item: #1 of 41 id: ukarst-101 author: Poernomo, Yosef Cahyo Setianto; Ridwan, Ahmad; Lubis, Zulkifli; Gunarto, April; Winarto, Sigit title: PELAKSANAAN MANAJEMEN KONSTRUKSI PADA PROYEK PEMBANGUNAN BANK SINAR MAS KEDIRI date: 2018-04-08 words: 3054 flesch: 58 summary: Sambungan antara beton yang lama dan yang baru diberikan bahan perekat yang berupa cairan kental putih yang disebut calbon yang berfungsi untuk menyatukan beton. Pekerjaan pembesian meliputi pekerjaan pemotongan, ppembengkokan, dan pemasangan tulangan atau pabrikasi pembuatan kolom dan balok yang dilakukan di tempat pabrikasi. keywords: adalah; alat; atau; balok; bekisting; beton; dan; dapat; dari; dengan; digunakan; dilakukan; issn; keterlambatan; kolom; lantai; menggunakan; pada; pekerjaan; pelat; pembangunan; penggalian; proyek; tersebut; untuk; yang cache: ukarst-101.pdf plain text: ukarst-101.txt item: #2 of 41 id: ukarst-1093 author: Hapsari, Arlita Mey; Sisinggih, Dian; Hendrawan, Andre Primantyo; Wahyuni, Sri title: Identification of Physical and Mineralogical Properties of Riverbank Material at Sand Mining Landslide Sites of Kali Putih River, Blitar date: 2021-04-03 words: 5397 flesch: 62 summary: The objective of sieve analysis, among others, is to find out the condition of the gradation – whether good, poor, or uniform, as well as to find out the sizes of soil particles. Dry soil is only composed of two parts, which are soil particles and air pores. keywords: analysis; issn; kali; material; particle; results; river; sand; sites; soil; sphericity cache: ukarst-1093.pdf plain text: ukarst-1093.txt item: #3 of 41 id: ukarst-1153 author: Khaulan, Dian Wahyu; Hidayah, Entin; Halik, Gusfan title: Accuracy of DSM By Using Unmanned Aerial Vehicles on the Downstream of Welang Riverbank, District of Pasuruan, Jawa Timur date: 2021-04-03 words: 4256 flesch: 63 summary: Equations (1)-(3) are RMSE formulas that indicate horizontal accuracy, and equations (4)-(5) are RMSE formulas that indicate vertical accuracy. DSM Accuracy and BIG Standard Accuracy Accuracy Test Result (m) BIG Standard Accuracy at Scale of 1:5000 keywords: accuracy; area; coordinate; course; dsm; issn; pasuruan; study; uav; vehicles; vol; welang cache: ukarst-1153.pdf plain text: ukarst-1153.txt item: #4 of 41 id: ukarst-140 author: Gardjito, Edy title: PERAN PIHAK PROYEKTIF PADA PENGENDALIAN KUALITAS (STRUKTUR BETON) DAN PENCAPAIAN KINERJA PROYEK date: 2018-04-08 words: 2919 flesch: 51 summary: ISSN 2581-0855 As an evaluation material for the parties involved in construction projects (stakeholders), policy makers, or drafting plans in the management of a project, especially on the achievement of project performance. The result of this research is very positive influence of concrete quality control factors and the role of project related party influence to the achievement of construction project performance, that is proved by stepwise regression test and hypothesis test where Quality performance (Fi = 21,758> Ft = 2,060), Time performance (Fi = 14,950> Ft = 4,496), Cost performance (Fi = 15,379> keywords: achievement; coefficient; concrete; construction; control; issn; performance; project; quality; test cache: ukarst-140.pdf plain text: ukarst-140.txt item: #5 of 41 id: ukarst-1558 author: Tjendani, Hanie Teki; Marleno, Risma; Hendry, Hendry; Subiyantoro, Iwan title: Risk Assessment of Feasibility Study for Toll Road X - Y with Public Private Partnership Scheme date: 2021-04-03 words: 5961 flesch: 52 summary: Explains the steps in project risk management with the following description 2.2.1 Toll Road Risk Category & Element In toll road investment, there are risk categories that must consider, specifically [21]: Project performance risk consists of Planning risk, especially the risk that occurs at the planning stage such as competition, namely the risk that other development alternatives provide more attractive options than the existing proposal, the risk of sudden change or relocation of a potential target location which results in a decrease in the feasibility of the project to be developed, the sponsors (investors) involved in the project fail to fulfill their obligations, the risk where a project that was initially thought to be feasible turns out to be unsatisfied with several assumptions so that it is not feasible and must be canceled. keywords: assessment; construction; feasibility; impact; issn; management; ppp; probability; project; public; risk; road; study; toll; toll road cache: ukarst-1558.pdf plain text: ukarst-1558.txt item: #6 of 41 id: ukarst-1583 author: Akhmudiyanto, Akhmudiyanto; Rahardjo, Paulus Pramono; Karlinasari, Rinda title: Repair Performance Landslide and Slope Using Bore pile and Ground Anchor on Cipali Toll Road Km 103 date: 2021-12-20 words: 5837 flesch: 63 summary: In this research, data collection, modeling parameter determination, slope stability analysis, slope reinforcement analysis, and reinforcement design were carried out with variations in bore pile and ground anchor dimensions. Slope stability analysis begins 241 - 251 http://dx.doi.org/10.30737/ukarst.v3i2 Repair Performance Landslide and Slope Using Bore pile and Ground Anchor on Cipali Toll Road Km 103 by knowing how the conditions of slope stability and reinforcement have been carried out, the condition of the Cibening river flow. keywords: analysis; anchor; bore; bore pile; cipali; ground; ground anchor; issn; landslide; pile; reinforcement; road; slope; soil; stability; toll cache: ukarst-1583.pdf plain text: ukarst-1583.txt item: #7 of 41 id: ukarst-1584 author: Setianto, Kevin Martandi; Swan, Cecilia Lauw Giok; Rahardjo, Paulus Pramono title: Load Transfer On Bored Pile Foundation Instrumented With Fiber Optic And Concrete Quality Analysis date: 2021-12-20 words: 5186 flesch: 64 summary: There are so many reasons for us to use bored pile foundation as our building foundation system are (1) the consistency of soil in the top is soft to medium soft, (2) there is an inclined workload, (3) bored pile foundation has the higher lateral capacity, and (4) bored pile foundation has the higher uplift capacity [5]. [3] F. Abdrabbo and H. Abouseeda, “Effect of construction procedures on the performance of bored pile,” ASCE Deep Found. keywords: analysis; concrete; fiber; foundation; issn; modulus; optic; pile; pile foundation; strain; value cache: ukarst-1584.pdf plain text: ukarst-1584.txt item: #8 of 41 id: ukarst-255 author: Candra, Agata Iwan; Anam, Sulik; Mahardana, Zendy Bima; Cahyono, Andri Dwi title: STUDI KASUS STABILITAS STRUKTUR TANAH LEMPUNG PADA JALAN TOTOK KEROT KEDIRI MENGGUNAKAN LIMBAH KERTAS date: 2018-11-03 words: 2960 flesch: 60 summary: Pada struktur benda uji tanah yang telah ditambahkan limbah kertas hingga sebesar 20% mengalami penurunan nilai Liquid Limit hingga menjadi 43%, dengan demikian menunjukkan bahwa penambahan 57 51 49 42 43 24,44 29,22 29,75 29,92 31,6432,56 21,78 19,25 12,08 11,36 0 10 20 30 40 50 60 0 2,5 5 7,5 10 12,5 15 17,5 20 Kadar Limbah Kertas (%) Batas Konsistensi Tanah (Mix Limbah Kertas) Dokumentasi penelitian 2.2 Pengujian Sampel Pengujian yang dilakukan meliputi pengujian konsistensi tanah serta pemadatan tanah dengan uraian sebagai berikut: UkaRsT VOL.2, NO.2 TAHUN 2018 p ISSN 2579-4620 e ISSN 2581-0855 Hal 92 1) Uji Konsistensi Pengujian batas konsistensi (Atterberg limits) keywords: air; berat; dan; dari; dengan; dilakukan; issn; kadar; kering; kertas; lempung; limbah; pada; penelitian; pengujian; soil; tanah; uji; vol; volume; yang cache: ukarst-255.pdf plain text: ukarst-255.txt item: #9 of 41 id: ukarst-261 author: Agustapraja, Hammam Rofiqi; Kartikasari, Dwi title: STUDI EVALUASI PEKERJAAN STRUKTUR BOX CULVERT PADA PROYEK PEMBANGUNAN JEMBATAN KUCING RUAS SUKODADI – SUMBERWUDI KABUPATEN LAMONGAN date: 2017-05-09 words: 1996 flesch: 56 summary: HASIL DAN PEMBAHASAN Pada pekerjaan jembatan Kucing ruas Sukodadi – Sumberwudi ini ada beberapa pekerjaan yang dilakukan, berikut ini ruang lingkup pekerjaan yang dikerjakan : Dimensi - Bentang jembatan A – B = 7,14 m Konstruksi - Tipe jembatan = Jembatan Box Culvert - Lantai bawah = Beton K 250 tebal 32 cm - Lantai atas = Beton K 250 tebal 32 cm - Dinding jembatan = Beton K 250 tebal 32 cm - Strauss = Beton K 225 diameter 20 cm Berikut ini pekerjaan yang ada dalam pekerjaan struktur jembatan kucing ruas Sukodadi – Sumberwudi : A. Pekerjaan Tanah terdiri dari : - Pekerjaan galian staruss pile - Beton = K 225 - Bentang = 7,14 m - Lebar = 7,40 m - Jumlah titik Strauss = 25 titik - Jumlah besi setiap titik = 5 bh - Diameter = 20 cm - Kedalaman = 4,0 m goron plat injak,pasangan bekisting/ UkaRsT VOL.1, NO.1 TAHUN 2017 aksanaan pekerjaan jasa jasa lainya Untuk mencapai tut pelaksanaan pekerjaan yang benar-benar teliti ualitas yang tercipta. keywords: beton; dan; issn; jembatan; kucing; pada; pekerjaan; pelaksanaan; plat; proyek; struktur; sukodadi; yang cache: ukarst-261.pdf plain text: ukarst-261.txt item: #10 of 41 id: ukarst-262 author: Affandy, Nur; Lubis, Zulkifli title: PENGARUH PENAMBAHAN SERAT ALAMI ECENG GONDOK TERHADAP KUAT TEKAN BETON BERKUALITAS RENDAH date: 2018-06-17 words: 2074 flesch: 59 summary: untuk campuran serat masing-masing 0%2%4%6%8% dengan menggunakan Menggunakan silider diameter 15 cm dengan tinggi 30 cm, dan beton akan diuji pada umur 7 hari, dan sesudah itu akan dilakukan perhitungan konversi beton untuk mengetahui kuat tekan beton pada umur 28 hari dan kemudian diambil datanya. Hasil Analisa, 2018 Dari grafik di atas diketahui nilai kuat tekan beton yang sudah dikonversi ke 28 hari. keywords: bahan; beton; campuran; dan; dengan; eceng; gondok; hasil; issn; kuat; nilai; pada; penelitian; serat; tekan; uji; yang cache: ukarst-262.pdf plain text: ukarst-262.txt item: #11 of 41 id: ukarst-264 author: Gardjito, Edy title: STUDI PERENCANAAN GEOMETRIK PERKERASAN JALAN DAN PERENCANAAN ANGGARAN BIAYA PADA JALAN RAYA KALIDAWIR – DESA NGUBALAN KECAMATAN KALIDAWIR date: 2017-12-03 words: 1754 flesch: 63 summary: Identifikasi Masalah a. Perencanaan Geometrik Jalan Perencanaan geometrik jalan merupakan sebuah bagian dari perencanaan jalan yang tertitik beratkan pada alinyemen horizontal dan alinyemen vertikal, sehingga dapat memenuhi fungsi dasar dari jalan yang mampu memberikan kenyamanan yang optimal pada arus lalu lintas dan sebagai akses ke rumah – rumah. b. Perencanaan Tebal Perkerasan Lentur Dalam pembahasan kali ini memuat tentang perencanaan jalan baru yang Hal 94 UkaRsT VOL.1, NO.2 TAHUN 2017 p ISSN 2579-4620 e keywords: bina; dan; data; dengan; issn; jalan; kalidawir; marga; metode; pada; pekerjaan; perencanaan; perkerasan; yang cache: ukarst-264.pdf plain text: ukarst-264.txt item: #12 of 41 id: ukarst-266 author: Hepiyanto, Rasio; Kartikasari, Dwi title: PENGARUH CAMPURAN AIR LIMBAH (AIR SELOKAN) TERHADAP KUAT TEKAN BETON f’c 14.5 Mpa (K-175) date: 2018-11-03 words: 1818 flesch: 58 summary: METODE PENELITIAN Penelitian ini mengunakan metode eksperimen yaitu penelitian dengan percobaan langsung di Laboratorium Universitas Islam Lamongan (Unisla) yang bertujuan untuk menyelidiki hubungan sebab akibat anatara satu sama yang lain dan membandingkan hasilnya, beton yang diteliti merupakan beton dengan mengunakan campuran Air Limbah (Air Selokan) Hal ini tentunya memerlukan pemeriksaan yang lebih teliti terhadap metu beton yang dihasilkan. keywords: air; bahan; beton; dan; dari; data; dengan; issn; kuat; limbah; mpa; pada; penelitian; selokan; tekan; yang cache: ukarst-266.pdf plain text: ukarst-266.txt item: #13 of 41 id: ukarst-268 author: Hartantyo, Sugeng Dwi; Agustapraja, Hammam Rofiqi title: ANALISA KINERJA KA KOMUTER SURABAYA – LAMONGAN date: 2018-11-15 words: 2130 flesch: 61 summary: Namun pada faktanya para calon penumpang kereta api komuter mengeluhkan kenyamanan dalam hal ini yang berkaitan dengan jumlah tempat duduk dan tempat berdiri yang tersedia. Pembahasan ini adalah menganalisa kenyamanan per tempat duduk dan berdiri yang telah ditetapkan, menganalisa kapasitas kendaraan operasional KA Komuter Surabaya – Lamongan, Untuk dapat menjawab permasalahan tersebut maka dilakukan penelitian terhadap KA Komuter dan instansi terkait. keywords: api; bulan; dan; dari; dengan; issn; kapasitas; kereta; komuter; lamongan; load; penumpang; rata; surabaya; tempat; yang cache: ukarst-268.pdf plain text: ukarst-268.txt item: #14 of 41 id: ukarst-269 author: Hartantyo, Sugeng Dwi; Hepiyanto, Rasiyo title: BAHAN TAMBAH SERAT ECENG GONDOK PADA LASTON TIPE XI TERHADAP INDEKS MARSHALL TEST MENGGUNAKAN KERIKIL MANTUP date: 2018-11-24 words: 2599 flesch: 49 summary: ISSN 2581-0855 dengan observasi dan evaluasi penelitian yang telah dilakukan dan telah dikenal, sampai pembentukan kerangka diperlukan bukti lebih lanjut. ISSN 2581-0855 Dari hasil penelitian yang dilakukan mengenai pengaruh penggunaan serat eceng gondok sebagai bahan pengganti serat selulosa pada campuran Laston Tipe XI SNI 03 – 1737 – 1989 yang telah dilakukan dapat ditarik kesimpulan sebagai berikut : 1. keywords: adalah; agregat; aspal; bahan; campuran; dalam; dan; dengan; eceng; gondok; hasil; issn; laston; marshall; pada; penelitian; rongga; selulosa; serat; uji; untuk; void; yang cache: ukarst-269.pdf plain text: ukarst-269.txt item: #15 of 41 id: ukarst-2829 author: Haromain, Safira Anisah; Wahyuni, Sri; Limantara, Lily Montarcih title: Rationalization of Rainfall Station Network in Welang Watershed Using Kagan-Rodda Method date: 2022-09-07 words: 6238 flesch: 60 summary: Rainfall data generated from rainfall stations are important input data for water resources management [2] [3] [4]. By rationalizing rainfall stations, it is expected to get a rainfall station that can represent rainfall data in the area. keywords: area; data; ground; kagan; rainfall; rainfall data; rainfall station; rationalization; rodda; satellite; station; value; vol cache: ukarst-2829.pdf plain text: ukarst-2829.txt item: #16 of 41 id: ukarst-346 author: Tri Cahyono, Budi; Dhana, Rio Rahma title: ALTERNATIF PENGGUNAAN SERATECENG GONDOK (EICHHORNIA CROSSIFES) SEBAGAI BAHAN TAMBAH PADACAMPURAN BETON DITINJAU TERHADAP KUAT TEKANNYA date: 2019-05-17 words: 2322 flesch: 60 summary: Pemeriksaan Serat Eceng gondok Serat eceng gondok yang digunakan adalah eceng gondok yang diproses sendiri oleh peneliti sehingga menjadi serat eceng gondok yang dibutuhkan. Jika ingin membuat beton berkualitas baik, dalam arti memenuhi persyaratan yang lebih ketat karena tuntutan yang lebih tinggi, maka harus diperhitungkan dengan seksama cara-cara memperoleh adukan beton(beton segar/fresh concrete) yang baik dan beton (beton keras / hardened concrete) keywords: astm; beton; dan; dari; dengan; eceng; gondok; hari; issn; kuat; pada; penelitian; serat; tekan; uji; umur; yang cache: ukarst-346.pdf plain text: ukarst-346.txt item: #17 of 41 id: ukarst-347 author: Kartikasari, Dwi; Nafi’iyah, Nur title: SIMULASI DISTRIBUSI AIR BERSIH DENGAN ADOBE FLASH date: 2019-05-17 words: 1701 flesch: 57 summary: Sehingga dalam penelitian ini dicoba menggunakan perangkat lunak umum berbasis multimedia yaitu Adobe Flash. Sehingga dalam penelitian ini dicoba menggunakan software umum yang berbasis multimedia yaitu Adobe Flash. keywords: adobe; air; bersih; dan; desa; distribusi; flash; gambar; issn; pembuatan; simulasi; yang cache: ukarst-347.pdf plain text: ukarst-347.txt item: #18 of 41 id: ukarst-348 author: Wulandari, Kartisyah; Kartikasari, Dwi title: STUDI PENCAMPURAN SERAT ENCENG GONDOK PADA CAMPURAN BETON DENGAN PENGGUNAAN AGREGAT KASAR DARI KECAMATAN MANTUP date: 2019-05-17 words: 2399 flesch: 60 summary: Pemeriksaan Serat Eceng gondok Serat eceng gondok yang digunakan adalah eceng gondok yang diproses sendiri oleh peneliti sehingga menjadi serat eceng gondok yang dibutuhkan. Jika ingin membuat beton berkualitas baik, dalam arti memenuhi persyaratan yang lebih ketat karena tuntutan yang lebih tinggi, maka harus diperhitungkan dengan seksama cara-cara memperoleh adukan beton(beton segar/fresh concrete) yang baik dan beton (beton keras / hardened concrete) keywords: agregat; astm; bahan; beton; dan; dari; dengan; eceng; gondok; issn; kuat; pada; penelitian; pengujian; serat; tekan; untuk; yang cache: ukarst-348.pdf plain text: ukarst-348.txt item: #19 of 41 id: ukarst-349 author: Istighfarin, Muttaqin Fauzin; Hepiyanto, Rasio title: PENGARUH PENAMBAHAN SERAT ECENG GONDOK PADA KUAT TEKAN PAVING BLOCK K-200 date: 2019-05-17 words: 2383 flesch: 58 summary: Pemeriksaan Serat Eceng gondok Serat eceng gondok yang digunakan adalah eceng gondok yang diproses sendiri oleh peneliti sehingga menjadi serat eceng gondok yang dibutuhkan. Pengolahan Data Penelitian, 2018 3.3 Model hubungan penambahan serat eceng gondok dengan kuat tekan paving block Analisa regresi linier sederhana, untuk memperoleh suatu model regresi yang menggambarkan hubungan antara satu variabel bebas (penambahan serat eceng gondok) dan satu variabel terikat (kuat tekan paving block). keywords: astm; beton; block; cm²; dan; dari; dengan; eceng; gondok; issn; kuat; pada; paving; penelitian; serat; tekan; yang cache: ukarst-349.pdf plain text: ukarst-349.txt item: #20 of 41 id: ukarst-350 author: Kurniawan, Teguh; Lubis, Zulkifli title: ALTERNATIF PENGGUNAAN SERAT ECENG GONDOK PADA CAMPURAN STONE MATRIX ASPHALT GRADASI HALUS MENINGKATKAN STABILITAS CAMPURAN ASPAL PANAS date: 2019-05-17 words: 2557 flesch: 48 summary: e. Pada kondisi aspal optimum kelelahan plastis (flow) campuran mengalami penurunan dari 1%, 2%, 3%, 5%, dan yang mengalami kenaikan 4%, seiring dengan bertambahnya persentase kadar selulosa enceng gondok dalam campuran, dalam hal ini titik Flow terdapat pada variasi penambahan serat selulosa sebesar 4,9 % dari berat aspal pada campuran dengan nilai Flow sebesar 2,23 mm. In The Mix dengan kadar serat eceng gondok diatas didapatkan nilai tertinggi pada penambahan kadar serat 5 %. keywords: aspal; asphalt; campuran; dalam; dan; dari; dengan; eceng; gondok; ini; issn; kadar; marshall; nilai; pada; penelitian; selulosa; serat; untuk; yang cache: ukarst-350.pdf plain text: ukarst-350.txt item: #21 of 41 id: ukarst-3544 author: Apriani, Dyah Wahyu; Safitri, Dhea; Mustofa, Umar; Khala, Christianto Credidi Septino title: Prediction of Soil Bearing Capacity in the Masterplan Area of the Kalimantan Institute of Technology based on GIS date: 2022-11-30 words: 5374 flesch: 56 summary: From this map, it will be known how the distribution of bearing capacity and cone resistance distribution in ITK, soil consistency and which method is most appropriate in predicting the bearing capacity and cone resistance values based on actual data. The values of the qc indicate this and Qall ranges closest to the sample data used so that the mapping of bearing capacity and cone resistance values using the IDW method can be used as an initial approach in planning foundations at the areas where bearing capacity and cone resistance values have not been sampled. keywords: bearing; bearing capacity; capacity; cone; data; interpolation; method; resistance; soil; value cache: ukarst-3544.pdf plain text: ukarst-3544.txt item: #22 of 41 id: ukarst-357 author: Zaenuri, Moch; Romadhon, Romadhon; Gunarto, April title: PENELITIAN PENGGUNAAN BATU GAMPING SEBAGAI AGREGAT KASAR DAN FILLER PADA ASPAL CAMPURAN AC-BC date: 2018-01-23 words: 1863 flesch: 61 summary: Lapis ini diharuskan mempunyai kekauan dan ketebalan yang baik untuk mengurangi tekanan akibat beban kendaraandan harus memiliki karakteristik stabilitas. Selanjutnya dilakukan uji agregat halus dan kasar yang melingkupi uji ayakan, penyerapan air, dan berat jenis pada agregat, sedangkan filler hanya dilakukan pengujian analisa saringan saja. keywords: agregat; aspal; batu; campuran; dan; dari; dengan; hal; issn; jalan; kadar; nilai; pada; sni; stabilitas; untuk; yang cache: ukarst-357.pdf plain text: ukarst-357.txt item: #23 of 41 id: ukarst-362 author: Anam, Sulik; Pratikto, Herlan title: PENGUJIAN PERKERASAN ASPAL PORUS DENGAN PENAMBAHAN TREAD BAN BEKAS PADA UJI MARSHALL date: 2018-09-16 words: 2585 flesch: 66 summary: Tujuan penelitian ini adalah untuk mengetahui seberapa besar pengaruh campuran laston dengan penggunakan penambah tread ban bekas, dan bagaimana variasi campuran optimal dalam mencapai stabilitas dan flow yang disyaratkan dengan penambahan tread ban bekas, serta hasil KAO sebagai efisiensi penggunaan aspal. Dalam hal ini walaupun sudah diberi penambahan tread ban bekas tetapi masih ada rongga pada benda uji dikarenakan adanya ikatan pada aspal dan tread ban bekas sebelum aspal itu menyelimuti agregat secara sempurna, namun jika dilihat pada grafik 5 menunjukkan bahwa prosentase rongga pada setiap penambahan kadar aspal dan tread ban bekas tidak terjadi peningkatan terlalu besar bahkan nilainya cenderung sama. keywords: aspal; ban; bekas; campuran; dan; dari; dengan; hasil; issn; nilai; pada; penambahan; stabilitas; tread; yang cache: ukarst-362.pdf plain text: ukarst-362.txt item: #24 of 41 id: ukarst-363 author: Romadhon, Romadhon; Zaenuri, Moch; Pratikto, Herlan title: PERENCANAAN SISTEM DRAINASE DAN TROTOAR Studi Kasus : Lingkungan Kelurahan Banjaran Kota Kediri date: 2019-01-13 words: 1982 flesch: 58 summary: Dengan adanya perencanaan sistem saluran drainase dan trotoar yang baik, ekonomis dan sesuai kebutuhan pada wilayah Oleh sebab itu perlu dilakukan perencanaan saluran drainase dan trotoar yang memenuhi kebutuhan dari debit air yang akan lewat saluran di lokasi Kelurahan Banjaran Kota Kediri. keywords: air; dan; dari; debit; dengan; detik; dimensi; drainase; hujan; issn; perencanaan; perhitungan; saluran; untuk; yang cache: ukarst-363.pdf plain text: ukarst-363.txt item: #25 of 41 id: ukarst-374 author: Gardjito, Edy; Candra, Agata Iwan; Cahyo, Yosef title: PENGARUH PENAMBAHAN BATU KARANG SEBAGAI SUBSTITUSI AGREGAT HALUS DALAMPEMBUATAN PAVING BLOCK date: 2018-01-17 words: 1884 flesch: 63 summary: 1.3.2 Paving Block Paving block adalah suatu benda yang terbuat dari campuran semen, agregat halus, agregat kasar dan air yang mengeras dengan bentuk dan mutu yang sudah ditentukan. dari agregat halus normal mengalami peningkatan nilai kuat tekan yang dihasilkan sebesar 22,1 MPa, 20,3 MPa, 19,9 keywords: agregat; air; bahan; batu; beton; dan; dari; dengan; halus; issn; karang; kuat; mpa; pada; paving; tekan; untuk; yang cache: ukarst-374.pdf plain text: ukarst-374.txt item: #26 of 41 id: ukarst-411 author: Pratikto, Herlan; Ajiono, Rekso title: PENELITIAN KUAT UJI TEKAN BETON DENGAN MEMANFAATKAN LIMBAH BETON YANG TIDAK TERPAKAI date: 2017-09-17 words: 1568 flesch: 67 summary: Oleh karena itu, pada penelitian ini kami akan mencoba mengaplikasikan limbah beton yang Hal 102 UkaRsT VOL.1, NO.2 TAHUN 2017 p ISSN 2579-4620 e Langkah pembuatan campuran beton : 1. Menakar seluruh campuran yang dibutuhkan baik abgregat halus, semen, agregrat kasar (kerikildan beton yang tidak terpakai), air sesuai dengan mix design, untuk beton yang tidak terpakai campuran mengunakan Variasi 10%, 15%,20%, dan 25% di setiap campurannya. keywords: beton; campuran; dalam; dan; dengan; issn; kuat; penelitian; tekan; uji; untuk; yang cache: ukarst-411.pdf plain text: ukarst-411.txt item: #27 of 41 id: ukarst-476 author: Hartantyo, Sugeng Dwi; Susianto, Muhammad Hakim title: PENGARUH PENAMBAHAN TUMBUKAN CANGKANG KEONG MAS TERHADAP KUAT TEKAN BETON NON STRUKTURAL K-175 date: 2019-11-01 words: 2490 flesch: 60 summary: The results of collisions of mas snail shells on concrete mixtures with additional variations of 2% (15,423), 4% (17,59) and 6% (19,276), where the highest compressive strength values were obtained by adding 6% of snail shell shells, 19,276 Mpa, while the lowest value is in the addition of mash snail shell collision 2%, which is 15,423 Mpa. Keywords: Concrete, Compressive Strength, Non Structural K-175, Conch Shell Waste ABSTRAK Tujuan peneliantian Untuk mengetahui proses pembuatan tumbukan cangkang keong mas terdahap kuat tekan beton dan. Bahan yang di gunakan dalam penelitian ini adalah semen Portland, air, agregat halus, agregat kasar, bahan tambah dan tumbukan cangkang keong mas, Adapun benda uji berupa cetakan beton silinder untuk mencetak beton yang akan diuji dalam penelitian campuran beton menggunakan tumbukan cangkang keong mas sebagai bahan campuran beton, uji bahan kimia dan kuat tekan beton akan dilakuan untuk mengatahui kandungan bahan kimia dalam campuran beton dan berapa kekuatan beton tersebut. keywords: bahan; beton; campuran; cangkang; dan; data; dengan; issn; keong; kuat; mas; penelitian; pengujian; semen; tekan; teknik; tumbukan; yang cache: ukarst-476.pdf plain text: ukarst-476.txt item: #28 of 41 id: ukarst-492 author: Wibisono, Endro; Cahyono, Muhammad Shofwan Donny; Muhtadi, Adhi title: ANALISIS KINERJA SIMPANG BERSINYAL DI SIMPANG PAPAR UNTUK PERENCANAAN JALAN TOL KERTOSONO-KEDIRI date: 2019-11-12 words: 2328 flesch: 70 summary: Simpang bersinyal Simpang Papar akibat pembangunan jalan tol Kertosono-Kediri akan menurun nilai DS nya dengan dilakukan rencana pembangunan jalan tol Kertosono - Kediri sehingga pada nilai DS dibawah 1 (satu). Kemacetan yang di akibatkan arus volume lalu lintas yang cukup padat serta antrian di persimpangan cukup panjang. keywords: dan; hari; jam; kediri; kertosono; lalu; lintas; pada; papar; puncak; simpang; smp; tahun; volume; yang cache: ukarst-492.pdf plain text: ukarst-492.txt item: #29 of 41 id: ukarst-602 author: Kartikasari, Dwi; Sanhadi, Deny title: STUDI EVALUASI PONDASI TIANG PANCANG (Spun Pile) DENGAN PONDASI TIANG BOR (Bored Pile) PADA GEDUNG KANTOR PEMERINTAH KABUPATEN LAMONGAN date: 2019-11-16 words: 2759 flesch: 72 summary: Namun ada bagian terpenting dari struktur gedung adalah pondasi yang menjaga kestabilan struktur bagian bawah (Indra Dwi Prasetya ,2018). Berdasarkan jenis tanah dan kedalaman tanah keras, pondasi dibedakan menjadi dua yaitu pondasi dangkal dan pondasi dalam. keywords: beban; dan; daya; dukung; gedung; issn; pada; penurunan; perhitungan; pile; pondasi; tanah; tiang; untuk; yang; × � cache: ukarst-602.pdf plain text: ukarst-602.txt item: #30 of 41 id: ukarst-606 author: Affandy, Nur Azizah; Bukhori, Agus Imam title: PENGARUH PENAMBAHAN ABU SERABUT KELAPA TERHADAP KUAT TEKAN BETON date: 2019-11-19 words: 2270 flesch: 66 summary: Pembuatan Abu Serabut kelapa Pembuatan abu serabut kelapa yang nantinya untuk pembuatan beton. Abu serabut kelapa berasal dari pengolahan limbah serabut kelapa yang dibakar yang kemudian menjadi abu. keywords: agregat; astm; beton; campuran; dengan; diperoleh; hasil; issn; kelapa; kuat; mpa; penelitian; serabut; tekan; untuk; yang cache: ukarst-606.pdf plain text: ukarst-606.txt item: #31 of 41 id: ukarst-658 author: Kartikasari, Dwi; sudarso, Ilham title: KAJIAN BAHAN TAMBAH ATERNATIF SERAT ECENG GONDOK TERHADAP CAMPURAN LATASIR SAND SHEET KELAS A SPESIFIKASI SEKSI-6 2010 BINA MARGA date: 2017-03-09 words: 2851 flesch: 58 summary: ISSN 2581-0855 Eceng gondok dapat meningkatnya evapotranspirasi (penguapan dan hilangnya air melalui daun-daun tanaman), karena daun-daunnya yang lebar dan serta pertumbuhannya yang cepat, menurunnya jumlah cahaya yang masuk kedalam perairan sehingga menyebabkan menurunnya tingkat kelarutan oksigen dalam air dan berkurangnya ekosistem bawah laut, tumbuhan eceng gondok yang sudah mati akan turun ke dasar perairan sehingga mempercepat terjadinya proses pendangkalan yang menyebabkan terjadinya banjir, meningkatnya habitat bagi vektor penyakit pada manusia.menurunkan nilai estetika lingkungan perairan. Dengan melihat eceng gondok yang banyak tumbuh di daerah tersebut kami mencoba memanfaatkan eceng gondok sebagai serat selulosa sebagai bahan campuran alternative campuran lapis tipis aspal beton agar bisa mengatasi masalah ekologi lingkungan yang di sebabkan oleh eceng gondok yang di angap sebagai gulma dan meningkatkan nilai ekonomis eceng gondok sertas membatu menangani lapis perkerasan lentur jalan raya. keywords: agregat; aspal; asphalt; bahan; campuran; dan; dengan; eceng; gondok; hasil; issn; jakarta; kadar; marshall; pada; penelitian; selulosa; serat; sumber; void; yang cache: ukarst-658.pdf plain text: ukarst-658.txt item: #32 of 41 id: ukarst-690 author: Wibisono, Endro title: Analisa Dampak Lalu Lintas Jalan Tambak Osowilangun Akibat Pembangunan Teluk Lamong Surabaya date: 2020-04-29 words: 4796 flesch: 66 summary: Pembebanan yang terjadi menuju Surabaya jumlah kendaraan sepada motor (MC) = 5715 kend/jam, kendaraan ringan (LV) = 139 Kend/jam dan kendaraan berat (HV) = 48 kend/jam. Dan menuju Gresik jumlah kendaraan sepada motor (MC) = 2864 kend/jam, kendaraan ringan (LV) = 84 Kend/jam dan kendaraan berat (HV) = 84 kend/jam. keywords: analisa; arah; dan; dari; gresik; jalan; jam; jumlah; kend; kendaraan; lalu; lamong; lintas; menuju; surabaya; teluk; yang cache: ukarst-690.pdf plain text: ukarst-690.txt item: #33 of 41 id: ukarst-701 author: Al-hasan, Susilo Abadi; Hartantyo, Sugeng Dwi title: PENGARUH LIMBAH PABRIK GULA MOLASE SEBAGAI BAHAN TAMBAH (ADMIXTURE) KUAT TEKAN BETON K-175 DENGAN MENGGUNAKAN PASIR LOKAL PASIR JOMBANG date: 2020-04-29 words: 3991 flesch: 67 summary: Berdasarkan penelitian yang dilakukan diperoleh nilai slump dari beton normal sebesar 9 cm, dari beton dengan penambahan limbah molase 0,4% didapat nilai slump sebesar 13 cm, dan beton dengan penambahan limbah molase 0,5% didapat nilai slump sebesar 14 cm. Pada beton segar dilakukan pengujian slump dan pada beton keras dilakukan pengujian kuat tekan yang dilaksanakan saat umur beton 7 hari lalu dilakukan konversi ke umur 28 hari. keywords: agregat; bahan; berat; beton; dan; dari; data; dengan; hasil; issn; kuat; limbah; molase; nilai; pasir; penambahan; pengujian; rata; sebagai; tambah; tekan; yang cache: ukarst-701.pdf plain text: ukarst-701.txt item: #34 of 41 id: ukarst-708 author: Sucahyo, Ilham Adji; Agustapraja, Hammam Rofiqi; Damara, Bobby title: PEMANFAATAN LIMBAH TEMPURUNG KELAPA SEBAGAI CAMPURAN PAVING BLOCK (Ditinjau dari Kuat Tekan dan Resapan Air) date: 2020-04-29 words: 4152 flesch: 65 summary: Paving block merupakan bahan bangunan yang terdiri dari campuran semen, agregat dan air yang mengeras dengan bentuk dan mutu yang telah ditentukan. [4] Dengan manfaat paving block yang mampu menunjang fasilitas masyarakat maka dituntut pula kualitas paving block yang kuat dan mempunyai daya serap air serta kualitas yang baik yang sesuai dengan kriteria standar yang diperlukan keywords: air; arang; benda; block; campuran; dalam; dan; dari; dengan; issn; kelapa; kuat; pada; paving; penelitian; resapan; sebagai; tekan; tempurung; uji; yang cache: ukarst-708.pdf plain text: ukarst-708.txt item: #35 of 41 id: ukarst-73 author: Ajiono, Rekso; Budi, Ki Catur; Hepiyanto, Rasio title: IDENTIFIKASI CAMPURAN BETON BERPORI SEBAGAI LAPIS DASAR PERKERASAN KAKU date: 2017-11-11 words: 1884 flesch: 50 summary: Korelasi antara angka pori beton berpori dan permeabilitas Hal 133 UkaRsT VOL.1, NO.2 TAHUN 2017 METODE PENELITIAN Studi laboratorium properti dasar beton berpori kriteria sebagai lapisan dasar perkerasan kaku terdiri dari mengikuti tiga langkah utama: (a) campuran beton berpori proporsi desain; (B) pengukuran desain dasar parameter berdasarkan kepadatan baru, kuat tekan, membatalkan konten dan permeabilitas; (c) Korelasi statistik uji antar parameter. keywords: agregat; air; antara; berpori; beton; campuran; dan; dasar; dengan; issn; korelasi; kuat; lapisan; permeabilitas; untuk; yang cache: ukarst-73.pdf plain text: ukarst-73.txt item: #36 of 41 id: ukarst-77 author: Gardjito, Edy title: PENGENDALIAN MUTU BETON DENGAN METODE CONTROL CHART (SPC) DAN PROCESS CAPABILITY (SIX-SIGMA) PADA PEKERJAAN KONSTRUKSI date: 2017-11-11 words: 2658 flesch: 65 summary: Tetapi tidak semua jalan dan jembatan yang menghubungkan kabupaten dan kota di Jawa 1.2 Rumusan Masalah Sejauh mana kuantitas beton yang telah diproduksi apakah sudah sesuai dengan mutu beton yang diharapkan ? keywords: beton; chart; dan; dari; dengan; grafik; issn; kendali; kuat; mutu; nilai; proses; rata; sampel; tekan; yang cache: ukarst-77.pdf plain text: ukarst-77.txt item: #37 of 41 id: ukarst-782 author: Susanto, Sony; Hendy, Hendy; Winarno, Budi; Candra, Agata Iwan title: Measurement Of Occupational Safety And Health Risk Levels Of Kadiri University LP3M Building date: 2020-10-31 words: 5045 flesch: 69 summary: High Risk : High risk. Obtained one variable is categorized as level a very high risk (Very High Risk) is a variable touched objects that do not move or stumble, to the level of high risk (High Risk) obtained four variables, for level risk (Medium Risk) is obtained ten variables and for a low-risk level (Low Risk) 2 variables. keywords: building; health; issn; kadiri; lp3; measurement; risk; safety; university; vol cache: ukarst-782.pdf plain text: ukarst-782.txt item: #38 of 41 id: ukarst-788 author: Triswandana, Erick title: Penilaian Risiko K3 dengan Metode HIRARC date: 2020-04-29 words: 3916 flesch: 56 summary: Pada dasarnya, perusahaan konstruksi pelaksana proyek ini belum memiliki sertifikasi OHSAS 18001 dan seperti yang diketahui bahwa perusahaan yang tersertifikasi memiliki kemampuan lebih baik dalam pengelolaan Sistem Manajemen K3 dan hal tersebut mendukung pendapat bahwa Occupational Health and Safety Management System (OHSMS) Manajemen risiko K3 berkaitan dengan bahaya dan risiko yang ada di tempat kerja yang dapat menimbulkan kerugian bagi perusahaan[23][24]. keywords: adalah; dan; dapat; dari; dengan; high; hirarc; issn; kecelakaan; konstruksi; low; metode; pada; pekerjaan; penilaian; risiko; risk; safety; sebesar; suatu; ukarst; untuk; vol; yang cache: ukarst-788.pdf plain text: ukarst-788.txt item: #39 of 41 id: ukarst-79 author: Winarto, Sigit title: PEMANFAATAN SERAT IJUK SEBAGAI MATERIAL CAMPURAN DALAM BETON UNTUK MENINGKATKAN KEMAMPUAN BETON MENAHAN BEBAN TEKAN Studi Kasus: Pembangunan Homestay Singonegaran Kediri date: 2018-01-02 words: 3320 flesch: 69 summary: Hasil penelitian ini menghasilkan beton serat ijuk yang terdiri dari bahan yang memenuhi kriteria untuk membuat beton serat ijuk, yaitu: Pasir yang mempunyai berat jenis = 2.524; berat satuan = 2.586 gram/cm3; kadar air = 4.317% dan gradasi pasir yang termasuk yaitu pasir halus jenis sedang. Hal ini menyebabkan kuat tekan beton menjadi lebih baik, meskipun umur beton yang menggunakan serat ijuk pada umur 21 hari saat uji tekan, yang dikonversi dari umur 28 hari. keywords: agregat; bahan; berat; beton; campuran; dalam; dan; dari; dengan; gradasi; halus; ijuk; issn; kasar; kuat; pada; pasir; pemeriksaan; sni; tekan; untuk; yang cache: ukarst-79.pdf plain text: ukarst-79.txt item: #40 of 41 id: ukarst-82 author: Gardjito, Edy title: PENGENDALIAN JADWAL DAN ANGGARAN TERPADU DENGAN METODE EARNED VALUE ANALYSIS PADA PEKERJAAN KONSTRUKSI date: 2018-01-02 words: 1648 flesch: 61 summary: Tetapi tidak semua jalan dan jembatan yang menghubungkan kabupaten dan kota di telah memadai. Penyelesaian Proyek Berdasarkan nilai PV, EV dan AC saat pelaporan hari ke-150 dan indikator CPI dan SPI yang didapat sebelumnya dapat diprediksikan biaya yang akan dikeluarkan dan waktu yang diperlukan untuk penyelesain seluruh pekerjaan, yang disajikan pada tabel dibawah ini, dan jika kinerja saat pelaporan tetap sama sampai sisa pekerjaan terselesaikan, maka prediksi biaya yang dikeluarkan untuk menyelesaikan seluruh pekerjaan (EAC) adalah sebesar Rp. 5,8950 milyar yang berarti masih dibawah rencana anggaran (PV) yaitu sebesar Rp. 6,0874 milyar, dan masih ada keuntungan keywords: biaya; dan; dari; dengan; hari; ini; issn; jadwal; milyar; nilai; pada; proyek; value; waktu; yang cache: ukarst-82.pdf plain text: ukarst-82.txt item: #41 of 41 id: ukarst-83 author: Candra, Agata Iwan title: ANALISIS DAYA DUKUNG PONDASI STROUS PILE PADA PEMBANGUNAN GEDUNG MINI HOSPITAL UNIVERSITAS KADIRI date: 2018-01-02 words: 3109 flesch: 66 summary: Analisis ini hanya akan menghitung daya dukung tiang berdasarkan kekuatan tanah, perhitungan daya dukung tiang kelompok, dan data pembebanan berdasarkan data struktur atas dari perhitungan SAP2000. Jumlah tiang pancang sangat mempengaruhi nilai daya dukung tiang kelompok, semakin banyak tiang pancang yang digunakan, maka nilai daya dukung tiang kelompok semakin besar dan semakin aman untuk memikul beban bangunan, akan tetapi kurang ekonomis dari pertimbangan biaya. keywords: dan; daya; dengan; dukung; issn; kapasitas; kedalaman; meyerhof; pada; pondasi; tanah; tiang; vol; yang cache: ukarst-83.pdf plain text: ukarst-83.txt