The Illomata International Journal of Management Ilomata International Journal of Tax & Accounting P-ISSN: 2714-9838; E-ISSN: 2714-9846 Volume 4, Issue 2, April 2023 Page No. 208-220 208 | Ilomata International Journal of Tax & Accounting https://www.ilomata.org/index.php/ijtc Market Concentration in Construction Tenders in West Papua Bagas Johantri1, Rachma Aprilia2, Sopian3 123Politeknik Keuangan Negara STAN, Indonesia Correspondent: bagasjohantri@pknstan.ac.id Received : January 21, 2023 Accepted : April 6, 2023 Published : April 30, 2023 Citation: Johantri, B., Aprilia, R. Sopian. (2023). Market Concentration in Construction Tenders in West Papua. Ilomata International Journal of Tax and Accounting, 4(2),194-207. https://doi.org/10.52728/ijtc.v4i2.708 ABSTRACT: This study aims to determine the level of market concentration in construction work tenders in West Papua and to investigate the correlation between the market concentration index and the average participation in tenders, the number of work packages, and average tender savings. West Papua has privileges in procurement and has special autonomy funds for development. The study uses tender data from 2018-2022 and employs the Herfindahl-Hirschman Index (HHI) and Concentration Ratio 4 (CR4) to calculate market concentration. The results indicate that, based on HHI, the market concentration in the building construction and civil engineering subsectors is generally low, except for civil engineering in 2022. However, based on CR4, the market concentration in the building construction subsector is moderate, and in the civil engineering subsector, it is low, except for 2018. Moreover, there is a negative correlation between the number of packages and average participants, as well as between the number of packages and CR4 values. The findings of this study can be useful for construction providers to understand the competition in tenders and assist the government in developing competitive procurement strategies. Future research can investigate the economic benefits of local West Papua businesses when market concentration is low. Keywords: Concentration Ratio, Government Procurement, Herfindahl-Hirschman Index, Tender. This is an open access article under the CC-BY 4.0 license. INTRODUCTION Government procurement of goods and services (PBJ) is a potential market for businesses in Indonesia. According to the (LKPP, 2022), at least 1,052 T rupiahs of the national budget is spent on PBJ. Given this sizeable proportion, PBJ is regulated by presidential regulations and other derivative regulations, which are continuously adjusted to meet the government's needs and circumstances. However, for a market, rigid regulations can be a barrier to entry. The Presidential Regulation on PBJ is mandatory for government agencies, including local governments such as the West Papua Province. The Indonesian government provides Special Autonomy Funds (Dana Otonomi Khusus) to West Papua and other provinces with similar special https://www.ilomata.org/index.php/ijtc mailto:bagasjohantri@pknstan.ac.id https://doi.org/10.52728/ijtc.v4i2.708 Market Concentration in Construction Tenders in West Papua Johantri, Aprilia, and Sopian. 209 | Ilomata International Journal of Tax & Accounting https://www.ilomata.org/index.php/ijtc autonomy status. The government allocated IDR 12.8 trillion as the special autonomy fund for Papua and West Papua Provinces (Ardimansyah, 2022), which can be utilized to accelerate the economic development and welfare of the people in the autonomous region. One of the ways this is achieved is through PBJ. Regarding PBJ, the Indonesian government has introduced Presidential Regulation 17 of 2019 as a measure to expedite economic growth in Papua and West Papua. This regulation is aimed at regulating the procurement of goods and services in the two provinces. Among the provisions of the regulation is a concession granted to local Papuan entrepreneurs, allowing them to participate in the PBJ without compromising the quality of their work. This move is expected to promote the involvement of Papuan businesses in government procurement activities, and consequently stimulate the economic development of the region (Mansawan, 2021). The purpose of the Special Autonomy Fund and the specialization of PBJ regulations in West Papua may face obstacles. The results of the integrity assessment in a survey conducted by the Corruption Eradication Commission show that the integrity index in West Papua is below the national average (Wibowo et al., 2021). Moreover, in developing nations, (Williams-Elegbe, 2018) discovered that deviation in government procurement is primarily driven by weak regulations and law enforcement, insufficient accountability to the public, and limited public participation in reporting fraudulent activities to internal control mechanisms or law enforcement agencies. Referring to the Presidential Regulation, the purpose of PBJ is to increase the role of business actors and ensure value for money for the goods and services obtained (Presiden Republik Indonesia, 2021). Many barriers to doing business can weaken the competition (Diaby & Sylwester, 2015). To improve the role of businesses, the government's policy is to make it easier for them to participate in PBJ as procurement service providers, which is also expected to create employment opportunities and stimulate economic growth. With more businesses providing services, these objectives become more achievable. Value for money in PBJ can be assessed from the cost perspective. PBJ is expected to provide the best goods and services at the lowest possible cost without sacrificing quality or timeliness. In terms of cost, procurement service providers are expected to provide competitive bids, which ultimately result in savings for the national budget. Thus, competition is essential to create the fair price (McAfee & McMillan, 1987). In another study, competition reduced collusion (Ryvkin & Serra, 2020). One of the procurement methods that allows open competition is tender. Tender in government procurement is the selection of providers through an open announcement with the determination of the winner based on the bids submitted by participants (LKPP, 2021). Auction is an economic game that contains format and information (Watson, 2013). In this case, the format determines the rules on how to announce, submit bids, and determine the winner. Each participant will conduct an assessment of the qualifications they have, the value of the work, potential competitors, and the risks involved in the work before submitting a bid (Ballesteros-Pérez et al., 2016; Hanák et al., 2021; Kocher et al., 2015; McAfee & McMillan, 1987). When evaluating bids, the participant with the lowest price and the technical qualifications is selected as the winner so the bid price becomes important. https://www.ilomata.org/index.php/ijtc Market Concentration in Construction Tenders in West Papua Johantri, Aprilia, and Sopian. 210 | Ilomata International Journal of Tax & Accounting https://www.ilomata.org/index.php/ijtc In a cost accounting perspective, prices can be determined by adding the costs and the desired rate of return (Carter, 2006). Each participant has information that influences their assessment of the auction object. The value of the object surely differs among participants. According to (Vickrey, 1961) the optimal bid a provider can offer is the value they expect to receive from the project in the tender. (Podwol & Schneider, 2016) shows that there is nonstandard bidder behavior in auctions. In tender markets, providers who have a competitive advantage, whether it be in technical qualification or pricing, may come to dominate the market by consistently winning project bids. This is not a problem for the government as long as the advantage is gained through legitimate means such as efficiency and capacity. However, if the advantage is due to collusion with procurement actors, then it becomes a major issue that needs to be addressed to prevent unfair competition. Procurement of goods and services in Indonesia has been previously studied. From a governance perspective, the use of information technology through e-procurement is believed to have reduced the potential for collusion in PBJ implementation ((Huda et al., 2017)(Salman & Survanto, 2019); (Nani & Ali, 2020); (Wicaksono et al., 2017)). The use of IT can reduce face-to-face meetings between tender organizers and bidders, thereby reducing the risk of collusion between bidders and organizers. In addition to governance aspects,(Johantri et al., 2022) examines the relationship between contract prices in public procurement tenders and several other variables. (Johantri et al., 2022), which uses tender data from the Ministry of Finance, is corroborated by the findings of (Raharjo & Gultom, 2022), who uses data from all local governments. Both studies show that the more tender participants, the greater the government's cost savings. The number of participants can indicate that competition will affect prices. In an economy, companies that have the ability to establish prices above marginal cost hold an advantage over those that cannot. The presence of market power and its evaluation through market concentration as a measure of market power is a significant issue (Pavic et al., 2016). Previous research has been conducted on market concentration in public procurement. (Svoboda, 2016) examined market concentration in public procurement using the Herindahl-Hirschman Index (HHI) and Concentration Ratio of the top four companies (CR4). (Peleckis, 2022) studied the construction market, while (Berkovich et al., 2021) focused on the internet market, both using HHI to measure market concentration. The studies on market concentration of construction industry have been carriedout ((Kawai & Nakabayashi, 2022); (Škuflić et al., 2018); (Dinarjito, 2022); (Wang & Li, 2021)). However, market concentration in government procurement for construction tenders is still difficult to find. The aim of this study is to determine the level of market concentration in government procurement tenders in the construction sector in West Papua, and to investigate the correlation between market concentration and the average number of tender participants, number of tender packages, and average percentage of tender savings. The study found that there were differences in market structures in the construction subsector when using different measures. The findings of this study could be valuable for practitioners and policy-makers seeking to enhance the effectiveness and efficiency of tendering practices, particularly in the context of West Papua. https://www.ilomata.org/index.php/ijtc Market Concentration in Construction Tenders in West Papua Johantri, Aprilia, and Sopian. 211 | Ilomata International Journal of Tax & Accounting https://www.ilomata.org/index.php/ijtc METHOD This study employs construction tender data from the period of 2018 to September 2022, obtained from the government tender announcement website of West Papua Province, available at https://tender.Papuabaratprov.go.id/eproc4/lelang. The sample data were purposively selected based on data completeness, resulting in a sample size of 796 construction job packages. The tender population, and research samples are as shown in Table 1 below: Table 1. Population and Sampel Discriptions Package Registered tenders 1.679 The tender failed, and the data is incomplete 164 non-construction tenders 719 Sample 796 Once the data has been obtained, the next steps in the research process involve descriptive analysis, determination of market concentration, and correlation analysis. This study employs the Herfindahl-Hirschman Index (HHI) and Concentration Ratio 4 (CR4) to measure market concentration. HHI is considered more precise as it includes all business players in the calculation of market concentration, while CR4 only describes the strength of the top 4 providers (Pavic et al., 2016). However, the study uses CR4 to determine the level of concentration in the four dominant providers. HHI is calculated based on formula (Pavic et al., 2016): 𝐻𝐻𝐼 = ∑(𝑀𝑆𝑖 ) 2 𝑁 𝑖=1 The MSi represents the total contract value of packages won by a provider, with N being the number of providers. A HHI value below 100 indicates high competition, a value below 1,500 indicates an unconcentrated market, a value between 1,500 and 2,500 indicates moderate concentration, and a value above 2,500 indicates high concentration. The CR4 calculation is performed using the formula (Pavic et al., 2016): 𝐶𝑅4 = 𝐶1 + 𝐶2 + 𝐶3 + 𝐶4 CR4 represents the sum of the market share of the top four largest companies. Low concentration occurs when the CR4 value is up to 40%. Values between 40%-70% indicate moderate concentration, while values between 70%-100% indicate the presence of oligopoly to monopoly in the procurement of goods and services. Market concentration calculations are carried out for each fiscal year with reference to Ramadhani & Setiawan (2019), who stated that fiscal year has an influence on government budget absorption. Calculation was also conducted based on the construction subsector given that each subsector has https://www.ilomata.org/index.php/ijtc Market Concentration in Construction Tenders in West Papua Johantri, Aprilia, and Sopian. 212 | Ilomata International Journal of Tax & Accounting https://www.ilomata.org/index.php/ijtc different job characteristics and requires different provider requirements (LKPP, 2021). This study categorizes construction into building construction subsector (Building), civil engineering subsector (Civil), and other subsectors (Other). The next step is to calculate the correlation between market concentration and the average number of participants, the number of packages, and the percentage of savings. This study employed Spearman's rho analysis as the data was not normally distributed. In addition, due to data limitations, correlation analysis was not conducted for the other subsectors. RESULT AND DISCUSSION During 2018-2022, the majority of tenders for construction in West Papua are civil engineerings. There is a significant difference in the quantity of the number of tender packages between the subsectors. There are 631 tenders were Civil, 154 tenders were Building, and 11 were Other. Table 2 describes construction tenders by fiscal year. Table 2. Tender per Years Sub-sector 2018 2019 2020 2021 2022 Total Building Number of Package 51 40 25 24 14 154 Number of Participant 1.396 1.130 725 945 579 4775 Max Participant 67 85 65 65 113 113 Min of Participant 7 6 7 14 12 6 Average participant per package 27,37 28,25 29 39,38 41,36 31,00 Civil Number of Package 125 108 149 146 103 631 Number of Participant 3.148 1.928 3.202 3.791 1.645 13.714 Max Participant 79 85 81 86 48 86 Min of Participant 4 3 5 6 3 3 Average participant per package 25,18 17,85 21,49 25,97 15,97 21,73 Other Number of Package 8 3 11 Number of Participant 150 27 177 Max Participant 24 18 24 Min of Participant 11 4 4 Average participant per package 18,75 9 16,09 Overall Total Packages 184 151 174 170 117 796 Total Participant 4.694 3.085 3.927 4.736 2.224 18.666 Max Partisipan 79 85 81 86 113 113 Min Partisipan 4 3 5 6 3 3 Average participant per package 25,51 20,43 22,57 27,86 19,01 23,45 https://www.ilomata.org/index.php/ijtc Market Concentration in Construction Tenders in West Papua Johantri, Aprilia, and Sopian. 213 | Ilomata International Journal of Tax & Accounting https://www.ilomata.org/index.php/ijtc Based on Table 2, the number of participants in civil engineering tenders is greater than the number of participants in Building tenders. However, the average number of participants per Civil tender is smaller than the average number of participants per Building tender. The competition to win a building construction contract is tighter compared to civil engineering contracts, and this condition occurs throughout the observation period (2018-2022). On average, each building construction project is followed by 31 participants, while each civil engineering package is followed by 22 participants. The competition to win tenders is looser for other subsector as the average number of participants is only 16 per project. This data needs to be carefully considered by providers who want to participate in procurement in West Papua. Referring to the study by (Raharjo & Gultom, 2022), the average number of participants in tenders in West Papua is higher than the average number of bidders in tenders in Java and Bali for 2020-2021. However, according to (Johantri et al., 2022), the average number of bidders in West Papua is lower than the average number of bidders in the Ministry of Finance for 2019-2021. From the perspective of the value for money objective, Table 3 shows the average percentage of budget savings from the tender process. Tender savings are calculated as the difference between the Self-Estimate Price (Harga Perkiraan Sendiri or HPS) and the contract value. The savings percentage represents the percentage of this difference from the HPS value. Tabel 3. Average percentage of tender saving Sub- sector 2018 2019 2020 2021 2022 Min Max Average Building 6,99% 3,80% 5,36% 6,49% 3,95% 3,80% 6,99% 5,54% Other 2,98% 1,39% 1,39% 2,98% 2,55% Civil 4,51% 3,37% 3,50% 3,70% 3,79% 3,37% 4,51% 3,77% Average 5,13% 3,45% 3,77% 4,10% 3,81% 4,10% The average value from Table 3 over the course of 5 years was only 4.1%, with the highest average in 2018 and the lowest in 2019. When observed by sub-sector, the highest savings were achieved in 2018 for Building, while the lowest savings were achieved in 2019 for Other. The percentage of savings from construction tendering can be considered relatively low compared to the Ministry of Finance, which shows that the difference between contract values and tender ceiling prices ranges between 8% to 10% (Johantri & Aprilia, 2021). The data indicates that construction job tenders in West Papua utilize budget more optimally. Optimizing budget utilization is directly related to the goal of economic equality in government expenditure. However, the value for money of the work outcomes still needs to be further investigated. This study uses the LKPP regulations to divide the construction subsector. Although (Rajala et al., 2022) concludes that there is a difference between profits from renovation works and those from new building construction, research data does not allow for an accurate division. The concentration index of each sub-sector is as Table 4. https://www.ilomata.org/index.php/ijtc Market Concentration in Construction Tenders in West Papua Johantri, Aprilia, and Sopian. 214 | Ilomata International Journal of Tax & Accounting https://www.ilomata.org/index.php/ijtc Table 4 shows the results of HHI and CR4 based on sub-sector. Tabel 4. HHI and CR4 per sub-sector HHI CR4 Building Civil Other Building Civil Other 2018 633,86 289,51 1.426,18 39,01 23,79 66,95 2019 1.381,17 229,21 7.527,63 51,20 18,76 100,00 2020 1.462,36 215,55 54,74 17,30 2021 815,31 202,98 46,39 18,13 2022 1.673,11 276,51 70,39 24,33 Referring to (Pavic et al., 2016), based on the calculations in Table 4, the HHI of the sub-sector for building construction indicates low market concentration, except for 2022 where it shows moderate concentration. The result is in line with (Dinarjito, 2022). However, if market concentration is measured using CR4, there is moderate concentration in 2019-2022. This may be due to the presence of one or two large companies that have a significant market share, thus affecting the overall market concentration. In this case, although the HHI indicates low market concentration, the CR4 indicates moderate concentration because the market share of the top four companies is still quite significant. Therefore, the results of the HHI and CR4 measurements can provide different information about market concentration in an industry. The high market concentration can be interpreted as a situation where a few providers are capable of winning many contracts. To win tenders, providers usually need to offer lower prices in addition to meeting all technical requirements. In this context, competitive advantages can differentiate one provider from another. Since 2020, the Ministry of Public Works has issued regulations on what can be required in tenders. Essentially, these regulations align with the spirit of the presidential regulation on procurement of goods and services, in which technical requirements are simplified to facilitate providers in participating in tenders. These regulations reduce entry barriers for providers who previously found it difficult to enter the PBJ tender market. However, given the high concentration that occurred in 2022, further research could delve deeper into how concentration can be moderated despite the decreasing barriers to entry for providers. In Table 2, the number of contracts awarded for each sub-sector of work varies by year. When the market share being contested is low, concentration may occur because winning a few contracts is enough to dominate the market. On the other hand, a larger number of participants will result in greater competition, and concentration may decrease when the number of participants increases. A larger number of participants, budget savings will be greater (Johantri et al., 2022; Raharjo & Gultom, 2022). To show the correlation between these factors, the correlation matrix is as follows: https://www.ilomata.org/index.php/ijtc Market Concentration in Construction Tenders in West Papua Johantri, Aprilia, and Sopian. 215 | Ilomata International Journal of Tax & Accounting https://www.ilomata.org/index.php/ijtc Table 5. Correlation of HHI in Building Construction subsector HHI Building CR4 Building Participan t Building Package Building Saving Buildin g Spearma n's rho HHI Building Correlation Coefficient 1,000 1,000** ,700 -,700 -,700 Sig. (2-tailed) . . ,188 ,188 ,188 N 5 5 5 5 5 CR4 Building Correlation Coefficient 1,000** 1,000 ,700 -,700 -,700 Sig. (2-tailed) . . ,188 ,188 ,188 N 5 5 5 5 5 Participa nt Building Correlation Coefficient ,700 ,700 1,000 -1,000** -,300 Sig. (2-tailed) ,188 ,188 . . ,624 N 5 5 5 5 5 Package Building Correlation Coefficient -,700 -,700 -1,000** 1,000 ,300 Sig. (2-tailed) ,188 ,188 . . ,624 N 5 5 5 5 5 Saving Building Correlation Coefficient -,700 -,700 -,300 ,300 1,000 Sig. (2-tailed) ,188 ,188 ,624 ,624 . N 5 5 5 5 5 **. Correlation is significant at the 0.01 level (2-tailed). Based on Spearman's rho correlation calculation in the building construction subsector, the HHI is not significantly correlated with the number of tender packages, average tender participants, or average savings percentage. Thus, even though the studies by (Raharjo & Gultom, 2022) as well as (Johantri et al., 2022) show that the number of bidders has a negative effect on contract prices, the decrease in value is not significantly correlated with market concentration. There are several possible reasons why the decrease in value due to the presence of more bidders may not be significantly correlated with market concentration. While market concentration is an important factor in determining pricing power, it is not the only factor that affects the competitiveness of the bidding process. Other factors such as the level of competition, the quality of the bids, and the level of demand for the project may also have a greater impact on the final contract price. Secondly, even if there are a few dominant firms in the market, if they do not have a significant market share, they may not be able to exert enough pricing power to affect the contract price. In such cases, the number of bidders may have a more significant impact on pricing than market concentration. The other possibility is the data used in this study is relatively limited, therefore future research is recommended to use more data to better explain the correlations. https://www.ilomata.org/index.php/ijtc Market Concentration in Construction Tenders in West Papua Johantri, Aprilia, and Sopian. 216 | Ilomata International Journal of Tax & Accounting https://www.ilomata.org/index.php/ijtc Based on Table 5, there is a significant correlation between the number of tender packages and the average number of participants, with a negative correlation coefficient of 0.9. The finding indicates that as the number of tender packages increases, the average number of participants decreases, and this relationship is statistically significant. The negative correlation coefficient of 0.9 suggests a strong negative relationship between these two variables. This means that there is a tendency for fewer bidders to participate in tenders when the number of tender packages is high. This finding could be used by policymakers and practitioners to develop strategies to increase the number of participants in tender processes, which may lead to increased competition and better value for money in public procurement. Table 6. Correlation of HHI in Civil Engineering subsector HHI Civil CR4 Civil Participan t Civil Packag e Civil Saving Civil Spearma n's rho HHI Civil Correlation Coefficient 1,000 ,800 -,400 -,600 ,600 Sig. (2-tailed) . ,104 ,505 ,285 ,285 N 5 5 5 5 5 CR4 Civil Correlation Coefficient ,800 1,000 -,500 -,900* ,600 Sig. (2-tailed) ,104 . ,391 ,037 ,285 N 5 5 5 5 5 Participa nt Civil Correlation Coefficient -,400 -,500 1,000 ,700 ,200 Sig. (2-tailed) ,505 ,391 . ,188 ,747 N 5 5 5 5 5 Package Civil Correlation Coefficient -,600 -,900* ,700 1,000 -,200 Sig. (2-tailed) ,285 ,037 ,188 . ,747 N 5 5 5 5 5 Saving Civil Correlation Coefficient ,600 ,600 ,200 -,200 1,000 Sig. (2-tailed) ,285 ,285 ,747 ,747 . N 5 5 5 5 5 *. Correlation is significant at the 0.05 level (2-tailed). Based on the correlation matrix in Table 6 for the civil engineering subsector, the results differ from those of the building construction subsector. Although both CR4 and HHI describe market concentration, CR4 is significantly correlated with the average number of participants, with a negative correlation coefficient of 0.9. A negative correlation coefficient indicates an inverse relationship between the two variables being studied. In this case, the significant negative correlation between CR4 and the average number of participants in the civil engineering subsector suggests that as the concentration of the market increases (as indicated by the CR4), the number https://www.ilomata.org/index.php/ijtc Market Concentration in Construction Tenders in West Papua Johantri, Aprilia, and Sopian. 217 | Ilomata International Journal of Tax & Accounting https://www.ilomata.org/index.php/ijtc of participants in tender packages decreases. This finding may suggest that a more concentrated market in the civil engineering subsector is associated with fewer participants in tender packages. This result is in line with (Svoboda, 2016). The reason why CR4 is significantly correlated with the average number of participants in the civil engineering subsector may be due to the characteristics of the industry. Additionally, a more concentrated market may result in barriers to entry for smaller companies, which can limit competition and decrease the number of participants in tender packages. Further research is needed to explore the underlying factors that contribute to this relationship between market concentration and the number of tender package participants in the civil engineering subsector. CONCLUSION Market concentration refers to the extent to which market share is concentrated. In the context of the objectives of government procurement, the division of a larger market share among many business actors brings the objectives of economic equality and increasing the role of business actors closer to achievement. Although procurement in West Papua still has risks, based on HHI, market concentration for the building construction and civil engineering sub-sectors is relatively low except for the building construction sub-sector in 2022. Based on the CR4 value, the market concentration for the building construction subsector is moderate while the market concentration for the civil engineering subsector is low. In the subsector of building construction, there is a significant and strong negative correlation between the number of tender packages and the average number of participants. Meanwhile, in the civil engineering subsector, there is a significant and strong correlation between the CR4 value and the number of tender packages, with a negative correlation direction. This suggests that the market concentration of the four dominant players decreases as the number of tender packages in the civil engineering subsector increases. The current study employs the names of business entities in calculating market concentration. Future research can utilize the names of business owners to gain a deeper understanding of market concentration in West Papua. Other approaches may also be used in future studies to determine whether indigenous West Papua business players benefit economically in government procurement when market concentration is low. REFERENCE Ardimansyah. (2022). Alokasi Dana Otsus & DTI TA 2021 dan TA.2022 per Kab/Kota. DJPK. Ballesteros-Pérez, P., Skitmore, M., Pellicer, E., & Gutiérrez-Bahamondes, J. H. (2016). Improving the estimation of probability of bidder participation in procurement auctions. International Journal of Project Management, 34(2), 158–172. https://doi.org/https://doi.org/10.1016/j.ijproman.2015.11.001 https://www.ilomata.org/index.php/ijtc Market Concentration in Construction Tenders in West Papua Johantri, Aprilia, and Sopian. 218 | Ilomata International Journal of Tax & Accounting https://www.ilomata.org/index.php/ijtc Berkovich, M. I., Ismailov, M. I., & Zhegalov, N. (2021). Internet Services Market: Assessment of the Level of Competition and Competitiveness of the Main Providers. Journal of Regional and International Competitiveness, 3, 57. https://doi.org/https://doi.org/10.52957/27821927_2021_3_57 Carter, W. K. (2006). Cost accounting (14th ed.). Thomson. Diaby, A., & Sylwester, K. (2015). Corruption and Market Competition: Evidence from Post- Communist Countries. World Development, 66, 487–499. https://doi.org/https://doi.org/10.1016/j.worlddev.2014.09.003 Dinarjito, A. (2022). Struktur Pasar Industri Konstruksi Di Indonesia Tahun 2018-2021. Jurnalku, 2(3), 358–363. https://doi.org/10.54957/jurnalku.v2i3.279 Hanák, T., Drozdová, A., & Marović, I. (2021). Bidding Strategy in Construction Public Procurement: A Contractor’s Perspective. Buildings, 11(2). https://doi.org/10.3390/buildings11020047 Huda, S. N., Setiani, N., Pulungan, R., & Winarko, E. (2017). Potential fraudulent behaviors in e- procurement implementation in Indonesia. IOP Conference Series: Materials Science and Engineering, 185(1), 12003. https://doi.org/10.1088/1757-899X/185/1/012003 Johantri, B., & Aprilia, R. (2021). Penawaran Harga Pekerjaan Konstruksi Pemerintah di Era Pandemi (Studi Empiris Pada Kementerian Keuangan). Jurnal Manajemen Keuangan Publik, 5(1), 66–80. https://doi.org/10.31092/jmkp.v5i1.1229 Johantri, B., Sopian, S., & Sukmono, R. (2022). Pengaruh Waktu Pemasukan Dokumen, Jumlah Partisipan, dan Tingkat Inflasi terhadap Persentase Hasil Tender pada Kementerian Keuangan. Strategic: Jurnal Pendidikan Manajemen Bisnis, 22(1). https://doi.org/10.17509/strategic.v22i1.45662 Kawai, K., & Nakabayashi, J. (2022). Detecting large-scale collusion in procurement auctions. Journal of Political Economy, 130(5), 1364–1411. https://doi.org/10.1086/718913 Kocher, M. G., Pahlke, J., & Trautmann, S. T. (2015). An experimental study of precautionary bidding. European Economic Review, 78, 27–38. https://doi.org/https://doi.org/10.1016/j.euroecorev.2015.04.009 LKPP. (2021). Peraturan LKPP Nomor 12 Tahun 2021 tentang Pedoman Pelaksanaan Pengadaan Barang/Jasa Pemerintah Melalui Penyedia. In Lembaga Kebijakan Pengadaan Barang/Jasa Pemerintah. LKPP. (2022). Overview Rencana Umum Pengadaan (RUP) Tahun Anggaran 2022. https://datastudio.google.com/u/1/reporting/4482ff4e-f62b-4454-98eb- 7ebae94e3401/page/IjAmC Mansawan, I. S. K. (2021). Efektivitas Implementasi Perpres No. 17 Tahun 2019 tentang Pengadaan Barang/Jasa Pemerintah dalam Mempercepat Pembangunan di Provinsi Papua Barat. McAfee, R. P., & McMillan, J. (1987). Auctions with entry. Economics Letters, 23(4), 343–347. Nani, D. A., & Ali, S. (2020). Determinants of Effective E-Procurement System: Empirical Evidence from Indonesian Local Governments. Jurnal Dinamika Akuntansi Dan Bisnis, 7(1), 33–50. https://doi.org/10.24815/jdab.v7i1.15671 https://www.ilomata.org/index.php/ijtc Market Concentration in Construction Tenders in West Papua Johantri, Aprilia, and Sopian. 219 | Ilomata International Journal of Tax & Accounting https://www.ilomata.org/index.php/ijtc Pavic, I., Galetic, F., & Piplica, D. (2016). Similarities and differences between the CR and HHI as an indicator of market concentration and market power. British Journal of Economics, Management & Trade, 13(1), 1–8. https://doi.org/10.9734/BJEMT/2016/23193 Peleckis, K. (2022). Determining the level of market concentration in the construction sector— case of application of the HHI index. Sustainability, 14(2), 779. https://doi.org/10.3390/su14020779 Podwol, J. U., & Schneider, H. S. (2016). Nonstandard bidder behavior in real-world auctions. European Economic Review, 83, 198–212. https://doi.org/https://doi.org/10.1016/j.euroecorev.2015.12.012 Presiden Republik Indonesia. (2021). Peraturan Presiden Nomor 12 Tahun 2021 tentang Perubahan Atas Peraturan Presiden Nomor 16 Tahun 2018 Tentang Pengadaan Barang/Jasa Pemerintah. Raharjo, K., & Gultom, Y. M. L. (2022). Pengaruh Jumlah Penawar Terhadap Harga Pemenang Pada Pengadaan Pekerjaan Konstruksi Pemerintah Daerah. GemaEkonomi, 11(5), 1080– 1092. Rajala, P., Ylä-Kujala, A., Sinkkonen, T., & Kärri, T. (2022). Profitability in construction: how does building renovation business fare compared to new building business. Construction Management and Economics, 40(3), 223–237. https://doi.org/10.1080/01446193.2022.2032228 Ryvkin, D., & Serra, D. (2020). Corruption and competition among bureaucrats: An experimental study. Journal of Economic Behavior & Organization, 175, 439–451. https://doi.org/https://doi.org/10.1016/j.jebo.2017.12.026 Salman, M., & Survanto, Y. (2019). Analysis and Development of Information Security Framework for Distributed E-Procurement System. 2019 6th International Conference on Electrical Engineering, Computer Science and Informatics (EECSI), 211–216. https://doi.org/10.23919/EECSI48112.2019.8976944 Škuflić, L., Mlinarić, D., & Družić, M. (2018). Determinants of construction sector profitability in Croatia. Zbornik Radova Ekonomski Fakultet u Rijeka, 36(1), 335–352. Svoboda, P. (2016). Analysis of market concentration in selected sectors of public procurement. Acta Universitatis Agriculturae et Silviculturae Mendelianae Brunensis, 64(3), 1073–1082. https://doi.org/10.11118/actaun201664031073 Vickrey, W. (1961). Counterspeculation, Auctions, and Competitive Sealed Tenders. The Journal of Finance, 16(1), 8–37. https://doi.org/10.1111/j.1540-6261.1961.tb02789.x Wang, Y., & Li, S. (2021). Market concentration, market power, and firm growth of construction companies. Advances in Civil Engineering, 2021, 1–9. https://doi.org/10.1155/2021/9990846 Watson, J. (2013). Strategy: an introduction to game theory (Third Edit). WW Norton New York. Wibowo, A. Y., Gamarefa, T., Partohap, T. H., Susilo, W. D., & Wijayanti, A. (2021). Survey Penilaian Integritas Tahun 2021. Komisi Pemberantasan Korupsi. Wicaksono, A. P., Urumsah, D., & Asmui, F. (2017). The implementation of E-procurement system: Indonesia evidence. SHS Web of Conferences, 34, 10004. https://doi.org/10.1051/shsconf/20173410004 https://www.ilomata.org/index.php/ijtc Market Concentration in Construction Tenders in West Papua Johantri, Aprilia, and Sopian. 220 | Ilomata International Journal of Tax & Accounting https://www.ilomata.org/index.php/ijtc Williams-Elegbe, S. (2018). Systemic corruption and public procurement in developing countries: are there any solutions? Journal of Public Procurement, 18(2), 131–147. https://doi.org/10.1108/JOPP-06-2018-009 https://www.ilomata.org/index.php/ijtc