Microsoft Word - 43-3338_s_ETASR_V10_N1_pp5340-5345 Engineering, Technology & Applied Science Research Vol. 10, No. 1, 2020, 5340-5345 5340 www.etasr.com Duong et al.: Available Transfer Capability Determination for the Electricity Market using Cuckoo … Available Transfer Capability Determination for the Electricity Market using Cuckoo Search Algorithm Thanh Long Duong Faculty of Electrical Engineering Technology Industrial University of Ho Chi Minh City Ho Chi Minh City, Vietnam duongthanhlong@iuh.edu.vn Thuan Thanh Nguyen Faculty of Electrical Engineering Technology Industrial University of Ho Chi Minh City Ho Chi Minh City, Vietnam nguyenthanhthuan@iuh.edu.vn Ngoc Anh Nguyen Faculty of Electrical Engineering Technology Industrial University of Ho Chi Minh City Ho Chi Minh City, Vietnam nguyenngocanh@iuh.edu.vn Tong Kang College of Electrical and Information Engineering Hunan University, China kangtong126@126.com Abstract—In the electricity market, power producers and customers share a common transmission network for wheeling power from generation to consumption points. All parties in this open access environment may try to produce energy from cheaper sources for greater profit margin, which may lead to transmission congestion, which could lead to violation of voltage and thermal limits, threatening the system security. To solve this, available transfer capability (ATC) must be accurately estimated and optimally utilized. Thus, accurate determination of ATC to ensure system security while serving power transactions is an open and trending research topic. Many optimization approaches to deal with the problem have been proposed. In this paper, Cuckoo Search Algorithm (CSA) is applied for determining ATC problem between the buses in deregulated power systems without violating system constraints such as thermal, voltage constraints. The suggested methodology is tested on IEEE 14 and IEEE 24- bus for normal and contingency cases. The simulation results are compared with the corresponding results of EP, PSO, and GWO and show that the CSA is an effective method for determining ATC. Keywords-CSA; ATC; congestion; electricity market I. INTRODUCTION One of the key features of the competitive electricity market is fair and open transmission access of the network to all users which may result to the frequent overloading of transmission system facilities. Assessment of available transfer capability for the economic utilization of the available system components with regard to system security plays a vital role in operational planning and real time operation of a system. With the development of renewable energy power generation technology and the increase of power load demand, renewable energy power generation can not only service specific users outside the power grid, but also can be massively incorporated into the power grid. Renewable energy power generation has many advantages, but its intermittent and stochastic output may influence the power system. Renewable energy power generation could increase the uncertainties of the power system which has significant effects on the transfer capability of the transmission system. Hence, transmission congestion management problem and analysis of the impacts of renewable energy has become an important challenge [1-4]. Secure and reliable operation of transmission network requires the Independent System Operators (ISO) to determine and update ATC at regular intervals for its optimal commercial use [5]. The ATC of a transmission network is the unutilized transfer capability of the network for the transfer of power for further commercial activity, over and above the already committed usage [6]. Essentially, ATC is a measure of the extra transmission capability above the base case power transfer for the purpose of power marketing. ATC value can be derived by considering various parameters relating to transfer capabilities such as Total Transfer Capability (TTC), Transmission Reliability Margin (TRM), and Capacity Benefit Margin (CBM). TTC is the summation of all the network transfers (base case and commercial transfers) including the margins for system security and reliability, and existing transmission commitments (ETC). TRM is the network margin reserved for system uncertainties whereas CBM is the network margin reserved for external generation in case of emergency generation outages. It is measured by the loss of load expectation. Adequate ATC is needed to ensure all economic transactions, while sufficient ATC is needed to facilitate electricity market liquidity. It is necessary to maintain economical and secure operation over a wide range of system operating conditions and constraints. An accurate value of ATC can be used in forecasting future upgrading of the transmission network. The precise calculation of ATC should include system constraints such as voltage limit, thermal limit, real and reactive power generation limit, and system uncertainties. Corresponding author: Thanh Long Duong Engineering, Technology & Applied Science Research Vol. 10, No. 1, 2020, 5340-5345 5341 www.etasr.com Duong et al.: Available Transfer Capability Determination for the Electricity Market using Cuckoo … Several approaches have been proposed for ATC computation including linear approximation methods (LAMs) [7], Repetitive Power Flow (RPF) [8], Continuation Power Flow (CPF) [9], Optimal Power Flow (OPF) [10], and Artificial Intelligence (AI) techniques [11]. Different AI techniques have been used to solve various optimization problems [12-14]. Applying meta-heuristic algorithms for determining the ATC have been proposed recently: Genetic Algorithm (GA) [15], Bee Algorithm (BA) [16], Particle Swarm Optimization (PSO) [17], and Evolutionary Programming (EP) [18-19]. AI approaches are employed to avoid local optimal solutions associated with conventional optimization techniques, especially for highly nonlinear systems. Authors in [20] have developed a new meta-heuristic algorithm called Cuckoo Search Algorithm (CSA) which is inspired from the obligate brood parasitic behavior of some cuckoo species. A cuckoo bird will choose a random nest of other species and lay and dump its egg in it. An egg is either hatched and carried over to the next generation or abandoned by the host bird. It is an efficient meta-heuristic algorithm that balances between the local search strategy (exploitation) and the whole space (exploration) [21]. In each generation, there are two new populations created using the Levy flight and discovering alien egg mechanisms. The first mechanism helps CSA to explore the search space while the second mechanism supports CSA to exploit the search space, ensuring that the obtained results from CSA have better quality compared to others. In addition, there is only one control parameter for CSA in the search process, which makes it more reliable for applying to the optimal problem. The CSA algorithm has been proposed for solving power system security in [22]. In this paper, CSA is applied for determining the ATC of power transactions between sources and sink areas in a deregulated power system considering thermal and voltage limits. The proposed approach is demonstrated on the IEEE 14-bus and the IEEE 24-bus test systems. II. OBJECTIVE FUNCTION The main objective of this work is to determine the available power that can be transferred from a specific set of generators of a source area to loads in a sink area, subject to real and reactive power generation limits, voltage limits, and line thermal limits. The ATC is determined by starting from an initial point and then increasing the load by a factor λ until a system limit is reached [15]. The details of ATC computation are given below: )()( 0 1 0 max 1 λλ ∑∑ == −= load i Di load i Di ATC obj PPF (1) Subject to: • The real and reactive power balance equations: GiGio j Diocij PPPP +=++∑ ∀ )1( , λ (2) GiGio j Diocij QQQQ +=++∑ ∀ )1( , λ (3) • The power generation limits: max 0 GiGiGio PPP ≤+≤ (4) max 0 GiGiGio QQQ ≤+≤ (5) • The voltage limits: maxmin iii VVV ≤≤ (6) • The apparent power flow limit: max2 , 2 , ijcijcijij SQPS ≤+= (7) To effect the generation and load changes, the active power generation and the active and reactive loads in the source and sink areas, respectively, need to be modified using the scalar parameter λ. 0 ( ) . (1 ) Gi Gi P Pλ λ= + (8) 0 ( ) . (1 ) Di Di P Pλ λ= + (9) 0 ( ) . (1 ) Di Di Q Q= +λ λ (10) where PGio, PDio and QGio, QDio are the active and reactive power respectively of bus i in the base case. λ=0 corresponds to no transfer (base case) and λ=λmax corresponds to the largest value of transfer power that causes no limit violations. PDi(λmax) is the sum of load in sink area when λ=λmax while PDio refers to the sum of load when λ=0. III. APPLICATION OF CSA ON ATC PROBLEM DETERMINATION The steps of determining the ATC problem using the proposed CSA are presented below. Step 1: Read the power system data and set associated parameters such as the host nests size n, the probability of an alien egg in a nest of a host bird to be discovered Pa∈ [0, 1], the number of variables to be optimized d, the maximum number of iterations Itmax. Step 2: Initialize n host nests {Xi (i=1, 2, …, n)}. Each of these nests is concatenated of two strings and represents a feasible solution to the optimization problem. Step 3: Evaluate the fitness function of the initial n host nests based on the results of power flow analysis, choose the best value of each nest Xbesti (i=1, 2, … , n) and the global best nest among all nests Gbest which is corresponding to the best fitness function, store the fitness values and the best fitness value. lim 2 lim 2 1 1 lim 2 max 2 1 1 NB NB f obj p gi gi q gi gi i i NB NL V i i S li li i i F F k (P P ) k (Q Q ) k (V V ) k (s S ) = = = = = − − − − − − − − ∑ ∑ ∑ ∑ (11) Step 4: Get cuckoos (new solutions) randomly based on the previous best nest via Lévy flights. The new solution for each nest is calculated using (12) and (13): 1 new new i i i X Xbest rand Xα= + × ×∆ (12) Engineering, Technology & Applied Science Research Vol. 10, No. 1, 2020, 5340-5345 5342 www.etasr.com Duong et al.: Available Transfer Capability Determination for the Electricity Market using Cuckoo … where α>0 is the updated step size, rand1 is a normally distributed stochastic number, and the increased value new iX∆ is determined by: ( ) 1 new u u i i vv rand X Xbest Gbest rand β σ σ ∆ = × × − (13) where randu and randv are two normally distributed stochastic variables with standard deviation σu and σv given in (14). 1 ( 1) 2 (1 )sin( 2) [(1 ) 2] 2 1 u v β β β πβ σ β β σ −   Γ + =   Γ +    = (14) where β is the distribution factor (0.3≤β≤1.99). Step 5: Evaluate the new solutions’ fitness function based on the results of power flow analysis, determine the newly best value of each nest Xbesti and the global best nest Gbest by comparing the stored fitness values in Step 3 with the newly calculated ones, update the best value of each nest Xbesti and the global best nest Gbest, store the fitness values and the best fitness value. Fig. 1. The flowchart of the proposed process of applying the CSA to determine ATC Step 6: Discovering an alien egg in a nest of a host bird with the probability of Pa creates a new solution for the problem similar to the Lévy flights. The new solution because of this action is calculated by (15), (16) and (17): disc disc i i i X Xbest C X= + ×∆ (15) 2 1 0 a if rand P C otherwise < =   (16) 3 1 2 [ ( ) ( )] disc i i i X rand randp Xbest randp Xbest∆ = × − (17) where rand2 and rand3 are the distributed random numbers on the interval [0, 1], randp1(Xbesti) and randp2(Xbesti) are the random perturbation for positions of nests in Xbesti. Step 7: Evaluate the new solutions’ fitness function based on the results of power flow analysis, determine the newly best value of each nest Xbesti and the global best nest Gbest by comparing the calculated fitness function from this new solutions with the stored fitness values in Step 5, update the best value of each nest Xbesti and the global best nest Gbest, store the fitness values and the best fitness value. Step 8: If the predefined maximum number of iterations Itmax is reached, the computation is terminated and the results are displayed, else go to Step 4. The flowchart of the proposed process is shown in Figure 1. IV. NUMERICAL RESULTS The ATC for each of the stipulated source to sink power transfers on two IEEE systems (IEEE 14-bus and IEEE 24-bus) reliability is tested. The IEEE 14-bus system consists of 5 generators and 20 lines as shown in Figure 2, while there are 41 lines and 11generators in the IEEE 24-bus system as shown in Figure 3. The network and load data are given in [23]. Based on experimental results, the optimal control parameters of CSA have been selected for the 14-bus and 24-bus systems as: The number of nests for the two systems is 20 and 25 respectively. The rate of detection of alien eggs and the maximum number of iterations are 0.25 and 100 respectively for both systems. Fig. 2. The IEEE 14-bus system In order to apply the proposed methodology in security studies and in congestion management, ATC values are computed in selected line outages. In the studies, the ATC Engineering, Technology & Applied Science Research Vol. 10, No. 1, 2020, 5340-5345 5343 www.etasr.com Duong et al.: Available Transfer Capability Determination for the Electricity Market using Cuckoo … margin is limited by bus voltage magnitude in the range of 0.95-1.15pu. The variation in ATC over the base state for both systems is studied with line outages, in line 16 (bus 13 to bus 14) in the IEEE 14-bus system and in line 8 (bus 4 to bus 9) in the IEEE 24-bus system. Fig. 3. The IEEE 24-bus RTS system The ATC results for each of the stipulated source to sink power transfers on the IEEE 14-bus and 24-bus systems with and without line outage are tested by CSA, EP, GWO and PSO algorithms. From the results in Tables I-IV and Figures 4-9 it can be seen that CSA has the ability to converge quickly while achieving better ATC compared to EP, GWO and PSO while the power on the branches and the voltage at the buses also meet the allowable limits as shown in Figures 3 and 4. TABLE I. ATC WITH NORMAL TOPOLOGY IEEE 14-BUS SYSTEM Source/sink bus no ATC EP GWO PSO CSA 1/9 54.2131 54.6663 54.6714 55.4486 1/10 43.7002 44.5024 44.3598 44.8332 1/12 28.9543 29.1568 29.0006 29.0220 1/13 28.8554 29.0571 29.3684 29.5996 1/14 38.5578 38.4526 39.1232 39.4719 1/4 213.0554 214.1656 213.9675 215.3233 1/3 149.1062 152.4437 152.9997 153.1253 TABLE II. ATC WITH NORMAL TOPOLOGY IEEE 24-BUS SYSTEM Source/sink bus no ATC EP GWO PSO CSA 23/15 790.9801 794.8945 794.9189 797.3823 22/9 375.4146 375.5291 377.2215 377.5662 22/5 249.8510 249.0834 251.1657 252.8519 21/6 65.3891 65.5217 65.9981 65.9995 18/5 250.2302 251.4353 251.9639 252.8634 The analysis results show that the CSA algorithm is able to solve the nonlinear optimization problem of handling ATC of power transactions between sources and sinks with equality and inequality constraints in the deregulated power system considering both thermal and voltage limits, and the ability of the algorithm to converge. Fig. 4. Power flow branch of the IEEE 14-bus system without line outage Fig. 5. Bus voltage profile of the IEEE 14-bus system without line outage Fig. 6. Convergence characteristics of CSA compared to EP, GWO, and PSO for the IEEE 14 bus system without line outage TABLE III. ATC WITH LINE OUTAGE TOPOLOGY FOR THE IEEE 14- BUS SYSTEM Source/sink bus no ATC EP GWO PSO CSA 1/9 46.8778 48.7042 48.7277 50.0297 1/10 46.7321 49.9837 48.7654 50.8314 1/12 30.8796 34.1418 34.1167 34.1631 1/13 26.9986 32.4435 31.9989 33.8311 1/14 37.5423 38.2378 35.2742 38.6285 1/4 206.751 209.8131 207.324 210.365 1/3 148.903 150.778 150.228 151.770 Engineering, Technology & Applied Science Research Vol. 10, No. 1, 2020, 5340-5345 5344 www.etasr.com Duong et al.: Available Transfer Capability Determination for the Electricity Market using Cuckoo … Fig. 7. Convergence characteristics of CSA compared to EP, GWO, and PSO for the IEEE 24-bus system without line outage Fig. 8. Convergence characteristics of CSA compared to EP, GWO, and PSO for the IEEE 14-bus system with line outage TABLE IV. ATC WITH LINE OUTAGE TOPOLOGY FOR THE IEEE 24- BUS SYSTEM Source/sink bus no ATC EP GWO PSO CSA 23/15 781.342 793.135 794.381 795.014 22/9 372.625 371.950 372.768 376.399 22/5 227.914 226.261 226.823 227.259 21/6 49.9771 51.0006 50.5363 51.1782 18/5 228.763 228.724 227.561 229.852 Fig. 9. Convergence characteristics of CSA compared to EP, GWO, and PSO for the IEEE 24-bus system with line outage V. CONCLUSIONS Accurate ATC determination in order to ensure system security while serving power transactions is one of the most challenging tasks in the electricity market. This paper has presented an implementation of the Cuckoo Search Algorithm to solve the problem which is formulated as a nonlinear optimization problem with equality and inequality constraints for handling the ATC of power transactions between sources and sinks in a deregulated power system considering both thermal and voltage limits. The results for the two systems have proved that the proposed CSA has remarkable robustness in maximizing the ATC. In all cases, the available transfer capability obtained by using CSA is much higher than that of EP, GWO, and PSO. Thus, CSA is one of the most effective methods for determining ATC in an electric power system. REFERENCES [1] M. R. Salehizadeh, M. A. Koohbijari, H. Nouri, A. Tascikaraoglu, O. Erdinc, J. P. S. Catalao, “Bi-objective optimization model for optimal placement of thyristor-controlled series compensator devices”, Energies, Vol. 12, No. 13, Article ID 2601, 2019 [2] M. R. Salehizadeh, A. Rahimi-Kian, K. Hausken, “A leader–follower game on congestion management in power systems”, in: Game theoretic analysis of congestion, safety and security, pp. 81-112, Springer, 2015 [3] M. R. Salehizadeh, A. R. Rahimi-Kian, M. Oloomi-Buygi, “Security- based multi-objective congestion management for emission reduction in power system”, International Journal of Electrical Power & Energy Systems, Vol. 65, No. 2, pp. 124-135, 2015 [4] M. Oloomi-Buygi, M. R. Salehizadeh, “Toward fairness in transmission loss allocation”, 2007 Australasian Universities Power Engineering Conference, Perth, Australia, December 9-12, 2007 [5] Y. Ou, C. Singh, “Assessment of available transfer capability and margins”, IEEE Transactions on Power Systems, Vol. 17, No. 2, pp. 463-468, 2002 [6] North American Electric Reliability Council (NERC), Available transfer capability definitions and determination, NERC, 1996 [7] P. Venkatesh, R. Gnanadass, N. P. Padhy, “Available transfer capability determination using power transfer distribution factors”, International Journal of Emerging Electric Power Systems, Vol. 1, No. 2, Article ID 1009, 2004 [8] H. Farahmand, M. Rashidi-Nejad, M. Fotuhi-Firoozabad, “Implementation of FACTS device for ATC enhancement using RPF technique”, Large Engineering Systems Conference on Power Engineering, Halifax, Canada, July 28-30, 2004 [9] Z. Chen, M. Zhou, G. Li, “ATC determination for the AC/DC transmission systems using modified CPF method”, International Conference on Critical Infrastructure, Beijing, China, September 20-22, 2010 [10] T. K. Hahn, M. K. Kim, D. Hur, J. K. Park, Y. T Yoon, “Evaluation of available transfer capability using fuzzy multi-objective contingency- constrained optimal power flow”, Electric Power Systems Research, Vol. 78, No. 5, pp. 873-882, 2008 [11] M. Rashidinejad, H. Farahmand, M. F. Firuzabad, A. A. Gharaveisi, “ATC enhancement using TCSC via artificial intelligent techniques”, Electric Power Systems Research, Vol. 78, No. 1, pp. 11-20, 2008 [12] D. T. Long, T. T. Nguyen, N. A. Nguyen, L. A. T. Nguyen, “An effective method for maximizing social welfare in electricity market via optimal TCSC installation”, Engineering, Technology & Applied Science Research, Vol. 9, No. 6, pp. 4946-4955, 2019 [13] V. H. Nguyen, H. Nguyen, M. T. Cao, K. H. Le, “Performance comparison between PSO and GA in improving dynamic voltage stability in ANFIS controllers for STATCOM”, Engineering, Technology & Applied Science Research, Vol. 9, No. 6, pp. 4863-4869, 2019 [14] L. T. Duong, T. T. Nguyen, “Network reconfiguration for an electric distribution system with distributed generators based on symbiotic Engineering, Technology & Applied Science Research Vol. 10, No. 1, 2020, 5340-5345 5345 www.etasr.com Duong et al.: Available Transfer Capability Determination for the Electricity Market using Cuckoo … organisms search”, Engineering, Technology & Applied Science Research, Vol. 9, No. 6, pp. 4925-4932, 2019 [15] T. Nireekshana, G. K. Rao, S. S. N. Raju, “Enhancement of ATC with FACTS devices using real-code genetic algorithm”, Electrical Power and Energy Systems. Vol. 43, No. 1, pp. 1276–1284, 2012 [16] R. M. Idris, A. Kharuddin, M. Mustafa, “Available transfer capability determination using bees algorithm”, 20 th Australasian Universities Power Engineering Conference, Christchurch, New Zealand, December 5-8, 2010 [17] H. Su, Y. Qi, X. Song, “The Available Transfer Capability based on a chaos cloud particle swarm algorithm”, 9 th International Conference on Natural Computation, Shenyang, China, July 23-25, 2013 [18] M. M. Othman, A. Mohamed, A. Hussain, “Available transfer capability assessment using evolutionary programming based capacity benefit margin”, International Journal of Electrical Power & Energy Systems, Vol. 28, No. 3, pp. 166-176, 2006 [19] D. S. Ivan, “Evolutionary algorithm for avaluating Available Transfer Capability”, Journal of Electrical Engineering, Vol. 64, No. 5, pp. 291- 297, 2013 [20] X. S. Yang, S. Deb, “Cuckoo search via Lévy flights”, 2009 World Congress on Nature & Biologically Inspired Computing, Coimbatore, India, December 9-11, 2009 [21] M. Shehab, A. T. Khader, M. A. A. Betar, “A survey on applications and variants of the cuckoo search algorithm”, Applied Soft Computing, Vol. 61, No. 12, pp. 1041-1059, 2017 [22] T. Kang, J. Yao, T. L. Duong, S. Yang, X. Zhu, “A hybrid approach for power system security enhancement via optimal installation of Flexible AC Transmission System (FACTS) Devices”, Energies, Vol. 10, No. 9, Article ID 1305, 2017 [23] http://www.pserc.cornell.edu//matpower (accessed on 7 June 2016)