id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
absel-2627	Decker, Ronald L.; Waedt, Fred A.; Allen, Stuart J.; Headington, Mark R.	Foundry: A Foundry Simulation	1979	5	.pdf	application/pdf	3432	145	47	Also, there is a 1/4 hour lag time between core production and usage at a molding station. In addition, information is print-ed on the mean core box production rate per hour and mean mold production rate per hour at each center as an aid to determining operator efficiency.	cache/absel-2627.pdf	txt/absel-2627.txt
