id	author	title	date	pages	extension	mime	words	sentence	flesch	summary	cache	txt
iajs-553	Abdul-Razaq, T. S.; Fandi, F. Sh.	Minimizing total Completion Time and Maximum late Work Simultaneously	2017	11	.pdf	application/pdf	4463	249	79	This means that the late work for job i is given by vi= Notation and Basic Concepts: The following notation will be used in this paper: n = number of jobs. In this paper, the problem of scheduling jobs on one machine for a variety multicriteria are considered to minimize total completion time and maximum late work.	cache/iajs-553.pdf	txt/iajs-553.txt