id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
iajs-1134	Fahad, S.A.	Month â€“ to â€“ Month Until N Years Prediction for Planning a Productive Firm	2017	13	.pdf	application/pdf	4077	219	81	Table:( 3-3-1)Decision Variables when II= 6 and v = 0.9 and the same thing for cost table and profit table while the following years would be as calendar years C1 = 340.0, C2 = 64.3, C3 = 0.20, C4 = 5.67, C5 = 51.2, C6 = 281.0, C7 = 0.0825, C8 = 320.0, C9 = C11 = C12 = 0 W0 = 81 men, I0 = 275 units, Pc = 100. N = 14 and Jmax = N + 1 to book area in the memory for the matrix to build up simultaneous linear equations according to equations (2.10) and (2.11) and applying the Gauss-Jordan method to get Wt, t = 1 to 14	cache/iajs-1134.pdf	txt/iajs-1134.txt
