Studies and Scientific Researches. Economics Edition, No 31, 2020 http://sceco.ub.ro 

33 
 

 
ORGANIZATION OF THE PUBLIC PROCUREMENT 
PROCESS AT THE LEVEL OF THE CONTRACTING 

AUTHORITIES IN ROMANIA. PARTICULARITIES AND 
SOLUTIONS FOR THE MANAGEMENT OF PUBLIC 

PROCUREMENT PROCEDURES ORGANIZED IN THE 
CONTEXT OF EMERGENCY OF COVID-19 CRISIS 

 
Ceocea Costel 

“Vasile Alecsandri” University of Bacău 
cceocea@sifm.ro 

Ceocea Raluca Alexandra  
“Gh. Asachi” University of Iași 

raluca.ceocea@gmail.com 
Vatamaniuc Adrian  

“Gh. Asachi” University of Iași 
adrian.vatamaniuc@gmail.com 

Mihălaș Vasile 
“Vasile Alecsandri” University of Bacău 

mihalas2018@gmail.com 
 
 
Abstract 
The normative framework applicable to public institutions imposes an approach to public 
procurement management aimed at awarding public procurement contracts in conditions of 
economic and social efficiency. Achieving the objectives set at the level of the organization, in 
accordance with the principles underlying the award of public procurement contracts is 
conditioned by the adoption and implementation of specific procedures, mainly oriented towards 
the organization of decision-making processes. In the context of the crisis triggered by the new 
Coronavirus SARS-CoV-2, contracting authorities were forced to organize public procurement 
processes, in a matter of urgency, on a procedural background less oriented towards adopting 
fast and efficient decisions, with negative effects both on the available financial resources and 
on the process of ensuring the flow of products, services and works corresponding to the rhythm 
imposed by the urgent needs of public institutions involved in managing the effects of the health 
crisis.  This paper aims at individualize the decision-making process in the field of public 
procurement in Romania, in order to identify models of good practice, procedures and support 
working tools for optimizing the public procurement process carried out at the level of 
contracting authorities in a matter of emergency. 
 
Keywords 
Romania; procedures; public procurement management; change management; decision-making; 
urgency; crisis; economic and social efficiency; SARS-CoV-2 
 
JEL Classification 
D73; H12; H57 
 
 
 
1. Introduction 
The concept of management, as a general approach, refers to a strategic process of 
organizing activities in order to achieve certain objectives assumed at the level of the 
organization. 

mailto:cceocea@sifm.ro
mailto:adrian.vatamaniuc@gmail.com
mailto:adrian.vatamaniuc@gmail.com
mailto:mihalas2018@gmail.com


ORGANIZATION OF THE PUBLIC PROCUREMENT PROCESS AT THE LEVEL OF THE CONTRACTING 
AUTHORITIES IN ROMANIA. PARTICULARITIES AND SOLUTIONS FOR THE MANAGEMENT OF PUBLIC 
PROCUREMENT PROCEDURES ORGANIZED IN THE CONTEXT OF EMERGENCY  OF COVID-19 CRISIS 

34 
 

Regarding the private organizations, management objectives are mainly aimed at 
maximizing profit or achieving other personal goals (e.g. the need to achieve of the 
leaders, securing a portfolio of clients, increasing knowledge, etc.). 
In contrast to the management of private organizations, public management mainly 
aims at achieving a general interest. 
In the literature, confusions are often identified between the concept of public 
management and the concept of public administration. 
Thus, the public administration is the expression of the activities undertaken for the 
fulfillment of the state functions and of the administrative-territorial structures, 
according to a framework regulated by normative acts. 
In other words, public administration activities represent activities performed by 
responsible persons/civil servants, who have drawn competencies to act in order to 
perform public services, by issuing and/or implementing public laws. 
Even if by the way it manifests itself, mainly due to the political character that 
determines them, between public administration and public management elements 
of interdependence are identified, between the two concepts the sign of equality cannot 
be put. In contrast to the concept of public administration which is strictly legal by the 
applicable legal framework, the concept of public management has evolved with the 
development of the functions of public sector organizations, with the development of 
theories on organization management and the evolution of the organizational and 
principled framework in which public organizations carries out their activities. 
Thus, public management brings together a set of processes and managerial 
relationships that occur at the level of the components of the administrative system, 
which aim to create the appropriate institutional framework  
to enable the general public interest to be satisfied. 
Even in this framework defined above, the literature tends towards an approximation 
of these two concepts, a fact also identified at the level of the Romanian university 
environment. Thus, public administration tends to be properly defined as “the use of 
managerial, political and legal theories and processes in order to fulfill the mandates of 
the legislative, executive and judicial government, in order to ensure the regulations 
and services for the society as a whole, as well as for its segments” (Alexandru, 2003, 
p.10). 
Moreover, it is found that the link between administration and management is the 
“decision-making process” process specific to management which, “is the heart of 
administration, and the vocabulary of administrative theory must derive from the 
logic and psychology of human choice”. (Simon, 1979)  
 
 
2. Public procurement management 
 

2.1. The concept of management at the level of public institutions 
As in the case of private organizations, the processes carried out at the level of public 
institutions can be divided into two categories: execution processes and management 
processes. 
In detail, the execution processes within the public institutions are usually reduced to 
bureaucratic processes that have as main result the obtaining of some services or 
deliverables, which contribute to the achievement of the objectives established at the 
level of the institution. In contrast to the execution processes, the management 
processes within the public institutions are manifested by decisional acts. 
The new Public Management, one of the strongest international currents in this domain, 
brings new ways to develop the sphere of public management. 



Costel Ceocea, Raluca Alexandra Ceocea, Adrian Vatamaniuc, Vasile Mihălaș 

35 
 

Even if the current of the New Public Management brings mainly a new attitude 
regarding the way the public administrative act is carried out, its orientation towards 
increasing the cost / efficiency ratio in the public sector requires both the import and 
the adaptation of specific management methods and techniques from private sector 
toward public organizations as well as the restructuring and optimization of the 
decision-making process within them. 
Decentralization of public administration, implementation of public policies through 
projects, increasing the training of officials and clerks, improved organization of public 
institutions, digitalization of the public administration sector, new attitudes towards the 
citizen-client impose new guidelines of public administrations, the new role of public 
management being to ensure the transition from an empirical leadership style to a 
scientifically based one, based on knowledge and innovation. 
The managerial decision within public institutions is a manifestation of the will of the 
administrative bodies, prior to the actions proposed to be undertaken, through which a 
solution is chosen, in order to achieve the proposed goal or objective or to achieve a 
desired result. This decision is usually taken when several appropriate possibilities or 
options are identified, which comply with the applicable legal framework, the selected 
option being the one that is identified as the most advantageous in relation to the 
institutional objectives assumed. 
A definition, with a systemic profile, is given by Armenia Adroniceanu, presenting the 
administrative decision as “a complex process of choosing a decision-making variant 
from several possible ones, in order to achieve a public administration objective and 
influencing the activity of at least, another person in the system, the system as a whole 
or society in general” (Adroniceanu, 1999). 
 

2.2. The decision-making process 
Analyzing carefully the decision-making process carried out at the level of public 
institutions, we find that it involves: 
 collaboration of several people from the organizational structures of the 

institution 
 processing a large volume of information 
 carrying out the process in several stages 
 endorsement by one or more competent persons 
 assuming the responsibility of one or more persons holding public positions 

(Dulschi, 2016).  
In the decision-making process, as a process of analysis and evaluation of several 
alternatives, the following main elements are identified: 

 The decision maker – represented by the person or group of persons who are 
to adopt the optimal variant from those possibly identified. 

 The problem subject to the decision – represented by the object of the 
decision 

 Decision variants – represented by the identified options 
 Decision-making criteria – represented by the characteristics on the basis of 

which the decision-making variants are evaluated and compared for the 
purpose of ranking and selecting the optimal variant 

 Decision-making environment – represented by the context given by the 
internal and external conditions that influence the decision 

 The set of consequences – represented by the results estimated to be obtained 
by adopting the decisional variants, established in relation to each decisional 
criterion separately 

 Decision objectives – the results intended to be achieved by the decision 
maker following the implementation of the selected decision variant. 

 



ORGANIZATION OF THE PUBLIC PROCUREMENT PROCESS AT THE LEVEL OF THE CONTRACTING 
AUTHORITIES IN ROMANIA. PARTICULARITIES AND SOLUTIONS FOR THE MANAGEMENT OF PUBLIC 
PROCUREMENT PROCEDURES ORGANIZED IN THE CONTEXT OF EMERGENCY  OF COVID-19 CRISIS 

36 
 

The decision-making process that should underlie the decision-making of the public 
decision-maker should move away from the administrative model (limited rational 
model) or the retrospective model (specific to public authorities with low managerial 
capacity) and move towards a rational model (classic) built on the following steps:  

I. Establishing the institutional objectives pursued 
II. Collection, verification, processing and analysis of information 

III. Elaboration of options and quantification of the expected results of each option 
IV. Selecting the most advantageous option 
V. Putting into practice the selected variant, controlling the execution process and 

evaluating the results obtained. 
 

2.3. Public procurement management 
Although an insufficient allocation of financial resources is constantly invoked to the 
portfolio of needs generated by public institutions in Romania, it was found an 
inadequate management of public procurement processes, characterized by wrong/poor 
procurement, which generated waste of public funds and consumption of goods, 
services and unjustified works in relation to the institutional objectives established by 
the multitude of strategies assumed at their level. 
In addition, European officials are constantly calling for the need to increase 
administrative capacity at the level of public institutions in order to increase the 
absorption of EU funds, based on unfavorable reports on frequent deviations of the 
public procurement from the legislative framework and related sanctions. 
We appreciate that the optimal solution to improve the public procurement process 
carried out at the level of public institutions in Romania is one that aims to take over 
from the private sector some management techniques and methods, by adapting them 
to the specific constrains of the public administration sector. 
As indicated in Public Procurement Law1, the managerial decisions that will be adopted 
regarding the public procurement processes must take into account the principles 
underlying the award of public procurement contracts, according to figure no. 1 below: 

  

 
 

Figure 1 Principles underlying public procurement management 
Source: authors, based on the Public Procurement Law no 98/2016 

 
Given that the procurement process is a multidisciplinary one, involving all 
organizational structures on a variable basis, the managerial decisions that can be taken 
regarding public procurement must comply with the formalization and approval 
/approval process required by the regulatory framework applicable to all processes 
carried out at the level of the public institution and must aim mainly at achieving 
institutional objectives. 

 
1 Article 2 (2) form Public Procurement Law no 98/2016 



Costel Ceocea, Raluca Alexandra Ceocea, Adrian Vatamaniuc, Vasile Mihălaș 

37 
 

The main objectives that can be set at the level of a public institution with regard to the 
procurement process carried out at its level are: 

 ensuring the institution with a flow of products, services and works 
corresponding to the level and pace required by the objective needs established 
at the institution level 

 obtaining the products, services and works required in the context of economic 
and social efficiency 

 conduct of contractual relations concluded by procurement processes under 
optimal conditions, respecting the principle of legality and contractual balance 

The stages at which the procurement process is carried out, in accordance with the 
regulatory frame2 are: 

A. Planning/preparation phase, including market consultation 
B. Stage of organization of the procedure and award of the contract/framework 

agreement 
C. Post-award stage of the contract/framework agreement execution and 

monitoring of the implementation of the contract/framework agreement 
In order to advance the above stages, the specific tools for planning and monitoring 
public procurement processes that may be available to contracting authorities are: 

a) Public Procurement Strategy 
b) Annual Public Procurement Program 
c) GANTT chart 
d) Risk Management Plan / Risk Register 
e) Contracting strategy 

The characteristics of contracting authorities according to which the structuring of 
decision-making processes must be adjusted are: 

 Type of contracting authority and its main activity 
 Volume and complexity of the public procurement portfolio 
 Number of people involved in procurement processes 
 Training policy for staff involved in procurement processes. 

Considering the results of the research activity carried out so far, according to the above 
conclusions, we outlined the following conceptual model that underlies the analysis of 
the decision-making process in the field of public procurement. 
 

 
Figure 2 Conceptual model on the decision-making process in public 

procurement 
Source: Authors 

 
2 Article 8.(2) of the Methodological Norms for the application of the public procurement law, published by 
Government Decision no. 395/2016 



ORGANIZATION OF THE PUBLIC PROCUREMENT PROCESS AT THE LEVEL OF THE CONTRACTING 
AUTHORITIES IN ROMANIA. PARTICULARITIES AND SOLUTIONS FOR THE MANAGEMENT OF PUBLIC 
PROCUREMENT PROCEDURES ORGANIZED IN THE CONTEXT OF EMERGENCY  OF COVID-19 CRISIS 

38 
 

3. Public procurement-specific decision-making process in the context of 
the emergency situation triggered by the COVID-19 outbreak 
 

3.1. Analysis of the context in which public procurement was carried out 
during the emergency period 
The field of public health has caught the full attention of experts and policy makers 
throughout the first 5 months of 2020. What at first seemed just another flu epidemic, 
has turned into an event of cataclysmic proportions, both in terms of the number of 
diseases, as well as the pressure on economic systems and especially public health 
systems. Against this background, the political response mechanisms, decision-making 
systems and support infrastructure proved to be more or less effective, the moment we 
present our conclusions in view of being within the limits of an evaluation in medias 
res, the epidemic not being fully stopped. 
Obviously, this pandemic landscape has changed the paradigm in which decisions have 
been taken in the public sector, especially within institutions that have played an active 
role in the action plans applied for combating the spread of COVID-19 Coronavirus 
and manage the consequences. 
Thus, as a result of the onset of the state of emergency, by issuing Decree no. 195 / 
16.03.2020, published in the Official Journal of Romania no. 212 of 16.03.2020, the 
contracting authorities involved in actions to combat and manage the consequences of 
the pandemic, from the point of view of public procurement, were transposed into a 
new framework that required the procurement in a short time of significantly more large 
amounts of products needed to combat and manage the effects of the epidemic. 
This new picture of public procurement triggered by the health crisis COVID19 was 
characterized by an inaccurate legislative framework, insufficient administrative 
capacity and a market dominated by a growing demand. 
In the process of establishing the state of emergency by Decree no. 195 / 16.03.2020, 
“probably” due to the pressure of the moment, certain terms were used, inappropriately, 
a phenomenon likely to generate confusion among the contracting authorities.  
For example in the text of Decree no. 195 / 16.03.2020 identifies the inappropriate use 
of public procurement-specific terminology such as “procurement in direct mode” 3  
(and not through “direct procurement”) or “direct procurement procedure” 4  (taking 
into account that direct procurement5 is not defined as a competitive public 
procurement procedure). Anticipating possible dichotomies, misunderstandings, 
induced interpretations, National Agency for Public Procurement through a notification 
published on the institution's website on 16.03.2020, reiterated the incidence of the 
legislative framework established by Public Procurement Law no 98/2016 in the case 
of this state of emergency, which promotes the award of public procurement contracts 
through competitive procedures 
We intuited that this state of confusion has variably characterized the entire EU space, 
which is why the European Commission issued Communication 2020 / C 108 I / 01 of 
01.04.2020 on its guidelines for the use of the legal framework for public procurement 
in the case of the award of public procurement contracts in the event of emergency 
triggered by the COVID-19 crisis, which strengthens the incidence of using the 
competitive procedures established by Directive 2014/24 / EU (and assimilated at the 

 
3 Article 10 of Decree no. 195 / 16.03.2020 
4 Article 28 (2) of Romania no. 195 / 16.03.20200 
5 The direct procurement regulated by art. 43-46 of Government Decision no 395/2016, is not a public 
procurement procedure within the meaning of Art. 68 of Law 98/2016 but only a right offered to the 
contracting authority to purchase products, services or works with an estimated value below the limit imposed 
by art. . 7 para. (5) of Law 98/2016, without using the competitive method of awarding these contracts. 



Costel Ceocea, Raluca Alexandra Ceocea, Adrian Vatamaniuc, Vasile Mihălaș 

39 
 

level of Public Procurement Law no 98/2016) in the case of awarding public 
procurement contract of products, services and works needed to deal with this crisis. 
 
At the same time, the picture of public procurements in the emergency state was also 
affected by a low capacity of the teams involved in public procurement processes 
carried out in this period, both in terms of professional level and availability of their 
members. 
Among the cases cited in the discussions between experts in various communication 
channels and specialized forums are: 

 reduced number of staff 
 low level of training, inadequate in relation to the particularities of the specific 

market of sanitary materials, protection materials, medical equipment, 
medications, etc. 

 the modification of the work schedule, the transfer of some employees under 
the telework contract regime, the lack of resources and infrastructure 
necessary to carry out the activities exclusively online 

 poor use or non-use of the facilities offered by the digital signature system. 
Following the administration of a questionnaire at the level of several contracting 
authorities in the North-East region in 20196, conclusions were drawn which, in 
retrospect, confirm the chronic existence of some of the problems mentioned above, 
namely: 

 Approx. 7% of the contracting authorities involve in the procurement 
processes more than 6 persons, and approx. 35% involve a number of 2-5 
persons; 

 Over 78% of contracting authorities do not use IT applications (other than 
Electronic Public Procurement System) for planning and managing public 
procurement processes; 

 Only 50% of the contracting authorities have implemented a continuous 
professional training program in the field of public procurement (with a 
participation frequency of max. 2 years); 

 Over 85% of the staff involved in public procurement processes have a total 
work experience of over 20 years, corroborated by the fact that over 64% of 
these staff are over the age of 45 (of which 28.6% over 55 for years). 

And if these factors were not enough to increase the complexity of the decision-making 
process in the field of public procurement, the market to which emergency public 
procurement contracts were addressed also put additional pressure on the decision-
making act, both by the unavailability in the market of the volumes of products 
requested by the contracting authorities and by the high volatility of the prices related 
to these products. 
As elements that directly influenced the specific market of these materials and 
equipment we highlight: 

 Lack of domestic producers of such products, which would provide a 
predictability and guarantee of the availability of the requested products in 
agreed delivery schedules, producers to whom the public authorities could 
impose, according to law7, the amplification of the production process to cover 
the additional need generated by such a crisis;  

 Established restrictions on the international transport of goods, especially in 
trade relations between the European and Asian areas that have disrupted 
supply chains. 

 
6 Research report no. 3 advanced at the level of the Doctoral School within the University “Gh. Asachi” Iași 
(Vatamaniuc, 2019) 
7 Eg. Article 9 para. (1) of the Government Emergency Ordinance no. 1 of 21.01.1999 on the state of siege 
and the state of emergency 



ORGANIZATION OF THE PUBLIC PROCUREMENT PROCESS AT THE LEVEL OF THE CONTRACTING 
AUTHORITIES IN ROMANIA. PARTICULARITIES AND SOLUTIONS FOR THE MANAGEMENT OF PUBLIC 
PROCUREMENT PROCEDURES ORGANIZED IN THE CONTEXT OF EMERGENCY  OF COVID-19 CRISIS 

40 
 

 Lack of “buffer” stocks at importers and / or distributors with constant activity 
in this relevant market, ensuring a rapid supply immediately after the award 
of the public procurement contract; 

 The small-scale use in this market of the special method of awarding public 
contracts using “Framework Agreements”, which provides for the option of 
purchasing additional quantities (compared to the current need) and which 
makes it possible to supply initial stocks of products quickly, without other 
bureaucratic formalities imposed by the applicable legal framework in the 
field of public procurement. 

As an example of the above we can present the evolution of the unit price and the 
contracted volumes related to a product widely used in this health crisis, respectively 
“surgical mask”, during the first four months of this year, according to the table below: 
 

Table 1 Evolution of public procurement of surgical masks  
(Jan.-Apr. 2020) 

 
 January February March April 

Number of 
procurement 
(according to  

SEAP catalogue) 

17 
contracts 

78 
contracts 

251 
contracts 

263 
contracts 

Quantity  
purchased 

60,990  
pcs 

398,550  
pcs. 

1,376,280 
pcs 

1,816,527 
pcs 

Average unit price 
(excluding VAT) 0.17 lei/pc 1.83 lei/pc 3.75 lei/pc 2.73 lei/pc 

Source: Electronic Public Procurement System (SEAP)- extracted from direct purchases  
http://e-licitatie.ro/pub 

 
As a specific detail of a market dominated by the crisis, the table above shows a direct 
correlation between the dynamics of the unit purchase price (+ 2,200.00%) and that of 
the volume of products purchased (+ 2,256.00%). 
As a result of this accumulation of factors that have contributed to the accentuation of 
the uncertainty and to the increase of the risk intensity, we consider as very probable 
the increase of the incidence of the decisional errors and/or of the deviations from the 
law. 
The fact that most contracting authorities (Vatamaniuc, 2019) did not implement an 
internal procedure for decision-making in the field of public procurement (71.4%) also 
contributed to this situation, even though the leaders of these contracting authorities 
equally recognize that the implementation of such a procedure would directly 
contribute to the achievement of the objectives set at the level of the institution (71.5%). 
In summary, the way in which the public procurements were carried out during the 
emergency situation can be summarized and explained from the perspective of their 
specific causal relations, as presented in figure no. 3. 

http://e-licitatie.ro/pub


Costel Ceocea, Raluca Alexandra Ceocea, Adrian Vatamaniuc, Vasile Mihălaș 

41 
 

 
 

Figure 3 Causal relationships specific to public procurement processes carried 
out in the context of COVID-19 emergency 

Source: Authors 
 
 
4. Conclusions and directions for action on decision-making in the context 
of emergencies. 
Starting from the idea that the mere finding of a state cannot generate a positive 
response of the system in the absence of the introduction of improvement measures and 
without proposing to fully cover this topic, we bring it forward the idea of establishing 
decision-making procedures and how they can compete to achieve the goals set in the 
portfolio of public procurement processes carried out in an emergency context. 
In this new decision-making frame, by applying appropriate change management, the 
general objectives to be set at the level of the public procurement portfolio of products 
/ services / works required in the context of emergencies must refer at least to: 

 Implementation of specific procedures for decision making in conditions of 
increasing uncertainty and risk; 

 Professionalization of staff with responsibilities in public procurement 
management;  

 Promoting integrated risk response systems, at inter-institutional level; 
The achievement of these objectives must be doubled by the assumption of sets of 
impact and result indicators, among which we can mention, without limiting ourselves 
to: 

 R1. Increasing the response speed of contracting authorities in relation to 
market dynamics 

 R2. Reducing the duration of processes associated with public procurement; 
 R3. Establishing a set of performance indicators at the level of contracts; 
 R4. Reducing errors and reducing the number of cases of procurement failure. 

 



ORGANIZATION OF THE PUBLIC PROCUREMENT PROCESS AT THE LEVEL OF THE CONTRACTING 
AUTHORITIES IN ROMANIA. PARTICULARITIES AND SOLUTIONS FOR THE MANAGEMENT OF PUBLIC 
PROCUREMENT PROCEDURES ORGANIZED IN THE CONTEXT OF EMERGENCY  OF COVID-19 CRISIS 

42 
 

And last but not least, it must be emphasized that any process that takes place under 
conditions of uncertainty and risk can be influenced by factors that are difficult to 
anticipate which may disrupt both the conduct of public procurement processes carried 
out at the level of contracting authorities and the functioning of the public procurement 
system as a whole. 
 
 
References 
“Al. I. Cuza” University Iași (n.d.), Guide to tools and good practices in public 

decision-making. 
Adroniceanu, A. (1999), Public management, Bucharest, Economic Publishing House. 
Alexandru, I. (2003), Public Administration. 
Csáki, C. (2006), Investigating the decision making practice of public procurement, 

International public procurement conference proceedings. 
Dulschi, I. (2016), The decision-making process in public administration, Public 

administration: theory and practice. 
European Commission (2020), Communiqué 2020 / C108 I / 01. European Commission 

guidelines for the use of the public procurement emergency framework related 
to the COVID-19 crisis, Official Journal of the European Union. 

European Parliament and Council of the European Union (2014), Directive 
2014/24/EU, Official Journal of the European Union. 

Hințea, C.E., Marius, C., Țiclău, T.C. (2015), Strategic planning and public 
management reform: the case of Romania, Transylvanian Review of 
Administrative Sciences, 30-44. 

Nica, E. (2012), Public Procurement Management, Bucharest, Economic Publishing 
House. 

Organisation for Economic Coorperation and Development (2018), Methodology for 
Assesing Procurement Systems (MAPS), OECD. 

Popa, I.G., Ispas, R. (2019), Study regarding the planning stage of the romanian public 
procurement process, International Conference “Knowledge-based 
organization”. 

President of Romania (2020), Decree 195, Regarding the establishment of the state of 
emergency on the Romanian territory, Official Journal. 

Romanian Government (1999), Emergency Ordinance 1, Regarding the state of siege 
and the state of emergency, Official Journal of Romania. 

Romanian Government (2016), Government Decision no. 395, Methodological norms 
for the application of the provisions regarding the award of the public 
procurement contract, Official Journal of Romania. 

Simon, H.A. (1979), Rational Decision Making in Business Organizations, The 
American Economic Review, vol. 69, 493-51. 

The Romanian Parliament (2016), Public procurement law no. 98, Official Journal of 
Romania. 

Vatamaniuc, A. (2019), Research report no.3, Iași, “Gh Asachi” University. 


	1. Introduction
	2. Public procurement management
	2.1. The concept of management at the level of public institutions
	2.2. The decision-making process

	3. Public procurement-specific decision-making process in the context of the emergency situation triggered by the COVID-19 outbreak
	3.1. Analysis of the context in which public procurement was carried out during the emergency period

	4. Conclusions and directions for action on decision-making in the context of emergencies.