiqui and Al-Buali (2014) revealed that communication and
coordination are key factors in successful project management. Based on their findings on project critical
success factors, Mathar, et al. (2020) recommend that stakeholders should have accurate and clear channels
of communication, in order to avoid any possibility of misunderstanding, mistakes, and consequently loss of
time and money.
Building on the previous efforts of researchers in the subject area, we concluded that there is a need to
study in-depth the culture dominating the construction project implementation in the KSA, to be able to
address the chronic issues that adversely impact project performance and lead to inefficient and ineffective
project delivery.
Research Methodology
RESEARCH DESIGN
The type of research questions determined the appropriate research method which is the qualitative
approach. Consequently, the design of the current research benefitted from concepts developed on the
qualitative research, which according to Denzin and Lincoln (2018) involves a set of interpretive material.
First, nine case studies were conducted to collect facts and knowledge about operational processes over time
which led to cost and time overruns, as explained by Yin (2018). Following that, focus group discussions and
interview techniques with projects managers and practitioners were adopted to gain a deeper understanding.
Triangulation adds depth to the data that is collected. Denzin (2012) sees triangulation as a strategy
on the road to a deeper understanding of an issue under study, and it is focused on combining various
qualitative approaches where the issue under study makes it necessary, as emphasized by Flick (2018).
Triangulation, as suggested by Love, Ahiaga-Dagbui and Irani (2002) is an appropriate research approach
if construction management researchers are to effectively solve the problems that the industry faces, and to
adopt a robust research methodology to better understand the phenomena that influence organizational and
project performance in construction. In this context, the researchers present the findings from the mixed
research methods; a comprehensive systematic literature review, sites visit, case study research, focus group
discussions, meetings and interviews, through triangulation approach, as illustrated in Figure 1.
AlMunifi and Almutairi
Construction Economics and Building, Vol. 21, No. 4 December 2021120
Figure 1. The research methodology framework
DATA COLLECTION FROM CASE STUDIES
Selection of case studies
Development and maintenance of infrastructure is one of the strategic objectives of a large public
educational institute. To achieve this objective, a portfolio that includes a number of programs and projects
is underway including construction of college buildings. An exploratory survey on ongoing projects was
carried out to collect basic data and to establish criteria for case studies selection. Therefore, out of twelve
case studies of construction projects, nine were selected based on the current status of the projects (bidding,
ongoing, completed and in operation, completed but not operational), and proximity for regular visits. Each
case study also gives additional information and at the same time different dimensions to the efficiency and
effectiveness issue, the research subject matter.
AlMunifi and Almutairi
Construction Economics and Building, Vol. 21, No. 4 December 2021121
Within-case analysis and findings
An extensive and thorough review of relevant contractual documents and a good number of unpublished
reports and communications was carried out. The case studies that had been monitored by the researchers
for two years are peculiar in terms of size, project implementation phase, and issues. Some were near
completion and investigated during inspection, commissioning, operation, and maintenance. Others
have already been handed over, but not operated. Others completed but need investment and rework to
accommodate new purpose for use. Table 1 presents within-case analysis and findings.
Cross-case analysis and findings
Many similarities were observed throughout the in-depth study and analysis of case studies, as listed in
Table 1. Issues such as change to construction sites, change in scope, design alteration, deficiencies in design
documents, errors in BoQs, inexperienced contactor, lack of infrastructure and utilities to occupy and
operate the building, and change in the purpose that it is built for, are cross-cutting. The researchers found
that there was a need to enhance and complement findings through focus-group discussions and structured
interviews with experts.
A set of research axes were developed. The themes for focus-group discussions were developed based on
best practices and standardized construction management processes, as well as the identified main phases
that public construction projects go through in the KSA. The headlines and contents of axes reflect sub-
project phases, as illustrated in Fig. 2, under which questions on issues that projects faced across their life
cycle were outlined for focus-group discussions. These include the project alignment with the strategic and
implementation plan of the organization; procedures for contracting an engineering design firm; how they
work with clients through stages of preparing tender documents and invitations to bid; the contracting and
preparation for project execution; handing-over, commissioning and building occupancy.
Profiles of participants in focus-group discussions
Three sessions of focus-group discussions took place at projects sites of the most problematic and available
cases. The profiles of participants in focus-group discussions are shown in Table 2. For completed projects
that are currently in operation, deanship, teaching staff, administrators and contractor’s site engineer were
met with as part of the discussions. For ongoing projects where changes occurred, the formal project
manager, current project manager, and current contractor engineers were useful sources of data.
The discussions with those professionals gave the researchers a clear view on issues projects faced across
the life cycle, and to what extent there exists a clear mandate for implementing management processes, and
the causes of the inefficient and ineffective project implementation from the different parties’ viewpoints. As
a matter of fact, it was concluded that the under-consideration construction projects faced problems from
their initiation until present time.
Having in hand the data from case studies and focus group discussions as well as the results of the
analysis, the researchers shared initial findings with experts that were purposely selected and individually
met with. They are the most experienced and were part of the focus group discussions acting as heads of
teams from their organizations, as illustrated in Table 3. The findings were enhanced by their valuable input.
Promoting ethical and participatory research
To best protect the interest of participants and avoid any social and ethical implications that may result
from the participants’ engagement in this research, the researchers made pre-arranged official visits to the
projects directorate and sites to meet participants and hold focus-group meetings. The researchers identified
themselves and the purposes of research. It has been a policy to repeat in all meetings that information
gathered will be used for research purposes only confirming ethical issues, anonymity and confidentiality.
AlMunifi and Almutairi
Construction Economics and Building, Vol. 21, No. 4 December 2021122
Table 1. Within-case analysis and findings
Case study
description
D
at
e
of
c
on
tr
ac
t
si
gn
in
g
C
on
tr
ac
t d
ur
at
io
n
in
d
ay
s
D
at
e
to
b
e
co
m
pl
et
ed
P
ro
gr
es
s
in
%
a
s
of
m
id
-2
01
9
P
ro
gr
es
s
in
%
a
s
of
D
ec
. 2
02
0
Within-case analysis
A three-story
reinforced
concrete
building with
annexes to
accommodate
3850 students
and 180
staff. The
contact value
is SAR130.0
million
May
2012
1260 Dec.
2015
66 57.7* It reflects the
non-involvement
of the beneficiary
in the pre-
construction phase.
The beneficiary
decided to change
construction site, at
the time where site
handing over is to
take place, to another
plot of land outside
the campus master
plan with different
topography that
varies from the one
designs were tailored
for. The beneficiary
also requested some
alteration to the
design documents at
the time the contract
with the engineering
design firm came
to end years before.
The contractor had
to carry out the
required alterations
to the design
documents. The cost
of these changes in
the structural works
amounts to more
than 20% of the total
cost of structural
components. These
enormous changes
and other issues
have also caused
delays. The project
should be completed
AlMunifi and Almutairi
Construction Economics and Building, Vol. 21, No. 4 December 2021123
Case study
description
D
at
e
of
c
on
tr
ac
t
si
gn
in
g
C
on
tr
ac
t d
ur
at
io
n
in
d
ay
s
D
at
e
to
b
e
co
m
pl
et
ed
P
ro
gr
es
s
in
%
a
s
of
m
id
-2
01
9
P
ro
gr
es
s
in
%
a
s
of
D
ec
. 2
02
0
Within-case analysis
and handed over to
the owner by the end
of 2015. Today after
exceeding another
extra time period of
42 months the project
is still not completed
and the percentage
of progress as of
end of 2020 is only
60%. Additionally,
there is a lack of
infrastructure for
building occupancy
after completion.
This is also a case
to show the waste of
investment. Once the
project completed
and closed out, the
plan is to use the
facility not for the
purpose for which it
is built.
A cluster of
three-story
reinforced
concrete
buildings to
accommodate
1200 students.
The contract
value is
SAR15.5 million
Jun.
2014
408 July
2015
75 81 In spite of the project
being just lecture
halls without any
complicated systems,
the very low technical
and financial capacity
of the contractor
coupled with project
poor management
resulted in
tremendous delays.
Again, it will time to
equip the project area
with infrastructure
and utilities for
building occupancy
after completion.
Table 1. continued
AlMunifi and Almutairi
Construction Economics and Building, Vol. 21, No. 4 December 2021124
Case study
description
D
at
e
of
c
on
tr
ac
t
si
gn
in
g
C
on
tr
ac
t d
ur
at
io
n
in
d
ay
s
D
at
e
to
b
e
co
m
pl
et
ed
P
ro
gr
es
s
in
%
a
s
of
m
id
-2
01
9
P
ro
gr
es
s
in
%
a
s
of
D
ec
. 2
02
0
Within-case analysis
A three-story
reinforced
concrete
building to
accommodate
3600 male
students of Arts
& Sciences. The
contract value
is SAR122.2
million.
May
2010
900 Dec.
2012
Prelim.
Hand over
Plan
for final
hand over
This project should
be completed and
handed over to the
owner by the end
of 2014. Since the
preliminary handover
in 2018, the facility
was not occupied
due to the lack of
infrastructure and
utilities. The owner
decided to change
the facility users
which required more
spaces as well as
alterations in many
aspects including the
use of labs rooms
as lecture halls,
building boundary
walls, and adding
an annex building to
serve as labs. The
facility is in use since
beginning of 2020
A three-story
facility to
accommodate
vocational
training
students. The
contract value
is SAR111
million.
Feb.
2010
900 Sep.
2012
Prelim. hand
over
Plan
for final
hand over
The use of the
facility has been
changed completely.
The investment to
establish a vocational
college went astray.
The facility spaces,
labs and workshops
transformed to
lecture halls.
Alterations had been
carried out to serve
higher education
humanities programs
Table 1. continued
AlMunifi and Almutairi
Construction Economics and Building, Vol. 21, No. 4 December 2021125
Case study
description
D
at
e
of
c
on
tr
ac
t
si
gn
in
g
C
on
tr
ac
t d
ur
at
io
n
in
d
ay
s
D
at
e
to
b
e
co
m
pl
et
ed
P
ro
gr
es
s
in
%
a
s
of
m
id
-2
01
9
P
ro
gr
es
s
in
%
a
s
of
D
ec
. 2
02
0
Within-case analysis
A cluster of
two-story
reinforced
concrete
buildings to
accommodate
1200 students.
The contract
value is SR14.2
million
Apr.
2014
289 Feb.
2015
62 71 In spite of the project
being just lecture
halls without any
complicated systems,
the very low technical
and financial capacity
of the contractor
coupled with project
poor management
resulted in
tremendous delays.
Again, it will
time to equip the
project area with
infrastructure and
utilities for building
occupancy after
completion.
This facility
was originally
eight single-
story reinforced
concrete
units for the
amount of
SR13.0million
April
2013
420 June
2014
Handed over
in 2018. It is
in use with
ongoing
corrective
measures &
maintenance
In use A facility that
originally designed
to be composed
of eight one-story
reinforced concrete
units. At the time of
the site handover
to contractor, it
was found that the
available plot of
land is inadequate
to accommodate
the eight units.
Consequently, the
owner suspended
the project for 6
months to change
the type of structures
and construction
materials for some
units from concrete
Table 1. continued
AlMunifi and Almutairi
Construction Economics and Building, Vol. 21, No. 4 December 2021126
Case study
description
D
at
e
of
c
on
tr
ac
t
si
gn
in
g
C
on
tr
ac
t d
ur
at
io
n
in
d
ay
s
D
at
e
to
b
e
co
m
pl
et
ed
P
ro
gr
es
s
in
%
a
s
of
m
id
-2
01
9
P
ro
gr
es
s
in
%
a
s
of
D
ec
. 2
02
0
Within-case analysis
to steel. Unqualified
contractor
particularly to the
new type of structure
and poor supervision
resulted in a poor-
quality work and
substantial delays in
project completion.
The final product can
barely carry out its
intended purpose.
Many operational
issues appeared,
and it took about 20
months to remedy
while the facility is
in operation. These
changes among
other notable risks
that adversely
affected the project,
such as, delays at
the beginning of
the project, owner
tardiness in decision
making, and scope
changes, resulted in
a substantial delay
in the completion
date of the project
that exceeded three
years. Moreover, the
final product can
merely perform for
the purpose that built
for.
Table 1. continued
AlMunifi and Almutairi
Construction Economics and Building, Vol. 21, No. 4 December 2021127
Case study
description
D
at
e
of
c
on
tr
ac
t
si
gn
in
g
C
on
tr
ac
t d
ur
at
io
n
in
d
ay
s
D
at
e
to
b
e
co
m
pl
et
ed
P
ro
gr
es
s
in
%
a
s
of
m
id
-2
01
9
P
ro
gr
es
s
in
%
a
s
of
D
ec
. 2
02
0
Within-case analysis
Residential
villas for the
academic staff
for the amount
of SR323.5
million.
Sep.
2009
1080 Sep.
2012
Plan for final
hand over
Plan
for final
hand over
The contract for
constructing
accommodation for
the academic staff
signed in 2009. Since
the preliminary
handover mid-2015,
the campus not
in use until date,
and may need at
the present costly
maintenance. 2. Lack
of infrastructure and
utilities to occupy the
building. Networks
services, such as
electricity, water,
waste drainage
systems are lacking.
It is a wasted
investment as of
mid-2021 the facility
still not yet in use.
Conferences
and multiple-
use buildings
for an amount
of about
SR200.0
million.
Dec.
2012
1080 Dec.
2015
60 71 It is intended to be a
multiple use facility
and consequently a
good time invested
in design to bring the
final product up to at
least local standards.
The construction
site handed over
to contractor in
December 2012 and
expected to complete
works by the end
of 2015. Because of
shortage in financing
the project, the
works commenced
only in three
buildings instead of
Table 1. continued
AlMunifi and Almutairi
Construction Economics and Building, Vol. 21, No. 4 December 2021128
Case study
description
D
at
e
of
c
on
tr
ac
t
si
gn
in
g
C
on
tr
ac
t d
ur
at
io
n
in
d
ay
s
D
at
e
to
b
e
co
m
pl
et
ed
P
ro
gr
es
s
in
%
a
s
of
m
id
-2
01
9
P
ro
gr
es
s
in
%
a
s
of
D
ec
. 2
02
0
Within-case analysis
five with changes
in design. The
inexperience
contractor in similar
construction, poor
supervision and
weak safety culture
resulted in a major
accident, the collapse
of large under
construction floor
killing 10 people. The
owner decided to
withdraw the project
in Sep. 2018, where
work progress did
not exceed 41%. The
second contactor
in the list took over
and progressing very
slow. The project is
still not completed
and the progress as
in 2020 is only 66%.
New building to
accommodate
engineering
students
In the
tender.
process
Design documents
were developed in
2014, the initial cost
estimate at that time
was SR100.00 million.
In December 2018,
after five years had
elapsed, the invitation
to bid was issued
using the same
tendering documents.
As of mid-2021,
bids evaluation and
negotiation continues,
and the contract not
yet been awarded.
*The % of progress went down due to a request for additional works, i.e., infrastructure.
Table 1. continued
AlMunifi and Almutairi
Construction Economics and Building, Vol. 21, No. 4 December 2021129
Table 2. Profiles of participants in focus-group discussions
Organization Role Experience in years
Case 1 Case 5 Case 8
Client Project Manager 15 10 12
Former Project Manager - - 20
Engineer 6 5 17
Supervising consulting firm Senior Engineer 16 - -
Site Engineer 8 5 -
Contractor Project Manager 22 - 25
Planning Manager 15 - -
Site engineer 10 5 15
Benficiery/end user Department Head - 4 -
Teaching staff - 6 -
Adminstrative staff - 8 -
Table 3. Profiles of experts
Organization Position Experince in years
Client Portfolio Director 15
Former Project Manager 20
Supervising consulting firm Senior Engineer 16
Contractor Project Manager 22
Benficiery/end user Vice-Dean 6
Teaching staff 8
Analysis, Findings and Discussion
The data collection process that was based on a deductive approach that implied pre-established and
preconceived structured themes (Fig.2), has simplified the integration of data for analysis, interpretation,
and results presentation. The first step was to examine the data contents that were in the Arabic language,
then to retrieve and tabulate responses according to the pre-established themes. The researchers then
translated the responses verbatim into English. The analytical technique which was followed is the deductive
content analysis that is based on earlier identification of main issues throughout project implementation
phases.
TRIANGULATION OF FINDINGS
According to Oesterreich and Teuteberg (2016), triangulation offers to researchers the opportunity of
viewing and analysing the research topic from different perspectives. As a result, the research questions can
be better answered because researchers can put together the different findings from the various methods
AlMunifi and Almutairi
Construction Economics and Building, Vol. 21, No. 4 December 2021130
and produce more consistent and convergent results. The benefits of using a mixed method research design
(Abowitz and Toole, 2010) is that they are especially applicable to areas of construction research that align
with the social sciences, and involve human actions in construction processes, such as leadership, innovation,
and planning. This approach enabled researchers to triangulate the collected data to enhance results and
findings. Data from field visits, direct observation, contractual documents analysis, case studies, focus groups
discussions and interviews have been used to formulate an understanding of the culture dominating the
construction project implementation in the KSA. Figure 2 serves as a reference point for this discussion.
Figure 2. Phases and sub-phases of construction project life cycle
PRE-CONSTRUCTION PHASE
Walking with participants through the observed issues in the case studies, and after cross-checking findings
with experts, it was easy to grasp the sources of barriers and snags that show up throughout the projects
lifecycle. Most of these issues can be prevented during pre-construction according to Autodesk (2020a) by
having an integrated preconstruction strategy.
Project initiation
The process of building sufficient data with which owners can address risk and make decisions to commit
resources in order to maximize the potential for a successful project is not a practice. It is obvious that
there are missing learning opportunities for KSA construction sector that can be gained through projects
final review and evaluation, which would benefit similar future projects. This is supported by Algahtany,
Alhammadi and Kashiwagi (2016) who found that decision making is based on lack of information.
Project estimates are not based on accurate calculations but retrieved from outdated and limited similar
projects data that misinform budget allocations. “The initial project cost estimate is not based on accurate
calculations, and the annual allocation for ongoing projects is inaccurate” a statement that was agreed upon
on in focus group discussions. It is in line with AlSehaimi, et al. (2013), Mahamid (2016) and Almutairi
and AlMunifi (2020) who confirm that poor planning and scheduling is one of the top severe factors
contributing to inefficient implementation and to not achieving the project development goals.
The research findings prove that there are a number of disconnected activities, and crystal-clear
weaknesses in the pre-construction planning (PCP) or front-end planning defined by the Construction
Industry Institute (2012), as there is no pre-construction team to handle this phase. Even the “project
manager is appointed after contract awarding” as quoted by a PM.
AlMunifi and Almutairi
Construction Economics and Building, Vol. 21, No. 4 December 2021131
One of the main findings is that there is a disconnect between projects’ phases and people. The
construction phase is not integrated into the pre-construction phase. Therefore, the final product could
differ widely from what had been initially planned. The inefficient and ineffective project implementation
is a result of traditional regulations as well as poor management practices; either those of the owner’s
organization, the pre-construction team or the construction team, as referred to by Gopang, Imran and
Nagapan (2020), Mitra and Wee Kwan Tan (2012), Simushi (2017), Alofi, Kashiwagi and Kashiwagi (2016)
and Alzara, et al. (2018). The project manager as a focal point is appointed after the contract awarding.
The construction team is unaware and not involved in pre-construction activities. The hand-off from pre-
construction to the construction team is a critical aspect of the preconstruction process to ensure that the
construction team knows where all of the critical construction challenges are (Autodesk, 2020a).
It is crucial to define the project scope (Fageha and Aibinu, 2014) at the earliest stage and involve all
stakeholders, and in particular, the end-user. The Cases 1 & 2 are exemplary cases for not involving end-
users in project initiation and design. “They do not consult us”, a former college Dean complained. This
resulted in lack of ownership or exaggerations in showing ownership by imposing changes to designs and
construction sites that were costly and exposed the projects to overruns from the very beginning, as can be
read in the case studies, and in line with Mitra and Wee Kwan Tan (2012) and Alshihre, et al. (2020).
Design documents preparation
The weaknesses in engineering practices and standards that organize the profession is one of the major
issues in the KSA construction industry. Recruiting a design engineering firm that has no specific
experience in the organization business has serious consequences, as it is one the most significant causes
of deficiencies in design documents (Assaf, Hassanain and Abdallah, 2018), such as producing identical
designs for facilities that run completely different educational programs. “It is not stated clearly in the RFP
that the EDCF must have experience in designing educational facilities” as quoted by one PM. The lack
of partnership with owners characterizes the design firms work. It was found that no conceptual design is
presented, with few exceptions, to be discussed with the owner and beneficiary, and to get the necessary
approvals. The same applies to architectural and structural designs. By all means, it is akin to having no
partner from the owner side. There is a capacity issue in the project management directorates. However,
there is also a belief that the design firm is the most knowledgeable and nobody can sound the alarm or
comment on their work. Under time-bounded contract, the designer works in one direction characterized by
a disconnect between inter-relational design activities as illustrated below.
It was also found that it is not a practice to have a peer design firm to review design documents and run
value engineering, nor constructability analysis in the production of the design documents. This is in line
with findings from Assaf, Hassanain and Abdallah (2018) and Love, Ahiaga-Dagbui and Irani (2013). To
protect professional liability, the designer should avoid any conflict between construction specifications and
drawings and should work toward limiting the number of errors and omissions to produce accurate cost and
time estimates. In traditionally procured projects as is the case of this research, drawings contain the highest
number of errors, followed by the bill of quantities and specifications (Dosumu, 2018). The owner relies
completely on the design firm, and the lack of interest by approving authorities to carefully check the design
is one of the top causes of discrepancies ( Chaudary et al., 2017).
AlMunifi and Almutairi
Construction Economics and Building, Vol. 21, No. 4 December 2021132
Procurement: invitation to bid and contracting
When a budget is allocated for a project, things then move very hastily without updating the tender
technical documents that were developed years prior, as the main focus at this stage is to use the allocated
funds. The time gap between producing design documents, bid invitation and construction, which is referred
to by Love, Holt and Li (2002) as “procurement gap”, is one of the reasons for design alterations and
variation orders. This is valid in almost all case studies, and particularly in Case 9. A supervision engineer
expressed frustration: “the design documents of the project that I monitor were prepared 7 years ago and
have not yet been contracted to start execution”. He added: “the project is just announced for tendering
without any reviewing and updating design documents.”
The traditional procurement method, design-bid-build, dominates and is extensively practiced in the
KSA. This method lacks innovation and does not make use of new developments in design, materials, and
construction approaches, and constitutes a potential cause of projects poor performance (Simushi, 2017;
Alofi, Kashiwagi and Kashiwagi, 2016; Alzara, et al., 2018). Procurement is more important than the
construction phase according to Kabirifar and Mojtahedi (2019). The lengthy procedures and deficiencies
in tender documents along with payments delay are risks that are priced by bidders. Data from case studies
show that unit cost is higher in governmental projects than in non-governmental projects. This is in line
with AlMunifi and Alameri (2019) who found that contractors add up to 20% for the client’s procurement
procedure, approvals and payment cycle. In the absence of the inadequate attention to the technical and
financial capacities of the bidders, the data collected from the nine case studies show that the outcome
of the evaluation process of bids was in favour of lowest price bid (Alzara, et al., 2018). This was also the
participants’ common concern.
CONSTRUCTION PHASE
Project management team
The management team, the supervision consultant and the contractor constitute the construction team that
is disconnected from the pre-construction work. While the team’s mandate is to ensure efficient project
execution, enormous challenges stand before them from day one. The roots of the ensuing complications
in the construction phase can be clearly seen. It was found that there are considerable delays in all projects.
None of the case studies projects were completed or are expected to be completed according to the
contracted time period. There is a capacity issue, lack of knowledge and leadership that would enable the
PM to take on the role of managing all parties. This may result in high-level accidents as stated by Wu, Li
and Fang (2017) and demonstrated in Case 8.
The findings show that there is neither a setup and competitive process to appoint the management
team nor a set of criteria to monitor the management team performance. Having a formal management
system for developing and updating KPIs can impact team performance and project efficiency (Mir and
Pinnington, 2013; Arditi and Alavipour, 2019).
Site delivery: The readiness of the construction site:
It is common that construction sites are not delivered to contractors within the period specified in the
contract documents. A PM stated: “The timeframe is two weeks, but usually it takes longer”. The non-
involvement of the beneficiary in the pre-construction phase worsens the situation. The findings show
that either designs did not fit on the assigned construction site, or the beneficiary moved the project to a
site that differed in topography and soil conditions. This results in alteration of project scope, design, type
of structural system as well as construction materials. Any alteration to design documents was carried out
by the contractor as the design firm contract had already ended. These changes complicated the situation
AlMunifi and Almutairi
Construction Economics and Building, Vol. 21, No. 4 December 2021133
and resulted in change orders and project overruns as supported by Gopang, Imran and Nagapan (2020)
and Assaf, Hassanain and Abdallah (2018). It was found that the wasted time for handling such changes
exceeded a year.
Mobilization plan and time schedule
The findings show that there are no obligatory regulations to command contractors to submit site
mobilization plans. “It is the contractor’s business to handle site” quoted a site manager. It is completely left
up to the contractor to manage site mobilization and de-mobilization. Some contractors used to develop
suitable time schedules and update them frequently using planning software. They recruited skilled workers
that contributed to timely project completion and led to owner satisfaction (Alshihre, et al., 2020). On the
other hand, others just utilized a very simple tool, Gantt chart with bulk activities. Nevertheless, project
time schedule is not respected by key players.
Monitoring & controlling of project execution
In the absence of an integrated project planning document that identifies and schedules all resources to
be used for efficient implementation of a project, it is normal that such project will be uncontrollable. The
poor projects performance at the construction stage relates closely to KSA construction sector issues, such
as drawbacks of the construction firms in term of the inefficient use of construction technology, advanced
building materials and equipment (Sayyed, Hatamleh and Alaya, 2021) and management weaknesses in
implementing the knowledge management processes, construction planning, risk management, monitoring
and controlling of time, cost and scope (Alotaibi, Sutrisna and Chong, 2016). The findings also show that
project management teams do not lead, they just manage the work of contractors. The issues that have
accumulated from the pre-construction phase coupled with lack of a timely response from the supervisor
engineer to the contractor quarries and claims, certificate approval and disbursement, require a very
proactive and decision-making management as also concluded by Assaf, Hassanain and Mughal (2014).
Preliminary handover and building occupancy
It is a crucial phase of the project in which project outsiders inspect if the product is truly what has been
designed, and test if the facility works and delivers services that it has been built for. Therefore, it is essential
for the project team to have all documents, such as As-Built Drawings, certificates and reports of systems
testing and commissioning, operation and maintenance manuals, health and safety manuals, well-preserved
and easy to access by the handover committees, owner and operation teams. Nonetheless, this phase is
not given as much weight as other phases by most of the project stakeholders, which leads to information
gaps between the project construction and post-occupancy phases (Tan, Zaman and Sutrisna, 2018). The
findings show that the issues that govern the project performance throughout the construction phase
have their negative consequences on facility operation. These can be seen through defects and re-work
required after handover in almost all completed facilities. The findings also show a wide variation between
the final product and initial design that is very relevant to poor planning in the pre-construction phase.
There is a waste of investment where facilities remain idle for years after handover due to either alteration
requirements or lack of infrastructure and utilities suitable for building occupancy.
FINAL HANDOVER AND CLOSEOUT
The especially important question that arises after the elapsed maintenance period (12 months) from
the preliminary handover is: has the facility satisfied the user requirements? The closeout phase includes
a variety of activities requiring careful attention not only from the operation team but also from the
management and contractor team who are now busy with new projects. Nonetheless and according
AlMunifi and Almutairi
Construction Economics and Building, Vol. 21, No. 4 December 2021134
to DeMarco (2011) it is most often miscalculated. This phase involves a number of tasks and presents
learning opportunities for the organization through the project final review and audit report that would
benefit similar future projects. This is because it is an opportunity for post-occupancy evaluation, the
implementation of which still faced barriers in the Saudi construction industry (Hassanain, et al., 2020).
The Future is built on data (Autodesk, 2020b). Therefore, planning for future construction projects will
draw upon the massive amounts of data collected from previous projects. This is a missed opportunity as the
findings confirm. As it can be read in table (1), many facilities are not operated on a timely manner; neither
are lessons documented for future use.
Conclusions
The first research question is, why construction projects perform poorly throughout project phases, and how
does this lead to inefficient and ineffective project implementation? The research design, methodology and
data collection, helped in answering the questions. Assuming that a project goes through the major phases
shown in the following diagram:
1. The pre-construction phase is not well-established in the KSA construction projects. Few disconnected
activities are carried out in different time spans. The deliverables of these activities may collect dust on a
shelf somewhere for years until funds are allocated. Even the last sub-phase of pre-construction, namely the
contracting, may take years as clearly indicated in one of the case studies. The outdated designs, materials,
specification, estimates, and even contractor quotations represent the first barrier in the road to implement
projects efficiently and effectively. Therefore, it can be concluded that there is a very foggy pre-construction
phase, and projects start at the construction phase as illustrated hereunder.
2. The non-existence of a pre-construction team to hand-off to the newly formed construction team is
a challenge to the management team and supervision consultant. What has been practiced until signing
a construction contract seems irrelevant to the construction site. Therefore, problems start immediately
with site delivery to contractor, the unavailability of infrastructure and utilities, and in some cases the
interventions of the beneficiary. The current practices do not challenge contractors to submit along
with their offers proposed methods of construction, type of equipment, and personnel qualifications.
Mobilization plans, and in several cases, even time schedules were not provided and, it appears, were not a
requirement. Monitoring and Controlling is very weak. There is a lack of management toolbox and PMTs
are not proactive enough. They react to problems instead of acting proactively to avoid these problems
before they occur. The PMTs must be challenged and encouraged, and at the same time should be held
accountable. A set of KPIs to measure the management performance would challenge project managers.
Projects that are completed on time are usually not because they were managed well, but as a result of the
contractor’s technical and financial capability. Those very few contractors do the best not to gain a bad
reputation. At the end, most of the failed projects are assigned to those contractors.
AlMunifi and Almutairi
Construction Economics and Building, Vol. 21, No. 4 December 2021135
3. The unavailability of utilities (electricity, water, and telecommunication networks) makes testing of
systems impossible. A preliminary handover is based on superficial inspection and a report is issued with
minor remarks.
Figure 3. An integrated strategic construction project management framework
AlMunifi and Almutairi
Construction Economics and Building, Vol. 21, No. 4 December 2021136
4. Most of the facilities have not been operational after the preliminary handover for a number of reasons.
Buildings stand idle for years as shown in Table 1, either because no infrastructure and utilities exist, or the
beneficiary is not satisfied and attempts to avoid the moving problems. The future usage of the facility may
differ from the purpose for which it was built. Then alterations start to adapt to the new requirements. In
some cases, the facility failed to deliver the desired benefits effectively and additional investment is needed
to treat deficiencies.
The second research question is, how an in-place ISCPMF would ensure efficient and effective project
implementation. Having in mind the current practices and overall challenges facing the Saudi construction
sector, the researchers propose an ISCPMF (Figure 3), which incorporates the findings of the present
work as it benefited from best practices in the construction project management. The framework calls for
institutionalization of projects phases by setting up for each sub-phase a matrix of objectives, deliverables,
milestones activities and composition of responsible teams. It is expected that the sets of structured tasks
that extend over the project lifecycle would ensure a well-established pre-construction team that will
successfully accomplish activities in a timely manner from project identification to construction contract
signing, and hand-off to the construction team. This will in turn ensure project execution and collaboration
with beneficiaries for timely handover and facility occupation.
The foggy pre-construction phase should be given great attention to overcome issues listed earlier. Five
project sub-phases are named, and each one has an objective and an output that should be produced by a
pre-construction team in a timely manner and endorsed by the organization. This will ensure a smooth and
successful transfer to the construction phase.
The main actors of the pre-construction team are now part of the construction team. The proposed
tasks under the three-project construction sub-phases will alleviate poor current practices that have
been elaborated in the findings and discussion section and will definitely lead to an efficient project
implementation. To overcome the waste of investment by not operating facilities immediately after the
handover, two sub-phases are named with proposed activities and teams that would result in effective project
delivery. It is of great importance to conduct a project final review and evaluation and document lessons to
be learned to benefit future projects.
Future research
The adoption of the ISCPMF will greatly improve projects delivery. Evaluation and enhancement by
researchers and practitioners should continue. The cost of investment in projects that take more than double
the contacted period as well as the price of not using facilities that stand idle for years without operation, are
areas to be explored. The outbreak of COVID-19 pandemic has maximized the Saudi construction sector
challenges. The performance of the Saudi construction sector amid coronavirus pandemic in particular, and
the capability of the sector to face such crises, needs to be investigated.
References
Abowitz, D. and Toole, T., 2010. Mixed Method Research: Fundamental Issues of Design, Validity, and Reliability in
Construction Research. Engineering and Management, [e-journal] 136(1), pp.108-16. https://doi.org/10.1061/(ASCE)
CO.1943-7862.0000026
Algahtany, M., Alhammadi, Y. and Kashiwagi, D., 2016. Introducing a New Risk Management Model to the
Saudi Arabian Construction Industry. Procedia Engineering, [e-journal] 145, pp.940-947. https://doi.org/10.1016/j.
proeng.2016.04.122
AlMunifi and Almutairi
Construction Economics and Building, Vol. 21, No. 4 December 2021137
https://doi.org/10.1061/(ASCE)CO.1943-7862.0000026
https://doi.org/10.1061/(ASCE)CO.1943-7862.0000026
https://doi.org/10.1016/j.proeng.2016.04.122
https://doi.org/10.1016/j.proeng.2016.04.122
Alofi, A., Kashiwagi, J. and Kashiwagi, D., 2016. The Perception of the Government and Private Sectors on the
Procurement System Delivery Method in Saudi Arabia, Procedia Engineering, [e-journal] 145, pp.1394-1401. https://
doi.org/10.1016/j.proeng.2016.04.175
Alotaibi, N., Sutrisna, M. and Chong, H., 2016. Guidelines of Using Project Management Tools and Techniques to
Mitigate Factors Causing Delays in Public Construction Projects in Kingdom of Saudi Arabia. Journal of Engineering,
Project, and Production Management, [e-journal] 6(2), pp.90-103. https://doi.org/10.32738/JEPPM.201607.0003
AlSehaimi, A., Koskela, L. and Tzortzopoulos, P., 2013. Need for Alternative Research Approaches in Construction
Management: Case of Delay Studies. The Journal of Management in Engineering, [e-journal] 29(4), pp.407-413. https://
doi.org/10.1061/(ASCE)ME.1943-5479.0000148
Alshihre, F., Chinyio, E., Nzekwe-Excel, C. and Daniel, E.I., 2020. Improving clients’ satisfaction in construction
projects: the case of Saudi Arabia. Built Environment Project and Asset Management, [e-journal] 10(5), pp.709-723.
https://doi.org/10.1108/BEPAM-12-2019-0140
Alzara, M., Kashiwagi, J., Kashiwagi, D. and Al-Tassan, A., 2018. Analysis of Cost Overruns in Saudi Arabia
Construction Projects: A University Case Study. Journal for the Advancement of Performance Information and Value,[e-
journal] 10(1). https://doi.org/10.37265/japiv.v10i1.24
American Society of Civil Engineers, 2013. Quality in the constructed project: a guide for owners, designers, and
constructors. 3rd ed. Virginia, USA.
AlMunifi, A. and Alameri, I. (2019). The impact of design approach and contracting practices on cost and execution
period of school buildings. Challenge Journal of Structural Mechanics, [e-journal] 5 (3), pp. 85-95. https://doi.
org/10.20528/cjsmec.2019.03.002
Almutairi, S. and AlMunifi, A. (2020). The effects of poor management practices on projects performance. Proceedings
of International Structural Engineering and Construction. Holistic Overview of Structural Design and Construction,
[e-journal]. https://doi.org/10.14455/ISEC.res.2020.7(1).CPM-02
Arditi, D. and Alavipour, S., 2019. Trends in Expectations about Duties and Responsibilities of Construction Managers.
J. Constr. Eng. Manage, [e-journal] 145(7): 04019037. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001661
Assaf, S., Hassanain, A. and Mughal, H., 2014. Effectiveness of Project Teams and their Impact on the Performance of
Saudi Construction Projects. Research Journal of Applied Sciences, Engineering and Technology, [e-journal] 7(24): 5148-
5156. https://doi.org/10.19026/rjaset.7.911
Assaf, S., Hassanain, M. and Abdallah, A., 2018. Review and assessment of the causes of deficiencies in design
documents for large construction projects. International Journal of Building Pathology and Adaptation, [e-journal] 36(3),
pp.300-317. https://doi.org/10.1108/IJBPA-10-2017-0050
Autodesk, 2020a. Winning in Preconstruction. Autodesk Construction Cloud. Available at Autodesk website [accessed 4 February 2021]
Autodesk, 2020b. The Ultimate Guide to Leveraging Data in your Construction Lifecycle. Available at Autodesk
website [accessed 4 February 2021]
Bubshait, A., Siddiqui, M. and Al-Buali, A., 2014. "The role of Communication and Coordination in Project Success: A
Case Study." J. Perform. Constr. Facil., [e-journal] 04014107-1. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000610
Choudhry, R., Gabriel, H., Khan, M. and Azhar, S., 2017. Causes of discrepancies between design and construction in
the Pakistan construction industry. Journal of Construction in Developing Countries, [e-journal] 22(2), pp.1–18. https://
doi.org/10.21315/jcdc2017.22.2.1
Construction Industry Institute, 2012. CII Best Practices Guide: Improving Project Performance. Version 4.0.
AlMunifi and Almutairi
Construction Economics and Building, Vol. 21, No. 4 December 2021138
https://doi.org/10.1016/j.proeng.2016.04.175
https://doi.org/10.1016/j.proeng.2016.04.175
https://doi.org/10.32738/JEPPM.201607.0003
https://doi.org/10.1061/(ASCE)ME.1943-5479.0000148
https://doi.org/10.1061/(ASCE)ME.1943-5479.0000148
https://doi.org/10.1108/BEPAM-12-2019-0140
https://doi.org/10.37265/japiv.v10i1.24
https://doi.org/10.20528/cjsmec.2019.03.002
https://doi.org/10.20528/cjsmec.2019.03.002
https://doi.org/10.14455/ISEC.res.2020.7(1).CPM-02
https://doi.org/10.1061/(ASCE)CO.1943-7862.0001661
https://doi.org/10.19026/rjaset.7.911
https://doi.org/10.1108/IJBPA-10-2017-0050
https://construction.autodesk.com/resources/winning-in-preconstruction-and-beyond-with-bim/
https://construction.autodesk.com/resources/winning-in-preconstruction-and-beyond-with-bim/
https://doi.org/10.1061/(ASCE)CF.1943-5509.0000610
https://doi.org/10.21315/jcdc2017.22.2.1
https://doi.org/10.21315/jcdc2017.22.2.1
DeMarco, A., 2011. Project Management for Facility Constructions. © Springer. https://doi.org/10.1007/978-3-642-
17092-8
Denzin, N. and Lincoln, Y., 2018. The SAGE Handbook of Qualitative Research. 5th ed. Sage Publications Inc.
Denzin, N., 2012. Triangulation 2.0. Journal of Mixed Methods Research, [e-journal] 6(2), pp.80-88. https://doi.
org/10.1177/1558689812437186
Dosumu, O. S., 2018. Perceived Effects of Prevalent Errors in Contract Documents on Construction
Projects. Construction Economics and Building, [e-journal]18(1), pp.1-26. https://doi.org/10.5130/AJCEB.v18i1.5663
Fageha, M. and Aibinu, A., 2014. Prioritizing Project Scope Definition Elements in Public Building
Projects. Construction Economics and Building, [e-journal]14(3), pp.18-33. https://doi.org/10.5130/AJCEB.v14i3.4155
Flick, U., 2018. Triangulation. The SAGE Handbook of Qualitative Research. Ed. Denzin, N. & Lincoln, Y. Sage
Publications. https://doi.org/10.4135/9781526416070.n34
Fay, M., Lee, H., Mastruzzi, M., Han, S. and Cho, M., 2019. Hitting the Trillion Mark: A Look at How Much
Countries Are Spending on Infrastructure. Available at the World Bank website. https://openknowledge.worldbank.
org/handle/10986/31234 [accessed December 2020] https://doi.org/10.1596/1813-9450-8730
Gopang, M., Imran, R. and Nagapan, S., 2020. Assessment of Delay Factors in Saudi Arabia Railway/Metro
Construction Projects. International Journal of Sustainable Construction Engineering and Technology, [e-journal]11(2),
pp.225-233. Retrieved from https://publisher.uthm.edu.my/ojs/index.php/IJSCET/article/view/7405. https://doi.
org/10.30880/ijscet.2020.11.02.028
Hassanain, M., Alamoudi, A., Al-Hammad, A. and Abdallah, A., 2020. Barriers to the implementation
of POE practices in the Saudi Arabian building industry. Architectural Engineering and Design
Management, [e-journal]16(2), pp.150-165. https://doi.org/10.1080/17452007.2019.1706440
Kabirifar, K. and Mojtahedi, M., 2019. The impact of Engineering, Procurement and Construction (EPC) Phases on
Project Performance: A Case of Large-scale Residential Construction Project. Buildings, [e-journal] 9(15). https://doi.
org/10.3390/buildings9010015
Li, B., Akintoye, A. and Holt, G., 2017. Empirical Study of Project Governance among Chinese Project Management
Professionals. International Journal of Architecture, Engineering and Construction, [e-journal] 6(2), pp.29-39. https://doi.
org/10.7492/IJAEC.2017.009
Love, P., Holt, G. and Li, H., 2002. Triangulation in construction management research. Engineering Construction and
Architectural Management, [e-journal] 9, pp.294-303. https://doi.org/10.1046/j.1365-232X.2002.00226.x
Love, P., Lopez, R. and Edwards, D., 2013. Reviewing the past to learn in the future: making sense of design errors and
failures in construction. Structure and Infrastructure Engineering, [e-journal] 9(7), pp.675-688. https://doi.org/10.1080/1
5732479.2011.605369
Love, P., Edwards, D., Irani, Z. and Walker, D., 2009. Project Pathogens: The Anatomy of Omission Errors in
Construction and Resource Engineering Project. in IEEE Transactions on Engineering Management, [e-journal] 56(3),
pp.425-435. https://doi.org/10.1109/TEM.2008.927774
Love, P., Ahiaga-Dagbui, D. and Irani, Z., 2016. Cost overruns in transportation infrastructure projects: Sowing the
seeds for a probabilistic theory of causation. Transportation Research Part A: Policy and Practice, [e-journal] (92), pp.184-
194. https://doi.org/10.1016/j.tra.2016.08.007
Mahamid, I., 2013. Contributors to schedule delays in public construction projects in Saudi Arabia: Owners’
perspective. Journal of Construction Project Management and Innovation, [e-journal] 3(2), pp.608–619. https://doi.
org/10.36615/jcpmi.v3i2.46
AlMunifi and Almutairi
Construction Economics and Building, Vol. 21, No. 4 December 2021139
https://doi.org/10.1007/978-3-642-17092-8
https://doi.org/10.1007/978-3-642-17092-8
https://doi.org/10.1177/1558689812437186
https://doi.org/10.1177/1558689812437186
https://doi.org/10.5130/AJCEB.v18i1.5663
https://doi.org/10.5130/AJCEB.v14i3.4155
https://doi.org/10.4135/9781526416070.n34
https://openknowledge.worldbank.org/handle/10986/31234
https://openknowledge.worldbank.org/handle/10986/31234
https://doi.org/10.1596/1813-9450-8730
https://publisher.uthm.edu.my/ojs/index.php/IJSCET/article/view/7405
https://doi.org/10.30880/ijscet.2020.11.02.028
https://doi.org/10.30880/ijscet.2020.11.02.028
https://doi.org/10.1080/17452007.2019.1706440
https://doi.org/10.3390/buildings9010015
https://doi.org/10.3390/buildings9010015
https://doi.org/10.7492/IJAEC.2017.009
https://doi.org/10.7492/IJAEC.2017.009
https://doi.org/10.1046/j.1365-232X.2002.00226.x
https://doi.org/10.1080/15732479.2011.605369
https://doi.org/10.1080/15732479.2011.605369
https://doi.org/10.1109/TEM.2008.927774
https://doi.org/10.1016/j.tra.2016.08.007
https://doi.org/10.36615/jcpmi.v3i2.46
https://doi.org/10.36615/jcpmi.v3i2.46
Mahamid, I., 2016. Factors contributing to poor performance in construction projects: studies of Saudi
Arabia. Australian Journal of Multi-Disciplinary Engineering, [e-journal] 12(1), pp.27-38. https://doi.org/10.1080/14488
388.2016.1243034
Mathar, H., Assaf, S., Hassanain, M., Abdallah, A. and Sayed, A., 2020. Critical success factors for large building
construction projects: Perception of consultants and contractors. Built Environment Project and Asset Management,
[e-journal] 10 (3), pp.349-367. https://doi.org/10.1108/BEPAM-07-2019-0057
Ministry of Education, Kingdom of Saudi Arabia (2021). Available at the MOE website https://www.moe.gov.sa/ar/
mediacenter/MOEnews/Pages/pr-1442-452.aspx.[Accessed 27 June 2021].
Mir, F. and Pinnington, A., 2013. Exploring the value of project management: Linking Project Management
Performance and Project Success. International Journal of Project Management, [e-journal] 32 (2), pp.202-217. https://
doi.org/10.1016/j.ijproman.2013.05.012
Mitra, S. and Wee Kwan Tan, A., 2012. Lessons learned from large construction project in Saudi Arabia. Benchmarking:
An International Journal, [e-journal] 19 (3), pp.308-324. https://doi.org/10.1108/14635771211242978
Oesterreich, T. and Teuteberg, F., 2016. Understanding the implications of digitization and automation in the context
of Industry 4.0: A triangulation approach and elements of a research agenda for the construction industry. Computers in
Industry, [e-journal] 83, pp.121-139. https://doi.org/10.1016/j.compind.2016.09.006
Pinto, J. K., 2010. Project Management: Achieving Competitive Advantage. 2nd ed. Upper Saddle River: Pearson.
Pirotti, A., Keshavarzsaleh, A., Mohd Rahim, F. and Zakaria, N., 2020. Effective Factors on Project Success in
Malaysian Construction Industry. Journal of Engineering, Project, and Production Management, [e-journal] 10(1), pp.1-10.
https://doi.org/10.2478/jeppm-2020-0001
PMI, 2017. A Guide to the Project Management Body of Knowledge – 6th ed. Newtown Square, PA, USA.
Saudi Contractors Authority, 2020. COVID-19 impact on the contracting sector in Saudi Arabia Building resilience in
a turbulent environment. Available at the SCA website, sca.sa/16052020091859.pdf. [Accessed 20 August 2020]
Sayyed, Y., Hatamleh, M. and Alaya, A., 2021. Investigating the influence of procurement management in construction
projects on the innovation level and the overall project performance in developing countries. International Journal of
Construction Management, [e-journal]. https://doi.org/10.1080/15623599.2021.1889088
Serrador P and Turner R., 2015. The Relationship between Project Success and Project Efficiency. Project Management
Journal, [e-journal] 46(1), pp.30-39. https://doi.org/10.1002/pmj.21468
Simushi, S.J., 2017. An integrated management strategy to reduce time and cost overruns on large projects. PhD
dissertation, Stellenbosch University of Stellenbosch. Available at website, http://scholar.sun.ac.za/bitstream/
handle/10019.1/102691/simushi_integrated_2017.pdf?isAllowed=y&sequence=1. [Accessed 20 May 2020]
Tan, A.Z.T., Zaman, A. and Sutrisna, M., 2018. Enabling an effective knowledge and information flow between the
phases of building construction and facilities management. Facilities, [e-journal] 36(3/4), pp. 151-170. https://doi.
org/10.1108/F-03-2016-0028
Tatweer Building Company, 2020. Available at Tatweer website, https://www.tbc.sa/Library/. [Accessed 27 June 2021]
Teräväinen, V. J., Junnonen, J. M., and Ali-Löytty, S. 2018. Organizational Culture: Case of the Finnish Construction
Industry. Construction Economics and Building, [e-journal] 18(1), pp.48-69. https://doi.org/10.5130/AJCEB.v18i1.5770
Too, E. and Weaver, P., 2014. The management of project management: A conceptual framework for project
governance. International Journal of Project Management, [e-journal] 32 (8), pp.1382-1394. https://doi.org/10.1016/j.
ijproman.2013.07.006
AlMunifi and Almutairi
Construction Economics and Building, Vol. 21, No. 4 December 2021140
https://doi.org/10.1080/14488388.2016.1243034
https://doi.org/10.1080/14488388.2016.1243034
https://doi.org/10.1108/BEPAM-07-2019-0057
https://www.moe.gov.sa/ar/mediacenter/MOEnews/Pages/pr-1442-452.aspx
https://www.moe.gov.sa/ar/mediacenter/MOEnews/Pages/pr-1442-452.aspx
https://doi.org/10.1016/j.ijproman.2013.05.012
https://doi.org/10.1016/j.ijproman.2013.05.012
https://doi.org/10.1108/14635771211242978
https://doi.org/10.1016/j.compind.2016.09.006
https://doi.org/10.2478/jeppm-2020-0001
https://doi.org/10.1080/15623599.2021.1889088
https://doi.org/10.1002/pmj.21468
http://scholar.sun.ac.za/bitstream/handle/10019.1/102691/simushi_integrated_2017.pdf?isAllowed=y&sequence=1
http://scholar.sun.ac.za/bitstream/handle/10019.1/102691/simushi_integrated_2017.pdf?isAllowed=y&sequence=1
https://doi.org/10.1108/F-03-2016-0028
https://doi.org/10.1108/F-03-2016-0028
https://www.tbc.sa/Library/
https://doi.org/10.5130/AJCEB.v18i1.5770
https://doi.org/10.1016/j.ijproman.2013.07.006
https://doi.org/10.1016/j.ijproman.2013.07.006
Turner, R. and Zolin, R., 2012. Forecasting Success on Large Projects: Developing Reliable Scales to Predict Multiple
Perspectives by Multiple Stakeholders over Multiple Time Frames. Project Management Journal, [e-journal] 43(5)
pp.87-99. https://doi.org/10.1002/pmj.21289
U.S.-Saudi Arabian Business Council Report, 2018. Infrastructure Sector: Overview and Commercial Prospects in
Saudi Arabian and U.S. Construction, Real Estate, and Transport. Available at the USA-Saudi Business Council
website, https://ussaudi.org/wp-content/uploads/2018/02/ConstructionIndustryReport2017_Final.pdf. [Accessed 10
July 2020]
Ward, G., 2018. Effective Project Management: Guidance and Checklists for Engineering and Construction.
J.W.&Sons Ltd. https://doi.org/10.1002/9781119469322
White, D. and Fortune, J., 2002. Current practice in project management – an empirical study. International Journal of
Project Management, [e-journal] 20(1), pp.1–11. https://doi.org/10.1016/S0263-7863(00)00029-6
Williams T., 2016. Identifying Success Factors in Construction Projects: A Case Study. Project Management Journal,
[e-journal] 47(1), pp.97-112. https://doi.org/10.1002/pmj.21558
Wu, C., Li, N. and Fang, D., 2017. Leadership improvement and its impact on workplace safety in construction projects:
A conceptual model and action research. International Journal of Project Management, [e-journal] 35(8), pp.1495-1511.
https://doi.org/10.1016/j.ijproman.2017.08.013
Yamin, M. and Sim, A.K.S., 2016. Critical success factors for international development projects in Maldives: Project
teams’ perspective. International Journal of Managing Projects in Business, [e-journal] 9(3), pp. 481-504. https://doi.
org/10.1108/IJMPB-08-2015-0082
Yin, R.K., 2018. Case Study Research and Applications: Design and Methods. 6th ed. SAGE Publication Inc.
Zidane, Y.J. and Olsson, N.O.E., 2017. Defining project efficiency, effectiveness and efficacy. Int’l Journal of Managing
Projects in Business, [e-journal] 10(3), pp. 621-641. https://doi.org/10.1108/IJMPB-10-2016-0085
Zwikael, O., Pathak, R., Singh, G. and Ahmed, S., 2014. The moderating effect of risk on the relationship between
planning and success. International Journal of Project Management, [e-journal] 32(3), pp. 435-441. https://doi.
org/10.1016/j.ijproman.2013.07.002
AlMunifi and Almutairi
Construction Economics and Building, Vol. 21, No. 4 December 2021141
https://doi.org/10.1002/pmj.21289
https://ussaudi.org/wp-content/uploads/2018/02/ConstructionIndustryReport2017_Final.pdf
https://doi.org/10.1002/9781119469322
https://doi.org/10.1016/S0263-7863(00)00029-6
https://doi.org/10.1002/pmj.21558
https://doi.org/10.1016/j.ijproman.2017.08.013
https://doi.org/10.1108/IJMPB-08-2015-0082
https://doi.org/10.1108/IJMPB-08-2015-0082
https://doi.org/10.1108/IJMPB-10-2016-0085
https://doi.org/10.1016/j.ijproman.2013.07.002
https://doi.org/10.1016/j.ijproman.2013.07.002