Frontiers in Business, Economics and Management ISSN: 2766-824X | Vol. 13, No. 3, 2024 333 Project Investment Decision Under Uncertain Information Mengying Xiao1, * 1 Department of Business, Hunan University of Science and Technology, Xiangtan, Hunan 411201, PR China * Corresponding author: Mengying Xiao (Email: mengyingxiao6@gmail.com) Abstract: With the change of environment and market, the current investment project decision is facing a more complex environment, the competition of enterprises intensifies, the decision complexity increases, and the demand for scientific decision is increasing. The advantage of multi-attribute decision making in investment project decision is increasingly prominent. This paper studies the application of multi-attribute decision making under triangular fuzzy uncertainty information in investment decision making. Considering the decision makers' risk aversion and preference attitude in multi-stage decision making process, a dynamic reference point setting method based on stage development characteristics is proposed. Considering that the attribute value and attribute value will produce compensation in the decision-making process, the attribute value difference formula is constructed to reduce the decision-making bias, and on this basis, an improved TODIM method is proposed. The triangular fuzzy number uncertainty information is introduced to evaluate the attributes of each scheme in each decision stage, and the information is aggregated by the aggregation operator. Combining the dynamic multi-attribute decision model, the practical problem is solved. The practicability and feasibility of this method are demonstrated by the example analysis and method comparison. Keywords: Dynamic reference point, TODIM, Triangular fuzzy number, Project investment decision. 1. Introduction In today's constantly developing global economic environment, we are faced with complex and changeable market conditions and uncertainties. Project investment decision is a crucial part of enterprise strategic management, but because of information asymmetry and uncertainty, project investment decision is faced with great challenges. In this context, uncertain information and prospect theory has become one of the important theories to explain people's psychological behavior when facing uncertain decisions. In 1965, Zadeh[1] introduced fuzzy sets into the field of decision making, combining fuzziness with mathematics and promoting the development of decision theory. In the actual decision-making process, the complexity of the decision- making environment, the uncertainty of information itself and people's subjective cognition lead to the uncertainty of the decision maker in the decision-making process, and the generation of fuzzy set can solve the problem of fuzzy uncertainty. In 2009,Eddie et al. [2] introduced the fuzzy logic system into the evaluation of the real estate market, providing a systematic theoretical basis for the investment decision of real estate projects, and then helping the investment decision makers to better solve the difficulties in the investment decision of real estate projects. In 2011,William C. Waheato et al. [3] proposed the time series method to effectively quantify the risks in the real estate market, which is widely forward-looking. In 2013, based on selection experiments,Marmolejo et al. [4] combined commercial factors and social and political factors in the real estate market, and adopted the traditional polynomial regression model to comprehensively evaluate each decision attribute of the real estate project, and then selected the best real estate project. Based on the fuzziness of traditional real option values, Liu Pengyang [5] built a fuzzy real option pricing model for large- scale real estate projects with the idea of fuzzy mathematics, and verified that the real option method is a relatively scientific and reasonable real estate investment method through examples. Wang Junwu [6] et al. built a hierarchical structure model of real estate project investment decision by conducting in-depth analysis of many influencing factors that affect real estate project investment decision, classifying them and using AHP method. Jia Yuanhui [7] believes that there are many factors affecting wind power decision making. He proposes to make investment decision on wind power projects from the perspective of risk, and establishes a multi-attribute decision model based on the four major risks of economy, technology, policy and environment, aiming to realize project decision making through risk control. Liu Min [8] pointed out that wind power projects are an effective way to control CO2 emissions, calculated the impact of CO2 trading mechanism on wind power project decision-making, and considered the uncertainty of CDM trading price and the flexibility of delaying investment in the investment decision model. Through the above literature, it is found that with the complexity of the investment environment, domestic and foreign scholars no longer only study from a single economic perspective, but from the perspective of national policies, social preferences and green mechanisms, research on wind power project investment is gradually increasing, and many scholars also consider uncertain factors in the research of investment decision. 2. Theoretical Knowledge 2.1. Triangular fuzzy number Definition 1. [9] if ๐‘Ž ๐‘Ž , ๐‘Ž , ๐‘Ž , where 0 ๐‘Ž ๐‘Ž ๐‘Ž 1,Angular fuzzy number๐‘Ž, whose characteristic function (membership function) can be expressed as 334 ๐œ‡ โŽฉ โŽจ โŽง , ๐‘Ž ๐‘ฅ ๐‘Ž , , ๐‘Ž ๐‘ฅ ๐‘Ž , 0, ๐‘œ๐‘กโ„Ž๐‘’๐‘Ÿ๐‘ . 1 Where ๐‘Ž and ๐‘Ž are the lower and upper bounds of ๐‘Ž, respectively, and ๐‘Ž is the median of ๐‘Ž. Definition 2. [10] triangle fuzzy number ๐‘Ž ๐‘Ž , ๐‘Ž , ๐‘Ž and ๐‘ ๐‘ , ๐‘ , ๐‘ the distance between the d (a, b) can be defined as follows: ๐‘‘ ๐‘Ž, ๐‘ 1 3 ๐‘Ž ๐‘ 2 ๐‘Ž ๐‘ 2 ๐‘Ž ๐‘ 2 2 Where 0โ‰คฮปโ‰ค1, the risk situation pursued by the decision maker determines the choice of ฮป value. When ฮป>0.5, the decision maker is taking a risk. The decision maker does not have a great position when ฮป=0.5; A ฮป<0.5 indicates that the decision maker is cautious. In general ฮป=0.5. 2.2. Multi-attribute decision method TODIM TODIM (Multi-objective decision making) is a multi- objective decision making method proposed by Brazilian scholars J. Figueira, S. Greco and M. Ehrgott in 2005. TODIM method is a combination of judgment matrix and ranking technology, aiming to solve the multi-objective decision-making problem, and by introducing cognitive preferences and descriptive information into the decision- making process, the decision is more in line with the subjective cognition of decision makers. On the basis of the prospect theory,TODIM method is based on pairwise comparison of schemes and calculates the dominance of each scheme under another scheme under each attribute to sort. The specific decision-making steps are as follows: Let ๐ด ๐ด , โ€ฆ , ๐ด is the set of m alternatives, ๐ถ ๐ถ , โ€ฆ , ๐ถ is the set of n attributes, ๐‘ฅ is the evaluation value of scheme ๐ด under attribute๐ถ , ๐‘Š ๐‘ค , โ€ฆ , ๐‘ค is the attribute weight vector with 0 ๐‘ค 1andโˆ‘ ๐‘ค 1. Step 1 to build decision matrix, and the decision matrix are normalized processing; ๐‘‹ ๐‘ฅ ๐‘ฅ โ€ฆ โ€ฆ ๐‘ฅ ๐‘ฅ โ‹ฎ โ‹ฑ โ‹ฎ ๐‘ฅ โ‹ฏ ๐‘ฅ Step 2 of relative attributes๐ถ attribute๐ถ and standardized weights, ๐‘ค , among them, the ๐‘ค is the reference weight, ๐‘ค max ๐‘ค , ๐‘—, ๐‘Ÿ 1,2, โ€ฆ , ๐‘›; Step 3 to calculate the properties under๐ถ , plan ๐ด and ๐ด of relative superiority degree โˆ… ๐ด , ๐ด , calculated as follows: โˆ… ๐ด , ๐ด โŽฉ โŽช โŽจ โŽช โŽง ๐‘ค ๐‘ฅ ๐‘ฅ โˆ‘ ๐‘ค , ๐‘ฅ ๐‘ฅ 1 ๐œƒ ๐‘ค ๐‘ฅ ๐‘ฅ โˆ‘ ๐‘ค , ๐‘ฅ ๐‘ฅ Among them, theโˆ… ๐ด , ๐ด properties under C solution๐ด relative to the scheme ๐ด of dominance, ๐‘— 1,2, โ€ฆ , ๐‘›; ๐‘–, ๐‘˜ 1,2, โ€ฆ , ๐‘š ; ๐‘ค is the weight of the reference attribute, ๐‘™ 1,2, โ€ฆ , ๐‘›; ๐œƒ is the loss decay coefficient, ๐œƒ 0; Step 4 calculating global dominance factor ๐œ‰ ๐ด โˆ‘ โˆ‘ โˆ… ๐ด , ๐ด ; Step 5 Sort based on the global preponsibility ๐œ‰ ๐ด . The greater the๐œ‰ ๐ด value, the better the ๐ด solution is. 3. Model Construction 3.1. Multi-attribute decision model of TODIM method The basic principle of TODIM involves goal setting, scheme comparison and consideration of uncertainty factors. The introduction of dynamic reference points makes the model more close to the psychological and risk attitude of actual decision makers. The concept of prospect theory is considered to have good applicability in project investment because it can capture the decision maker's dynamic assessment of benefits and risks at different points in time. However, multi-attribute decision making still faces a series of challenges in project investment. These challenges include the complexity of the interrelationships among attributes, the existence of information uncertainty, and individual differences in decision makers' subjective preferences. TODIM method can effectively overcome these challenges and improve the accuracy and reliability of investment decisions. In this section, after improving TODIM, a TODIM multi- attribute group decision-making model based on the dynamic reference point of prospect theory will be established and applied to project investment decision-making. The specific steps are as follows: Assume a dynamic multi-stage ๐‘‡ ๐œŽ 1,2, โ€ฆ , ๐œ under multi-attribute decision problem, where ๐ด ๐ด , โ€ฆ , ๐ด is the set of m alternatives ๐ถ ๐ถ , โ€ฆ , ๐ถ is a set of n attributes, ๐ธ ๐ธ , โ€ฆ , ๐ธ is a group of decision experts. At stage T_ฯƒ, decision expert ๐ธ ๐‘˜ 1,2, โ€ฆ , ๐‘ก for scheme ๐ด ๐‘– 1,2, โ€ฆ , ๐‘š in the attribute ๐‘ ๐‘— 1,2, โ€ฆ , ๐‘› .The evaluation information under,n) can be represented by the decision matrix ๐‘‹ ๐‘ฅ โˆ— as follows: ๐‘‹ โŽ โŽ› ๐‘ฅ ๐‘ฅ โ‹ฏ โ‹ฏ ๐‘ฅ ๐‘ฅ โ‹ฎ โ‹ฑ โ‹ฎ ๐‘ฅ โ‹ฏ ๐‘ฅ โŽ  โŽž Step 1 Under stage ๐‘‡ , the expert's weight vector is ๐œ” ๐œ” , ๐œ” , โ€ฆ , ๐œ” , , with the number of uncertain fuzzy aggregation operator to aggregate each expert decision matrix, aggregate after each stage of matrix ๐‘‹ โˆ— ๐œ” ๐‘‹ โจ๐œ” ๐‘‹ โจ โ€ฆ โจ๐œ” ๐‘‹ ; Step 2 calculate attribute ๐ถ and relative attributes ๐ถ standardized weights ๐‘ค , among them, the๐‘ค is the reference weight, ๐‘ค max ๐‘ค , ๐‘—, ๐‘Ÿ 1,2, โ€ฆ , ๐‘›; Step 3 to calculate the properties๐ถ , scheme๐ด and scheme ๐ด the relative dominance โˆ… ๐ด , ๐ด , calculated as follows: โˆ… ๐ด , ๐ด โŽฉ โŽช โŽจ โŽช โŽง ๐‘ค ๐‘ฅ ๐‘ฅ โˆ‘ ๐‘ค , ๐‘ฅ ๐‘ฅ 1 ๐œƒ ๐‘ค ๐‘ฅ ๐‘ฅ โˆ‘ ๐‘ค , ๐‘ฅ ๐‘ฅ 335 Among them, the โˆ… ๐ด , ๐ด under the stage ๐‘‡ properties under C solution ๐ด relative to the scheme๐ด of dominance, ๐‘— 1,2, โ€ฆ , ๐‘›; ๐‘–, ๐‘˜ 1,2, โ€ฆ , ๐‘š ; ๐‘ค is the weight of the reference attribute, ๐‘™ 1,2, โ€ฆ , ๐‘›; ๐œƒ is the loss decay coefficient,ฮธ>0; Step4 Construct comprehensive dominance degree ๐›ฟ ๐ด โˆ‘ โˆ‘ โˆ… ๐ด , ๐ด , ๐‘š๐‘Ž๐‘ฅโˆ… ๐ด , ๐ด ๐‘š๐‘–๐‘›โˆ… ๐ด , ๐ด ; Combined with TOPSIS thought, to find the ideal solution to the and non-ideal solution of the๐›ฟ ๐‘š๐‘–๐‘› โˆ‘ โˆ‘ โˆ… ๐ด , ๐ด , max ๐‘š๐‘Ž๐‘ฅโˆ… ๐ด , ๐ด ๐‘š๐‘–๐‘›โˆ… ๐ด , ๐ด ; Ideal solution to different schemes are calculated distance ๐ท ๐›ฟ , ๐›ฟ , distance non-ideal solution ๐ท ๐›ฟ , ๐›ฟ ; Step 5 to calculate comprehensive score of each alternative, ๐ถ ; Step 6 In the stage ๐‘‡ , the optimal expected level of each scheme under the same attribute can be obtained from ๐ถ . The dynamic expectation level programming model is expressed as: ๐ถ ๐‘š๐‘Ž๐‘ฅ๐ถ ๐‘ . ๐‘ก. โŽฉ โŽช โŽจ โŽช โŽง ๐ถ ๐ถ โˆ— 0 ๐œ” 1, ๐œ” 1, Step 7 Under stage ๐‘‡ , the value function of the solution is defined as: ๐‘ฃ โˆ†๐ถ โˆ†๐ถ , โˆ†๐ถ 0 ๐œƒ โˆ†๐ถ , โˆ†๐ถ 0 As โˆ†Cฯƒ Cฯƒ Cโˆ—ฯƒ(Cโˆ—ฯƒ as a reference point), theta risk preference, 0 ฮฑใ€ฮฒ 1. Step 8 Sort scheme ๐‘ฃ โˆ†๐ถ . The larger the value, the better. Step 9 In phase ๐‘‡ , ๐ถ โˆ— can obtain the optimal expected level of each scheme with the same attribute. The dynamic expectation level programming model is expressed as: ๐ถ ๐‘š๐‘Ž๐‘ฅ๐ถ ๐‘ . ๐‘ก. โŽฉ โŽช โŽจ โŽช โŽง ๐ถ ๐ถ โˆ— ๐ถ โˆ— 0 ๐œ” 1, ๐œ” 1, To solve the programming model, if there is a feasible solution, then directly use the solution to proceed to the next step; If there is no feasible solution, the optimal attribute weight and optimal expectation level of the previous stage are directly used to carry out the next step. Repeat the previous steps until the final stage. 4. Case Analysis 4.1. Instance Background Project investment decision is a key part of the successful development of an enterprise, which is directly related to the company's future profitability and market competitiveness. In the current context of fierce competition and ever-changing market environment, precise and prudent investment decisions are particularly important. First, an in-depth analysis of the project context, including market demand, competitive landscape, technology trends and other factors, helps to fully understand the potential risks and opportunities of the project. In this process, information gathering, risk management and market forecasting capabilities are particularly critical. In summary, scientific and reasonable project investment decisions can not only effectively promote the innovation and development of enterprises, but also give enterprises more powerful competitiveness in the complex and changeable market. At present, a venture capital company intends to make investment decisions on 4 alternative enterprises (schemes) ๐ด ๐‘– 1,2,3,4 . Through the analysis of enterprise development, three evaluation attributes are selected, namely, economic benefit ๐‘ , social benefit ๐‘ and environmental pollution degree ๐‘ . The decision makers now evaluate the attributes of each enterprise in three different segments (the evaluation results are shown in Table 4.1) in order to determine the best investment plan. At the same time the decision-making time under the weight of each attribute vector respectively ๐‘ค 0.4,0.4,0.2 , ๐‘ค 0.4,0.35,0.25 , ๐‘ค 0.4,0.3,0.3 . Table 4.1 Triangular fuzzy number evaluation information in each stage ๐‘‡ ๐ด ๐‘ ๐‘ ๐‘ ๐ด [0.60,0.70,0.80] [0.80,0.85,0.90] [0.35,0.40,0.50] ๐‘‡ ๐ด [0.85,0.90,0.95] [0.70,0.75,0.80] [0.40,0.45,0.50] ๐ด [0.75,0.80,0.90] [0.80,0.85,0.95] [0.30,0.40,0.45] ๐ด [0.80,0.85,0.90] [0.70,0.75,0.85] [0.45,0.50,0.65] ๐ด [0.80,0.85,0.90] [0.85,0.90,0.95] [0.30,0.35,0.40] ๐‘‡ ๐ด [0.85,0.90,0.95] [0.75,0.80,0.85] [0.35,0.40,0.45] ๐ด [0.75,0.80,0.85] [0.65,0.70,0.80] [0.30,0.40,0.45] ๐ด [0.85,0.90,0.95] [0.80,0.90,0.95] [0.55,0.60,0.65] ๐ด [0.85,0.90,0.95] [0.80,0.85,0.95] [0.30,0.35,0.40] ๐‘‡ ๐ด [0.80,0.85,0.90] [0.70,0.75,1.00] [0.25,0.30,0.40] ๐ด [0.85,0.90,0.95] [0.80,0.85,0.85] [0.40,0.45,0.50] ๐ด [0.80,0.85,0.95] [0.85,0.90,0.95] [0.35,0.40,0.50] The manuscript should include a conclusion. In this section, summarize what was described in your paper. Future directions may also be included in this section. Authors are strongly encouraged not to reference multiple figures or tables 336 in the conclusion; these should be referenced in the body of the paper. 4.2. Calculation process The specific arithmetic steps of TODIM method based on fuzzy information of triangular fuzzy numbers in this section are as follows: The evaluation information of the above three stages is integrated and processed to obtain the decision matrix, as shown in the following table: Table 4.2 Decision matrix of each stage ๐‘‡ ๐ด ๐‘ ๐‘ ๐‘ ๐ด [0.60,0.70,0.80] [0.80,0.85,0.90] [0.35,0.40,0.50] ๐‘‡ ๐ด [0.85,0.90,0.95] [0.70,0.75,0.80] [0.40,0.45,0.50] ๐ด [0.75,0.80,0.90] [0.80,0.85,0.95] [0.30,0.40,0.45] ๐ด [0.80,0.85,0.90] [0.70,0.75,0.85] [0.45,0.50,0.65] ๐ด [0.80,0.85,0.90] [0.85,0.90,0.95] [0.30,0.35,0.40] ๐‘‡ ๐ด [0.85,0.90,0.95] [0.75,0.80,0.85] [0.35,0.40,0.45] ๐ด [0.75,0.80,0.85] [0.65,0.70,0.80] [0.30,0.40,0.45] ๐ด [0.85,0.90,0.95] [0.80,0.90,0.95] [0.55,0.60,0.65] ๐ด [0.85,0.90,0.95] [0.80,0.85,0.95] [0.30,0.35,0.40] ๐‘‡ ๐ด [0.80,0.85,0.90] [0.70,0.75,1.00] [0.25,0.30,0.40] ๐ด [0.85,0.90,0.95] [0.80,0.85,0.85] [0.40,0.45,0.50] ๐ด [0.80,0.85,0.95] [0.85,0.90,0.95] [0.35,0.40,0.50] The results obtained by calculating each step are as follows Table 4.3 Decision-making results of each stage ๐‘‡ ๐ด Expected value reference poin value function ๐ด 0.127 0.065 0.086 ๐‘‡ ๐ด 1.268 0.934 0.381 ๐ด 1.176 0.597 0.618 ๐ด 1.000 0.344 0.689 ๐ด -0.504 0.876 -2.989 ๐‘‡ ๐ด 0 0.123 -0.356 ๐ด 0.140 0.099 0.060 ๐ด 1 1 0 ๐ด 0.127 1 -1.99 ๐‘‡ ๐ด 1.268 0 1.232 ๐ด 1.176 0.009 1.146 ๐ด 1.000 1 0 From the analysis of the final results, it can be seen that in the ๐‘‡ stage, the scheme order is ๐ด ๐ด ๐ด ๐ด ; In the ๐‘‡ stage, the sequence is ๐ด ๐ด ๐ด ๐ด . In the ๐‘‡ phase, the scheme is ordered as ๐ด ๐ด ๐ด ๐ด . If an optimal project investment needs to be selected in each stage, the corresponding optimal project in these three stages is: ๐ด โ†’ ๐ด โ†’ ๐ด . 5. Research Conclusions In today's rapidly developing economic environment, project investment decision is an important link in the development of enterprises. Therefore, when making project investment decisions, it is necessary to conduct adequate market research and risk assessment to ensure the effectiveness and sustainability of the investment. Multi- attribute decision making is an important part of modern decision science, system engineering and management science, and its theory and method are widely used in many fields such as economy, management, engineering, military and social life. However, both theoretical research and method application, especially in fuzzy multi-attribute decision theory and method research, are still not perfect, still facing new challenges, need further research. This paper mainly focuses on fuzzy information multi-attribute (group) decision-making problem. The main content of this paper considers the risk aversion and preference attitude of decision makers in the multi-stage decision-making process, establishes a multi-stage decision-making analysis framework based on prospect theory, and proposes a dynamic reference point setting method based on stage development characteristics. A multi-attribute decision making method based on improved TODIM method is proposed. The practicability and feasibility of the proposed method are demonstrated by example analysis and method comparison. To sum up, the investment decision model based on prospect theory under uncertain information proposed in this paper provides a new decision method for decision makers and has important significance in solving practical problems. Acknowledgment The author would like to take this opportunity to express his heartfelt thanks and gratitude to the master and reviewers for their valuable suggestions and suggestions for the improvement and perfection of this paper. References [1] Zadeh L A. Fuzzy sets[M]. Fuzzy sets, fuzzy logic, and fuzzy systems, 1996: 394-432. [2] Eddie Chi Man Hui, Otto Muk Fai Lau, Tony Kak Keung Lo. Deciphering real estate investment decisions throughfuzzy logic systems[J]. Property Management, 2009, 27(3):p.163- 177. [3] WC Wheaton, RG Torto , PS Sivitanides , JA Southard, E AL. Real estate risk: A forward-looking approach[J]. TortoWheaton Research,2011:1-35. [4] Marmolejoโ€Duarte, Carlos, Ruizโ€Lineros, Manuel. Using choiceโ€basedโ€experiments to support real estate designdecisions [J]. Journal of European Real Estate Research, 2013, 6(1):63-89. 337 [5] Liu Pengyang. Research on Investment Decision of large Real Estate Project based on Fuzzy Real option [D]. Xi 'an University of Architecture and Technology,2013. [6] Wang Junwu, Jiang Li, Zhang Lu. Research on real estate investment decision based on Analytic Hierarchy Process [J]. Journal of Wuhan University of Technology (Information and Management Engineering Edition),2004(05):185-188. [7] Jia Yuanhui, Tang Chunming, Bao Lirong. Discussion on multi-attribute decision Model of wind power project based on risk perspective [J]. Electronic Testing, 2013(7):221-222. (in Chinese) [8] Liu Min, Zhang Junan. The influence of CO2 trading mechanism on wind power investment decision [J]. Power Grid and Clean Energy, 2010, 26(8):45-49. [9] Zadeh L A. Fuzzy sets[M]. Fuzzy sets, fuzzy logic, and fuzzy systems, 1996: 394-432. [10] Xu Z, Yager R R. Some geometric aggregation operators based on intuitionistic fuzzy sets[J]. International journal of general systems, 2006, 35(4): 417-433. [11] Llamazares B. An analysis of the generalized TODIM method[J]. European Journal of Operational Research, 2018, 269(3): 1041-1049. [12] Alali F, Tolga A C. Portfolio allocation with the TODIM method[J]. Expert Systems with Applications, 2019, 124: 341- 348. [13] Tian X, Li W, Liu L, et al. Development of TODIM with different types of fuzzy sets: A state-of the-art survey[J]. Applied Soft Computing, 2021, 111: 107.