id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
fbem-21451	Zhang, Xue	Optimization of Production Line Balance Based on The IE Method	2024	5	.pdf	application/pdf	2617	85	42	This paper adopts the industrial engineering analysis method to investigate and analyze the production site, and finds that there are problems of insufficient productivity and production line imbalance, which are analyzed as follows: (1) Insufficient productivity. Production process schedule before optimization Work process Observation time (s) Relaxation rate Standard time (s)	cache/fbem-21451.pdf	txt/fbem-21451.txt
